Upload Button Icon Add office photos

Filter interviews by

Aneja Constructions (India) Site Engineer Interview Questions and Answers

Updated 22 Oct 2023

Aneja Constructions (India) Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 14 Oct 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Oct 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. 1. How many years experience 2. What your previous company name and whats role and designation your in previous company
  • Q2. 3. What are going on this company, and how many cast of this project
  • Q3. 4. Construction of 100 beded
  • Q4. When you can join in my company

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. What is penitration test
  • Ans. 

    Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.

    • Penetration test involves identifying vulnerabilities in a system or network.

    • It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.

    • The goal of a penetration test is to strengthen the security defenses of the system or network.

    • Common ...

  • Answered by AI
  • Q2. What is water proofing
  • Ans. 

    Waterproofing is a process of making a structure or material resistant to the penetration of water.

    • Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.

    • It is commonly used in construction to protect buildings from water damage.

    • Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.

  • Answered by AI
  • Q3. Types of foundation
  • Ans. 

    Types of foundation include shallow, deep, and pile foundations.

    • Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.

    • Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.

    • Pile foundations are deep foundations that consist of long, slender columns driven...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Experience, previous salary, previous co. Name, total Experience letter, salary slip and discuss for location
Round 2 - Case Study 

Kis co. Me kya kya kaam kiya

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Some basic questions about Ofc work and personal information
  • Q2. Ofc cable blowing how to start
  • Ans. 

    To start OFC cable blowing, follow these steps

    • Ensure that the ducts are clean and free of any obstruction

    • Attach the cable blowing machine to the duct

    • Connect the cable to the machine and start the blowing process

    • Monitor the cable's progress and adjust the machine's speed as needed

    • Once the cable has been blown through the entire length of the duct, detach the machine and cable

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bondada Engineering Site Engineer interview:
  • Nld
  • Lm
Interview preparation tips for other job seekers - No fear in answering questions be strong
Just one interview it's enough to get job in bepl
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. What is bar bending schedule
  • Ans. 

    Bar bending schedule is a document that provides details of reinforcement steel bars used in construction projects.

    • It includes details such as bar mark, bar size, quantity, shape, and bending dimensions.

    • Helps in estimating the quantity of steel required for construction.

    • Ensures proper placement and bending of reinforcement bars as per design specifications.

    • Used by contractors, engineers, and construction workers for re...

  • Answered by AI
  • Q2. 28 days concrete strength
  • Ans. 

    28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing.

    • 28 days concrete strength is the standard measure of concrete's compressive strength after 28 days of curing

    • It is important for assessing the quality of concrete and its ability to support structural loads

    • The strength of concrete typically continues to increase beyond 28 days, but 28 days is the standard testing

  • Answered by AI
  • Q3. Difference between mivan and conventional
  • Ans. 

    Mivan is a modern construction technique using aluminum formwork, while conventional construction involves traditional methods like brick and mortar.

    • Mivan is faster and more efficient than conventional construction methods.

    • Mivan requires skilled labor for installation of aluminum formwork.

    • Conventional construction is more labor-intensive and time-consuming.

    • Mivan provides better quality finishes compared to conventional...

  • Answered by AI
  • Q4. What is self leveling concrete
  • Ans. 

    Self leveling concrete is a type of concrete that has a high flow consistency and is used to create smooth and level surfaces.

    • Self leveling concrete is designed to flow easily and settle into place without the need for troweling or leveling.

    • It is commonly used to level uneven floors before installing flooring materials such as tile or carpet.

    • Self leveling concrete can be applied in thicknesses ranging from a featheredg...

  • Answered by AI
  • Q5. How many days will take 1st Aluform mockup Concreting
  • Ans. 

    The 1st Aluform mockup concreting typically takes 1-2 days to complete.

    • 1-2 days is the usual timeframe for 1st Aluform mockup concreting

    • Factors such as weather conditions, size of the mockup, and availability of resources can affect the duration

    • Proper planning and coordination can help expedite the process

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Shimizu Senior Site Engineer interview:
  • Construction
  • Structural
  • Quality Control
  • Quality Assurance
  • Bar Bending Schedule
  • Project Execution
Interview preparation tips for other job seekers - Be active and action to learn every step and work hard and smart . Please ensure technical criticis and how it resolve it
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Hello what is your name
  • Q2. How much salary you want
Round 2 - HR 

(2 Questions)

  • Q1. Lets discuss about money
  • Q2. Where do you want to go
Round 3 - HR 

(2 Questions)

  • Q1. Where do you from
  • Q2. Are you interested to work

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Interview experience
3
Average
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. How mane year experience
  • Q2. I'm interested sir
  • Q3. Total 18 year experience in power plant & oil and gas plant
  • Ans. 

    I have a total of 18 years of experience in power plant and oil and gas plant.

    • Experience includes working on various projects in power plant and oil and gas plant

    • Knowledge of electrical systems, equipment, and regulations in these industries

    • Hands-on experience in maintenance, troubleshooting, and project management

    • Strong understanding of safety protocols and procedures in high-risk environments

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 2 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked My previous projects details
  • Q2. I'm telling all answers

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical it lasted for about 30 minute's. Most of questions asked to me were related to my previous projects

Aneja Constructions (India) Interview FAQs

How many rounds are there in Aneja Constructions (India) Site Engineer interview?
Aneja Constructions (India) interview process usually has 2 rounds. The most common rounds in the Aneja Constructions (India) interview process are HR and Resume Shortlist.

Tell us how to improve this page.

Aneja Constructions (India) Site Engineer Salary
based on 6 salaries
₹2.1 L/yr - ₹3.8 L/yr
17% less than the average Site Engineer Salary in India
View more details

Aneja Constructions (India) Site Engineer Reviews and Ratings

based on 3 reviews

4.4/5

Rating in categories

5.0

Skill development

4.7

Work-life balance

3.5

Salary

3.7

Job security

3.8

Company culture

3.8

Promotions

4.4

Work satisfaction

Explore 3 Reviews and Ratings
Civil Site Engineer
14 salaries
unlock blur

₹2.4 L/yr - ₹5.4 L/yr

Site Engineer
6 salaries
unlock blur

₹2.2 L/yr - ₹3.8 L/yr

QA QC Engineer
5 salaries
unlock blur

₹2.3 L/yr - ₹3.6 L/yr

Planning & Billing Engineer
5 salaries
unlock blur

₹3 L/yr - ₹5.4 L/yr

Senior Accountant
5 salaries
unlock blur

₹2.7 L/yr - ₹4.9 L/yr

Explore more salaries
Compare Aneja Constructions (India) with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.1
Compare

Punj Lloyd

4.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview