Upload Button Icon Add office photos

Filter interviews by

Alcove Realty Engineer Interview Questions and Answers

Updated 1 Jun 2023

Alcove Realty Engineer Interview Experiences

1 interview found

Engineer Interview Questions & Answers

user image Anonymous

posted on 1 Jun 2023

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Binding wire required to bind 1MT steel if the diameter of bar ranges between 20 mm to 32 mm?
  • Ans. 

    Approximately 10 kg of binding wire is required to bind 1MT of steel bars ranging from 20 mm to 32 mm in diameter.

    • Approximately 10 kg of binding wire is needed for 1MT of steel bars with diameters between 20 mm to 32 mm.

    • The amount of binding wire required may vary slightly based on the specific dimensions and spacing of the bars.

    • It is important to ensure proper binding to maintain structural integrity and safety.

  • Answered by AI
  • Q2. Coverage of Shuttering Oil?
  • Ans. 

    Shuttering oil is used to coat formwork before pouring concrete to prevent it from sticking to the formwork.

    • Shuttering oil is applied to formwork to create a barrier between the formwork and the concrete.

    • It helps in easy removal of formwork after the concrete has set.

    • Proper coverage of shuttering oil ensures smooth and clean concrete surfaces.

    • Common types of shuttering oils include mineral oil-based, vegetable oil-base...

  • Answered by AI
  • Q3. 30 to 40 sqm/L

Interview questions from similar companies

I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. Intrudes your self.
  • Q2. Tell me about your skill

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall good, all about intrudes myself. Describe my work experience. Telling all my technical skills.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Introduction, previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Past experience and rates

Interview Preparation Tips

Interview preparation tips for other job seekers - Pressure will be more, since i worked in engineering team compare to others contracts department will be feeling the pressure more

I applied via Walk-in and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Related to building &infrastructure execution

Interview Preparation Tips

Interview preparation tips for other job seekers - Detail execution process, billing related issue, contractor issue, material problem, hr related queries, technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Previous roles and responsibilities, reason for leaving the previous job
  • Q2. What are the activities, you have handled
Round 2 - Technical 

(3 Questions)

  • Q1. Discussing the overall experience technically
  • Q2. Various activities, about steel, manpower management, procurement
  • Q3. Cranes, concrete pumps, RMC, vendor management, followup with different consultant and dept, coordination and correspondence.
Round 3 - Technical 

(2 Questions)

  • Q1. This was also technical round, Challanges faced on last project
  • Q2. Project details of all executed projects
Round 4 - HR 

(1 Question)

  • Q1. Why do you want to change, expectations and the type of project you have done so far, & final negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about you previous experience, the roles and responsibilities. And technically sound.
Be confident
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.

Round 1 - One-on-one 

(6 Questions)

  • Q1. Use of shunt relay in acb.
  • Ans. 

    A shunt relay in an ACB is used to provide protection against overcurrents by diverting excess current away from the main circuit.

    • Shunt relay is connected in parallel with the main circuit of the ACB.

    • It detects overcurrents and activates to divert the excess current through a shunt path.

    • This helps in protecting the main circuit from damage due to overcurrents.

    • Shunt relays are commonly used in Air Circuit Breakers (ACBs...

  • Answered by AI
  • Q2. What is coc in hvac.
  • Ans. 

    CoC in HVAC stands for Certificate of Conformance, which is a document certifying that a product meets specified requirements.

    • CoC in HVAC is a Certificate of Conformance that ensures a product meets specific requirements.

    • It is often required in HVAC projects to ensure quality and compliance.

    • CoC may include details such as product specifications, testing results, and manufacturer information.

  • Answered by AI
  • Q3. What is Biological oxygen demand and Carbonic oxygen demand in STP Plant.
  • Ans. 

    Biological oxygen demand (BOD) and Chemical oxygen demand (COD) are important parameters in wastewater treatment plants.

    • Biological oxygen demand (BOD) is a measure of the amount of dissolved oxygen needed by aerobic biological organisms to break down organic material in water.

    • Carbonaceous oxygen demand (COD) is a measure of the amount of oxygen required to oxidize all the organic and inorganic matter in water.

    • BOD is a ...

  • Answered by AI
  • Q4. What is voltage monitoring relay.
  • Ans. 

    A voltage monitoring relay is a device that monitors voltage levels and triggers an alarm or protective action if the voltage exceeds or falls below a set threshold.

    • Monitors voltage levels in electrical systems

    • Triggers alarm or protective action if voltage exceeds or falls below set threshold

    • Used to protect equipment from damage due to voltage fluctuations

  • Answered by AI
  • Q5. Working principle of wtp plant.
  • Ans. 

    WTP plant works on the principle of physical and chemical processes to remove impurities from water.

    • Water enters the plant and goes through processes like coagulation, flocculation, sedimentation, filtration, and disinfection.

    • Coagulation involves adding chemicals to water to make impurities clump together.

    • Flocculation helps in forming larger particles called floc for easier removal.

    • Sedimentation allows the floc to sett...

  • Answered by AI
  • Q6. What is your daily and monthly Reports.
  • Ans. 

    I provide daily and monthly reports on project progress, issues, and key metrics to track performance.

    • Daily reports include updates on tasks completed, challenges faced, and plans for the next day.

    • Monthly reports summarize overall progress, budget status, and any potential risks or delays.

    • Reports may also include key performance indicators (KPIs) such as project milestones achieved, budget variance, and resource utiliz...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - keep mind relax interview time. And focus your daily work activities .
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. What is tiling process
  • Q2. As per work poliy and methods telling all the process

I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Single Line Diagram of STP, it's operation and it's working
  • Ans. 

    STP is a wastewater treatment plant that uses physical, chemical, and biological processes to remove pollutants from sewage.

    • STP receives sewage from households and industries through a network of underground pipes.

    • The sewage is screened to remove large objects and then sent to a grit chamber to remove sand and grit.

    • The sewage is then sent to a primary clarifier where solids settle to the bottom and are removed as sludg...

  • Answered by AI
  • Q2. Transformer working and it's safety
  • Ans. 

    Transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.

    • Transformers work on the principle of electromagnetic induction.

    • They consist of two or more coils of wire called windings.

    • The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.

    • When an alternating current flows through the primary...

  • Answered by AI
  • Q3. DG sets safety and it's operation
  • Ans. 

    DG sets safety and operation are crucial for uninterrupted power supply.

    • DG sets should be installed in a well-ventilated area to avoid carbon monoxide poisoning.

    • Regular maintenance and testing of DG sets are necessary to ensure their safe operation.

    • Proper grounding and earthing of DG sets are essential to prevent electrical hazards.

    • Emergency stop buttons and alarms should be installed to shut down the DG sets in case o...

  • Answered by AI
  • Q4. Soft skills, making PPT, DMR, MMR
  • Q5. Load Management & balancing

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm, listen carefully and give point to point answers
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. LT Side Equipments
Round 3 - HR 

(1 Question)

  • Q1. Introduction & Salary

Interview Questionnaire 

1 Question

  • Q1. About my previous organization and working areas

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview will be held in site only , if you have working experience it is very easy to creak interview . Ensure only inside lot of politics are there.

Alcove Realty Interview FAQs

How many rounds are there in Alcove Realty Engineer interview?
Alcove Realty interview process usually has 2 rounds. The most common rounds in the Alcove Realty interview process are Resume Shortlist and Technical.
What are the top questions asked in Alcove Realty Engineer interview?

Some of the top questions asked at the Alcove Realty Engineer interview -

  1. Binding wire required to bind 1MT steel if the diameter of bar ranges between 2...read more
  2. Coverage of Shuttering O...read more
  3. 30 to 40 sq...read more

Tell us how to improve this page.

Alcove Realty Engineer Interview Process

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 363 Interviews
CBRE Interview Questions
4.2
 • 270 Interviews
NoBroker Interview Questions
3.2
 • 235 Interviews
Lodha Group Interview Questions
4.0
 • 129 Interviews
Colliers India Interview Questions
3.9
 • 70 Interviews
InvestoXpert Interview Questions
4.2
 • 63 Interviews
Casagrand Interview Questions
3.8
 • 58 Interviews
View all

Alcove Realty Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

3.0

Skill development

2.0

Work-life balance

3.0

Salary

1.0

Job security

2.0

Company culture

1.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
10 salaries
unlock blur

₹2.1 L/yr - ₹3.6 L/yr

Junior Engineer
10 salaries
unlock blur

₹1.4 L/yr - ₹2.4 L/yr

Executive Accountant
7 salaries
unlock blur

₹1.9 L/yr - ₹3.7 L/yr

Process Coordinator
7 salaries
unlock blur

₹1.9 L/yr - ₹2.5 L/yr

PRE Sales Executive
7 salaries
unlock blur

₹1.4 L/yr - ₹2.7 L/yr

Explore more salaries
Compare Alcove Realty with

JLL

4.1
Compare

CBRE

4.2
Compare

NoBroker

3.2
Compare

Lodha Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview