i
Ambica Steels
Filter interviews by
Procurement is the process of finding, acquiring, and buying goods, services, or works from an external source.
Involves sourcing and selecting suppliers
Negotiating contracts and prices
Managing supplier relationships
Ensuring timely delivery of goods/services
Strategic procurement focuses on long-term partnerships and value creation
Negotiation involves preparation, active listening, building relationships, and finding win-win solutions.
Prepare by researching the market, knowing your goals and limits, and understanding the other party's needs.
Listen actively to understand the other party's perspective and concerns.
Build relationships by being respectful, honest, and transparent.
Focus on finding win-win solutions that benefit both parties.
Use negot...
PR stands for Purchase Requisition and PO stands for Purchase Order.
PR (Purchase Requisition) is a document used to request goods or services from a supplier.
PO (Purchase Order) is a legally binding document issued by a buyer to a seller, outlining the details of a purchase transaction.
PR is the initial step in the procurement process, while PO is the final step that authorizes the purchase.
PR includes details such as ...
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 2 interview rounds.
I applied via Referral and was interviewed in Feb 2023. There were 4 interview rounds.
Casual and Formal Questions
Ambica Steels interview questions for popular designations
AC and DC are two types of electrical current. AC changes direction periodically while DC flows in one direction only.
AC stands for Alternating Current and DC stands for Direct Current
AC changes direction periodically while DC flows in one direction only
AC is used for power transmission over long distances while DC is used for electronic devices
AC voltage can be easily changed using a transformer while DC voltage canno...
I appeared for an interview before Mar 2024, where I was asked the following questions.
MTTR (Mean Time to Repair) and MTRF (Mean Time to Repair Failure) are key metrics in industrial maintenance and reliability.
MTTR measures the average time taken to repair a failed system or component, impacting downtime.
MTRF indicates the average time between failures, helping assess reliability and maintenance needs.
For example, a manufacturing plant with a low MTTR can quickly resume production after equipment failur...
Slip ring motors allow for variable speed and torque, while squirrel cage motors are simpler and more robust for fixed speed applications.
Slip ring induction motors have external resistors for speed control, while squirrel cage motors do not.
Slip ring motors are used in applications requiring high starting torque, like cranes and elevators.
Squirrel cage motors are more common in household appliances and fans due to the...
Power factor measures the efficiency of electrical power usage, impacting energy costs and system performance.
Power factor (PF) is the ratio of real power (kW) to apparent power (kVA) in a circuit.
A PF of 1 indicates all power is effectively used; lower PF means wasted energy.
Utilities may charge higher rates for low PF, as it requires more capacity to deliver the same real power.
For example, a factory with a PF of 0.7...
Preventive maintenance is essential to ensure equipment reliability, reduce downtime, and extend asset lifespan.
Reduces unexpected breakdowns: Regular checks can identify issues before they escalate, like replacing worn-out parts.
Increases equipment lifespan: Scheduled maintenance helps maintain optimal performance, such as lubricating machinery to prevent wear.
Enhances safety: Regular inspections can prevent accidents...
KPI (Key Performance Indicator) measures success, while KRA (Key Result Area) defines specific responsibilities for achieving goals.
KPI: Quantifiable metrics to evaluate performance, e.g., sales growth rate.
KRA: Specific areas of responsibility, e.g., customer satisfaction management.
KPIs help track progress towards goals, while KRAs outline what needs to be achieved.
Example of KPI: Number of defects in a product; Exam
Implementing safety protocols, training, and regular inspections can significantly reduce accidents in electrical workplaces.
Conduct regular safety training sessions for all employees to ensure they understand electrical hazards and safety practices.
Use personal protective equipment (PPE) such as insulated gloves, helmets, and safety goggles to protect workers from electrical shocks.
Implement lockout/tagout (LOTO) proc...
I applied via Campus Placement and was interviewed in Oct 2022. There were 3 interview rounds.
Basic Aptitude for GET's entry
I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2021. There were 5 interview rounds.
Yes, production planning software can work with MS Excel.
Production planning software can be integrated with MS Excel to create spreadsheets for tracking production schedules and inventory levels.
Excel can be used to create Gantt charts and other visual aids for production planning.
Data from production planning software can be exported to Excel for further analysis and reporting.
Examples of production planning software...
I applied via Naukri.com and was interviewed in Aug 2021. There were 5 interview rounds.
Top trending discussions
based on 16 interviews
Interview experience
based on 161 reviews
Rating in categories
Assistant Manager
24
salaries
| ₹5 L/yr - ₹9.6 L/yr |
Senior Engineer
18
salaries
| ₹4.5 L/yr - ₹7.5 L/yr |
Production Engineer
16
salaries
| ₹1.4 L/yr - ₹5.4 L/yr |
Quality Engineer
15
salaries
| ₹2.5 L/yr - ₹5.2 L/yr |
Senior Executive
15
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Hindustan Zinc
Vedanta Resources
Carborundum Universal Limited
Metso