Filter interviews by
Be the first one to contribute and help others!
I appeared for an interview in Jun 2019.
I applied via Walk-in and was interviewed before Aug 2020. There were 3 interview rounds.
I work in the field of software engineering.
Developing and maintaining software applications
Designing and implementing software solutions
Collaborating with cross-functional teams
Troubleshooting and debugging software issues
Ensuring code quality and adherence to best practices
I applied via Naukri.com and was interviewed in Mar 2021. There were 4 interview rounds.
posted on 6 Feb 2024
I applied via Naukri.com and was interviewed in Jan 2024. There were 3 interview rounds.
Written paper as per site and codes
It’s about Quality and execution with VP and audit team
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Aug 2022. There were 4 interview rounds.
The steps in the sales process include prospecting, qualifying, presenting, handling objections, closing, and follow-up.
Prospecting: Identifying potential customers or leads.
Qualifying: Determining if the prospect is a good fit for the product or service.
Presenting: Demonstrating the features and benefits of the product or service.
Handling objections: Addressing any concerns or doubts the prospect may have.
Closing: Ask...
By highlighting the benefits, addressing concerns, providing evidence of quality, and offering incentives.
Highlight the unique benefits of the product
Address any concerns or objections the customer may have
Provide evidence of the quality and effectiveness of the product
Offer incentives such as discounts or promotions to encourage purchase
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
I applied via Job Portal
Triggers are actions that are automatically performed when a certain event occurs in a database. Async operations are tasks that run independently of the main program flow.
Triggers in databases are used to maintain data integrity and automate tasks based on specified conditions.
Async operations in programming allow tasks to be executed concurrently without blocking the main program flow.
Examples of async operations inc...
Create a trigger on an object related to Account and Contact
Use the 'trigger' keyword to start the trigger
Specify the object you want to create the trigger on (e.g. Account)
Include logic to handle the related Contact object (e.g. querying related contacts)
based on 7 reviews
Rating in categories
Quality Engineer
4
salaries
| ₹3 L/yr - ₹3.2 L/yr |
Project Engineer
3
salaries
| ₹3.6 L/yr - ₹4.2 L/yr |
Production Engineer
3
salaries
| ₹3 L/yr - ₹3.6 L/yr |
Store Executive
3
salaries
| ₹2.5 L/yr - ₹4.2 L/yr |
Signature Global
Sunteck Realty
Pittie Group
Pin Click