Filter interviews by
I applied via Walk-in and was interviewed in Nov 2021. There were 3 interview rounds.
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please provide more context or clarify the question.
I am unable to provide a relevant answer without understanding the question.
Could you please provide more information about what you mean by 'Porject in good pp'?
I'm sorry, but I cannot understand the question. Please provide a clear and understandable question.
Please rephrase the question or provide more context.
I am unable to provide an answer without a clear question.
Can you please clarify the question?
Top trending discussions
posted on 11 Jan 2025
RCC,DSMS, STRENGTH OF MATERIAL, SURVEYING, LEVELLING, ESTIMATION
posted on 10 Apr 2024
I applied via Newspaper Ad and was interviewed before Apr 2023. There was 1 interview round.
ABC Construction Company
ABC Construction Company specializes in civil engineering projects
The company has completed projects such as road construction, bridge building, and land development
ABC Construction Company has a strong reputation for delivering high-quality work on time and within budget
I applied via Naukri.com and was interviewed in Dec 2023. There were 4 interview rounds.
There are several types of cement used in construction.
Ordinary Portland Cement (OPC)
Portland Pozzolana Cement (PPC)
White Cement
Rapid Hardening Cement
Low Heat Cement
Sulfate Resistant Cement
Blast Furnace Slag Cement
High Alumina Cement
Oil Well Cement
The question is unclear and does not make sense.
The question seems to be incomplete or misspelled.
It is difficult to understand what is being asked.
There is no context provided for the term 'qurring'.
Good experience and good coloured
Beam bbs calculation.
posted on 26 Sep 2023
posted on 11 Jun 2023
Already talked to you
posted on 17 Aug 2023
I applied via AmbitionBox and was interviewed before Aug 2022. There were 2 interview rounds.
It is very difficult test to pass
I applied via Approached by Company
Lap length and development length for hoop, grade of concrete, and HDPE pipe are specified in code.
Lap length for hoop reinforcement is specified in IS 456:2000 and varies based on the diameter of the bar and the grade of concrete.
Development length is the length of the bar required to transfer the stress from the bar to the surrounding concrete and is also specified in IS 456:2000.
The grade of concrete determines the ...
I applied via Approached by Company and was interviewed in Mar 2022. There was 1 interview round.
posted on 3 Mar 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 3 interview rounds.
The bund height of my previous job was 3 meters.
The bund height refers to the height of an embankment or barrier constructed to contain or control the flow of liquids, such as water or chemicals.
In my previous job, I was responsible for designing and constructing a bund to contain hazardous materials.
The bund height of 3 meters was determined based on the volume and characteristics of the materials being stored.
I ensur...
Bottom width of the dam is the width of the base of the dam at its lowest point.
Bottom width is an important factor in determining the stability of the dam.
It is usually wider than the top width to provide a stable foundation.
The width varies depending on the height and type of dam.
For example, a concrete gravity dam may have a bottom width of 1/4 to 1/3 of its height.
A rockfill dam may have a bottom width of 1/2 to 2/
The procedure to start an earthen dam involves site selection, design, construction, and maintenance.
Site selection involves identifying a suitable location with adequate soil and water resources.
Design involves determining the dam's height, width, and slope, as well as spillway and outlet structures.
Construction involves excavating the foundation, building the embankment, and installing spillway and outlet structures.
...
based on 1 review
Rating in categories
BIM Modeller
5
salaries
| ₹10.6 L/yr - ₹20 L/yr |
HSE Officer
5
salaries
| ₹1.5 L/yr - ₹1.9 L/yr |
Construction Risk Coordinator
4
salaries
| ₹12 L/yr - ₹28.5 L/yr |
Plumber
4
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Store Keeper
4
salaries
| ₹2.5 L/yr - ₹2.5 L/yr |
Larsen & Toubro Limited
Tata Group
Adani Group
Reliance Industries