Filter interviews by
posted on 14 Feb 2021
PQC stands for Pavement Quality Concrete. It is a type of concrete used for road construction.
PQC is a high-quality concrete mix used for the construction of rigid pavements.
It is designed to withstand heavy traffic loads and resist wear and tear.
PQC is made with a higher cement content and a lower water-cement ratio than regular concrete.
It is also reinforced with steel bars or fibers to increase its strength and dura...
posted on 19 Jun 2022
I applied via Walk-in and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 27 Mar 2021
I applied via Campus Placement and was interviewed in Sep 2020. There were 4 interview rounds.
posted on 2 Sep 2021
I applied via Campus Placement and was interviewed before Sep 2020. There was 1 interview round.
posted on 22 Jul 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 3 interview rounds.
The question is incomplete and does not make sense.
The question is missing important information.
It is unclear what the question is asking for.
There is no context provided for the question.
Without more information, it is impossible to answer the question.
The M-5 to M-25 ratio is a measure used in civil engineering to determine the strength of concrete mixtures.
The M-5 to M-25 ratio refers to the ratio of cement, sand, and aggregate in a concrete mixture.
The ratio indicates the compressive strength of the concrete after 28 days of curing.
For example, an M-20 concrete mix has a ratio of 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate by volume.
T...
The density of cement varies depending on the type of cement and its composition.
The density of ordinary Portland cement is around 3.15 g/cm³
The density of white cement is around 2.90 g/cm³
The density of low heat cement is around 3.0 g/cm³
The density of high alumina cement is around 3.0 g/cm³
The density of rapid hardening cement is around 3.15 g/cm³
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
I applied via Company Website
I am a civil engineer with a passion for designing and constructing infrastructure projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various construction projects, including bridges, highways, and buildings.
I am skilled in using software like AutoCAD and Revit for designing structures.
I have experience in project management and ensuring projects are completed on time and with...
As a Civil Engineer, my responsibilities include designing, planning, and overseeing construction projects.
Designing and analyzing structures such as buildings, bridges, and roads
Preparing cost estimates and project schedules
Ensuring compliance with building codes and regulations
Supervising construction activities and managing contractors
Conducting site visits and inspections
Collaborating with architects, surveyors, an...
Answering questions related to project type, floor area, steel/shuttering/concrete quantity and de-shuttering periods.
Project type is commercial building with 10 floors
Floor area is 1000 sq. meters per floor
Steel quantity per floor is 50 tons, shuttering quantity is 1000 sq. meters and concrete quantity is 500 cubic meters
De-shuttering period for beams is 14 days, for columns is 21 days and for slab is 7 days
based on 1 interview
Interview experience
Store Incharge
7
salaries
| ₹1.5 L/yr - ₹12 L/yr |
Civil Supervisor
6
salaries
| ₹7.2 L/yr - ₹13.5 L/yr |
Mechanical Engineer
6
salaries
| ₹6 L/yr - ₹14.4 L/yr |
Mechanical Technician
5
salaries
| ₹0.6 L/yr - ₹6 L/yr |
Document Controller
5
salaries
| ₹2.2 L/yr - ₹8.6 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Kalpataru Projects International
Nagarjuna Construction Company