Time to remove formwork varies for different types of structural members.
Time to remove formwork for columns is typically 1-2 days
Time to remove formwork for beams is usually 7 days
Time to remove formwork for slabs can range from 7-28 days depending on the type of concrete used
Time to remove formwork for walls is generally around 24 hours
Different grades of cement refer to the varying strengths and compositions of cement used in construction.
Different grades of cement are classified based on their compressive strength, such as 33 grade, 43 grade, and 53 grade.
The higher the grade number, the higher the compressive strength of the cement.
Each grade of cement is suitable for different types of construction projects, with 53 grade cement being commonly us
Top trending discussions
I appeared for an interview in Jul 2020.
I applied via Recruitment Consultant and was interviewed before Aug 2022. There were 2 interview rounds.
I applied via Indeed and was interviewed in Jul 2023. There were 2 interview rounds.
The erection of a cement mill involves the installation and assembly of the mill equipment and machinery.
The cement mill is typically a large cylindrical structure where raw materials are ground into fine powder.
The erection process includes the installation of the mill shell, liners, diaphragm, and grinding media.
Proper alignment and leveling of the mill components are crucial for efficient operation.
Electrical and me...
The procedure of erection involves the process of assembling and installing structural components to create a stable and functional structure.
Planning and preparation
Site preparation and foundation
Assembly of structural components
Installation of utilities and systems
Finishing and testing
Final inspection and handover
Planning of the erection involves creating a detailed plan for the construction process.
Identify the scope and objectives of the project
Determine the sequence of activities and their dependencies
Allocate resources and manpower
Create a schedule and timeline
Consider safety measures and risk management
Coordinate with other teams and stakeholders
Monitor progress and make adjustments as necessary
I applied via Campus Placement and was interviewed before May 2022. There were 3 interview rounds.
Test based on basic Mining knowledge
I am a dedicated civil engineer with a passion for designing and constructing sustainable infrastructure.
Graduated with a degree in Civil Engineering from XYZ University
Experienced in designing structures such as bridges, roads, and buildings
Proficient in using software like AutoCAD and Revit for drafting and modeling
Strong problem-solving skills and attention to detail
Completed internships at construction firms to gai
I applied via Company Website and was interviewed before Aug 2022. There were 3 interview rounds.
Technical questions related to your core field and general aptitude and some time related to lenguage
The strength of a foundation is crucial for the stability and longevity of a structure.
The strength of a foundation depends on factors such as soil type, load bearing capacity, and design.
Proper site investigation and soil testing are essential to determine the appropriate foundation type.
Common types of foundations include shallow foundations (such as spread footings) and deep foundations (such as piles or caissons).
R...
I applied via Recruitment Consulltant and was interviewed in Mar 2022. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Sales Officer
72
salaries
| ₹2.2 L/yr - ₹5.7 L/yr |
Senior Sales Officer
55
salaries
| ₹3 L/yr - ₹6.2 L/yr |
Assistant Manager
54
salaries
| ₹4.5 L/yr - ₹9 L/yr |
Assistant Engineer
39
salaries
| ₹2.4 L/yr - ₹4 L/yr |
Engineer
28
salaries
| ₹3 L/yr - ₹4.5 L/yr |
ACC
JK Cement
Ambuja Cements
The Ramco Cements