Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
The formula for coding North or East is based on the concept of coordinates and cardinal directions.
The formula for coding North is +1 in latitude
The formula for coding East is +1 in longitude
Coordinates are typically represented using latitude and longitude values
For example, if the current coordinates are (40.7128° N, 74.0060° W), the coded North coordinates would be (41.7128° N, 74.0060° W)
Similarly, the coded East
Top trending discussions
Reinforcement quantity for beam, slab, column, and tiles wastage calculations involve determining the amount of materials needed and accounting for potential wastage.
Calculate the required quantity of reinforcement for beams, slabs, columns, and tiles based on structural drawings and specifications.
Consider the standard lengths and sizes of reinforcement bars available in the market to minimize wastage.
Factor in the cu...
Calculation of false ceiling
Measure the length and width of the room
Determine the height of the false ceiling
Calculate the area of the room
Determine the type of false ceiling and its cost per square foot
Multiply the area of the room by the cost per square foot to get the total cost
Calculation of base unit in Quantity Surveying
Base unit is the fundamental unit of measurement for a particular item or material
It is used to calculate the cost of materials and labor for a project
Base unit can be determined by analyzing the specifications and drawings of the project
For example, the base unit for concrete may be cubic meters or cubic feet
The base unit for steel may be kilograms or pounds
I applied via Referral and was interviewed before Nov 2023. There were 2 interview rounds.
posted on 13 Jun 2022
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
I applied via Referral and was interviewed before Aug 2022. There were 2 interview rounds.
The budget of the previous project was $1.5 million.
The budget for the previous project was $1.5 million.
It was allocated for construction materials, labor costs, and equipment rental.
The budget was carefully monitored to ensure it was not exceeded.
Any deviations from the budget were documented and analyzed for future reference.
I applied via Approached by Company and was interviewed before Apr 2022. There were 3 interview rounds.
Technical Questions related to work
posted on 8 Oct 2021
I applied via Referral and was interviewed in Apr 2021. There were 3 interview rounds.
Civil Site Engineer
11
salaries
| ₹2.1 L/yr - ₹3.6 L/yr |
Junior Engineer
9
salaries
| ₹1.4 L/yr - ₹2.4 L/yr |
Executive Accountant
7
salaries
| ₹1.9 L/yr - ₹3.2 L/yr |
PRE Sales Executive
7
salaries
| ₹1.4 L/yr - ₹2.7 L/yr |
Site Engineer
6
salaries
| ₹3 L/yr - ₹3.9 L/yr |
Sobha
Prestige Group
DLF
Godrej Properties