Filter interviews by
I applied via Referral and was interviewed before Jul 2022. There were 2 interview rounds.
Top trending discussions
posted on 27 Jun 2024
I am passionate about overseeing construction projects and ensuring they are completed successfully.
I have a strong background in construction management with X years of experience.
I enjoy the challenge of coordinating various teams and resources to meet project deadlines.
I am excited about the opportunity to work on high-profile projects and contribute to their success.
I am motivated by the chance to problem-solve and...
The area of safety officer or construction management should be offered in the field of construction.
Offer safety officer positions in construction sites to ensure compliance with safety regulations and prevent accidents.
Provide opportunities for construction management roles to oversee project planning, scheduling, and budgeting.
Encourage training and certification in safety management and construction project managem...
posted on 2 Feb 2025
I was interviewed in Jan 2025.
posted on 28 Jul 2024
posted on 24 Oct 2024
It was easy sorting questions
posted on 28 Apr 2024
I was interviewed in Oct 2023.
There are typically two chambers in an overhead tank (OHT).
Most OHTs have two chambers - one for storing water and one for controlling the water level.
The water storage chamber holds the water supply, while the control chamber manages the flow of water into the tank.
Having two chambers helps in maintaining a consistent water supply and pressure in the tank.
The concrete and reinforcement quantity in an OHT depends on the design specifications and dimensions of the overhead tank.
Concrete quantity is calculated based on the volume of the tank and the required thickness of the walls and base.
Reinforcement quantity is determined by the structural design requirements for strength and durability.
Factors such as load capacity, water pressure, and seismic considerations also impa...
My expected CTC is negotiable based on the responsibilities and opportunities offered by the position.
My expected CTC is based on industry standards and my level of experience.
I am open to discussing the compensation package during the interview process.
I am looking for a competitive salary that reflects my skills and contributions to the company.
posted on 11 Feb 2024
The MR value of DBM with PMB is more than DBM with VG40.
MR value refers to the Marshall Stability value, which measures the strength and stability of an asphalt mix.
DBM stands for Dense Bituminous Macadam, VG40 and PMB are types of bitumen used in the mix.
DBM with PMB has a higher MR value compared to DBM with VG40 due to the improved properties of PMB.
PMB (Polymer Modified Bitumen) enhances the durability, flexibility...
posted on 21 Feb 2024
I applied via Walk-in and was interviewed before Feb 2023. There were 3 interview rounds.
Computer base test Technical & Reasoning questions
posted on 20 May 2023
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
The deadmen depth depends on the soil type and the load-bearing capacity of the soil.
Deadmen depth is the depth at which deadmen are installed to anchor retaining walls or other structures.
It is determined by the soil type and the load-bearing capacity of the soil.
For example, in sandy soil, the deadmen depth may need to be deeper than in clay soil.
The depth can also vary depending on the height and weight of the struc
I applied via Recruitment Consulltant and was interviewed before Jul 2023. There was 1 interview round.
I have experience working with minor irrigation systems, including design, installation, and maintenance.
Designed irrigation systems for small-scale agricultural projects
Installed drip irrigation systems for gardens and landscaping
Performed routine maintenance on irrigation pumps and pipes
Troubleshooted and repaired irrigation system malfunctions
Interview experience
based on 1 review
Rating in categories
Planning Engineer
5
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Quantity Surveyor
4
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Project Construction Manager
4
salaries
| ₹6 L/yr - ₹7.5 L/yr |
Project Engineer
3
salaries
| ₹3.6 L/yr - ₹4.5 L/yr |
Senior Site Engineer
3
salaries
| ₹3.3 L/yr - ₹4.2 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd