Filter interviews by
I applied via Referral and was interviewed in Nov 2023. There were 3 interview rounds.
Toe and heel are parts of a retaining wall. Toe refers to the non-earth portion while heel refers to the earth portion.
Toe and heel are terms used in the context of retaining walls.
Toe refers to the non-earth portion of the wall.
Heel refers to the earth portion of the wall.
Toe provides stability and prevents sliding of the wall.
Heel provides support and resists the pressure exerted by the earth.
Toe and heel are importa...
There are various types of concrete used in construction, each with different strength and durability characteristics.
Concrete is classified based on its compressive strength, measured in megapascals (MPa).
Common types of concrete include M5, M7.5, M10, M15, M20, M25, M30, M35, M40, M45, and M50.
The number after 'M' represents the compressive strength of the concrete in MPa.
For example, M20 concrete has a compressive s...
A Kuplak pipe can withstand a load of 4 tons.
The load-bearing capacity of a Kuplak pipe is 4 tons.
This information is specific to Kuplak pipes and may vary for other types of pipes.
It is important to consider the weight distribution and other factors when determining the load capacity of a pipe.
Example: A Kuplak pipe can support the weight of a small car or heavy machinery.
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.
Some of the top questions asked at the Apco Infratech Junior Structural Engineer interview for experienced candidates -
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
141
salaries
| ₹5.2 L/yr - ₹15.5 L/yr |
Senior Engineer
136
salaries
| ₹4.2 L/yr - ₹11.4 L/yr |
Site Engineer
96
salaries
| ₹3 L/yr - ₹7 L/yr |
Deputy Manager
82
salaries
| ₹7 L/yr - ₹18 L/yr |
Store Officer
76
salaries
| ₹2.2 L/yr - ₹5.8 L/yr |
AECOM
L&T Energy Hydrocarbon
Saipem
Aarvee Associates