i
Apar Industries
Filter interviews by
I applied via Referral and was interviewed before Jun 2021. There were 2 interview rounds.
They asked are u able to work for 12-13 hours and give 3 to 4 simple maths questions in written to solve . They asked for having any health issues because if u r not physically fit then not able to work for 12 to 13 hours a day. A perfect professional company just for earning profit nothing is good for the engineer or workers .
A one line for Apar industry - "Naam bade aur darshan chhote ". Only the hard one survive there if 20 persons start the job , after a year only 2 or 3 person able to survive there .
Top trending discussions
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I was interviewed before May 2023.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed in Feb 2023. There were 4 interview rounds.
About CCM & customer related work. How to improve work.
I was interviewed before Feb 2024.
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
posted on 5 Nov 2023
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Electrical testing for equipment involves verifying functionality and safety through various tests.
Perform insulation resistance tests to check for any leakage currents
Conduct continuity tests to ensure proper electrical connections
Verify voltage and current ratings are within acceptable limits
Test for proper grounding to prevent electrical hazards
Use specialized equipment like multimeters and insulation testers
Documen
Different cable types have varying current carrying capacities and methods of laying, impacting overall electrical system performance.
Different cable types such as PVC, XLPE, and rubber have different current carrying capacities.
Current carrying capacity is influenced by factors like conductor size, insulation material, and ambient temperature.
Methods of laying cables include direct burial, conduit installation, and ov...
Costing and estimation assignment for Senior Engineer position
Understand the scope of the project and gather all relevant information
Break down the project into smaller tasks and estimate the time and cost for each task
Consider factors such as materials, labor, equipment, and overhead costs
Use historical data or industry benchmarks to validate your estimates
Provide a detailed cost breakdown and justification for your e
Computer software skills
Estimation & costing related work
based on 4 reviews
Rating in categories
Assistant Manager
211
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
86
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Officer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
56
salaries
| ₹0 L/yr - ₹0 L/yr |
Officer
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Finolex Industries
KEI Industries
Polycab Wires
Havells