Filter interviews by
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
I have experience with hot work permits, confined space permits, and electrical work permits.
Hot work permits are required for any work involving open flames or high temperatures.
Confined space permits are necessary for work in enclosed spaces with limited access.
Electrical work permits are needed for any work involving electrical systems or equipment.
Key responsibilities include assisting with engineering projects, conducting research, analyzing data, and providing technical support.
Assisting with engineering projects by performing tasks such as drafting plans, conducting tests, and collecting data
Conducting research to gather information on materials, technologies, and processes relevant to the project
Analyzing data collected during testing and research to draw co...
I am a recent graduate with a degree in Mechanical Engineering and a passion for problem-solving and innovation.
Recent graduate with a degree in Mechanical Engineering
Passionate about problem-solving and innovation
Strong communication and teamwork skills
Experience with CAD software such as SolidWorks
Certain topic they given
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Referral and was interviewed before Oct 2022. There were 2 interview rounds.
The minimum resistance input at Neutral+earth at telecom sites should be less than 1 ohm.
The minimum resistance input at Neutral+earth is typically required to be less than 1 ohm to ensure proper grounding and safety.
This low resistance helps to prevent electrical shocks and damage to equipment.
Regular testing and maintenance of the grounding system is important to ensure it meets safety standards.
Examples of equipment...
VRLA stands for Valve Regulated Lead Acid technology, a type of rechargeable battery commonly used in UPS systems and other applications.
VRLA batteries are maintenance-free and sealed, making them ideal for applications where regular maintenance is not feasible.
They use a gel or absorbent glass mat (AGM) to immobilize the electrolyte, preventing spills and allowing for operation in any orientation.
Common examples of VR...
To connect a 48V 300Ah battery bank to a 24V timing system, you can use a DC-DC converter or series-parallel connection.
Use a DC-DC converter to step down the voltage from 48V to 24V.
Connect the battery banks in series-parallel configuration to achieve the desired voltage and capacity.
Ensure proper wiring and safety measures are followed during the connection process.
Amara Raja Energy & Mobility interview questions for designations
I applied via Approached by Company and was interviewed in Jul 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.
PPAP is a process for ensuring quality in manufacturing. Explaining customer complaints in Telegu.
PPAP stands for Production Part Approval Process
It is a standardized process used in the automotive industry to ensure quality in manufacturing
Customer complaints can be related to issues with the product or service provided
In Telegu, customer complaint can be translated as వినియోగదారు ఫిర్యాదు
Examples of customer complain...
I applied via LinkedIn and was interviewed before Oct 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.
Top trending discussions
My strengths include leadership, problem-solving, and communication. My weaknesses are time management and public speaking.
Strengths: Leadership - I have experience leading teams and delegating tasks. Problem-solving - I am able to think critically and find solutions to complex problems. Communication - I am able to effectively communicate with team members and clients.
Weaknesses: Time management - I sometimes struggle...
Inefficiency and lack of communication irritate me the most.
Inefficiency in completing tasks
Lack of communication within the team
Not being able to meet deadlines due to lack of planning
Unnecessary delays in decision-making
Micromanagement
Lack of clarity in instructions
I assess the situation, gather information, and make a decision based on company policies and procedures.
Assess the situation and determine the severity of the issue
Gather information from all parties involved
Refer to company policies and procedures for guidance
Make a decision based on the information gathered and company guidelines
Communicate the decision to all parties involved
I am a leader who can also follow when necessary.
I believe in leading by example and inspiring others to follow.
I am comfortable taking charge and making decisions, but also value input from others.
I am adaptable and can switch between leading and following depending on the situation.
For example, in a team project, I would take the lead in organizing and delegating tasks, but also listen to and incorporate ideas from t...
Some of the top questions asked at the Amara Raja Energy & Mobility Assistant Engineer interview -
based on 10 interviews
2 Interview rounds
based on 99 reviews
Rating in categories
Assistant Engineer
310
salaries
| ₹0 L/yr - ₹0 L/yr |
Service Engineer
149
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
141
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Engineer
139
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Marketing Executive
77
salaries
| ₹0 L/yr - ₹0 L/yr |
Exide Industries
Su-Kam Power Systems
Luminous Power Technologies
Okaya Power