I applied via Referral and was interviewed in Dec 2024. There were 2 interview rounds.
OPC and PPC are types of cement used in construction. OPC is Ordinary Portland Cement and PPC is Portland Pozzolana Cement.
OPC is a type of cement that is commonly used in construction due to its high strength and durability.
PPC is a type of cement that contains pozzolanic materials like fly ash, which makes it more resistant to chemical attacks.
OPC is ideal for structures that require high strength, such as bridges an...
Some necessary IS Codes for RCC include IS 456:2000, IS 3370:2009, IS 1786:2008.
IS 456:2000 - Code of practice for plain and reinforced concrete
IS 3370:2009 - Code of practice for concrete structures for storage of liquids
IS 1786:2008 - Specification for high strength deformed steel bars and wires for concrete reinforcement
Top trending discussions
I applied via Naukri.com and was interviewed in May 2019. There were 3 interview rounds.
TG interlock is a safety mechanism that prevents simultaneous operation of two or more circuit breakers.
TG interlock ensures that only one circuit breaker can be closed at a time.
It prevents damage to equipment and ensures safety of personnel.
For example, if two circuit breakers are connected to the same transformer, TG interlock will prevent both breakers from being closed simultaneously.
TG interlock is commonly used ...
I am good work and good health a
I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.
I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.
Maintenance problems and solutions
Equipment breakdowns - regular maintenance checks and repairs
Lack of spare parts - inventory management and ordering in advance
Inefficient processes - process optimization and automation
Safety hazards - regular safety inspections and training
Environmental concerns - proper disposal of hazardous waste
Budget constraints - prioritization and cost-effective solutions
I applied via Approached by Company and was interviewed before May 2018. There were 2 interview rounds.
Time to remove formwork varies for different types of structural members.
Time to remove formwork for columns is typically 1-2 days
Time to remove formwork for beams is usually 7 days
Time to remove formwork for slabs can range from 7-28 days depending on the type of concrete used
Time to remove formwork for walls is generally around 24 hours
Different grades of cement refer to the varying strengths and compositions of cement used in construction.
Different grades of cement are classified based on their compressive strength, such as 33 grade, 43 grade, and 53 grade.
The higher the grade number, the higher the compressive strength of the cement.
Each grade of cement is suitable for different types of construction projects, with 53 grade cement being commonly us
I applied via Referral and was interviewed in Dec 2022. There were 5 interview rounds.
Jombay test only aptitude test
I applied via Recruitment Consultant and was interviewed before Jan 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Senior Executive
27
salaries
| ₹3.5 L/yr - ₹6.6 L/yr |
Assistant Engineer
22
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Area Sales Manager
22
salaries
| ₹5.4 L/yr - ₹13.4 L/yr |
Sales Officer
20
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Assistant Manager
19
salaries
| ₹5.9 L/yr - ₹8.9 L/yr |
Nuvoco Vistas
Infra.Market
Jaquar
JSW Cement