Upload Button Icon Add office photos

Filter interviews by

Agriya Construction Civil Site Engineer Interview Questions, Process, and Tips

Updated 27 Feb 2022

Agriya Construction Civil Site Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Walk 

(4 Questions)

  • Q1. How many cum in 1 brass
  • Ans. 

    1 brass is equal to 100 cubic meters (cum).

    • 1 brass = 100 cubic meters (cum)

    • Brass is a unit of volume commonly used in construction and civil engineering.

    • It is often used to measure the quantity of materials like sand, aggregate, or concrete.

    • For example, if you have 1 brass of sand, it means you have 100 cubic meters of sand.

  • Answered by AI
  • Q2. How to check plaster quality
  • Ans. 

    To check plaster quality, inspect for uniformity, adhesion, smoothness, and absence of cracks or hollow sounds.

    • Inspect the plaster surface for uniformity in color, texture, and thickness.

    • Check for proper adhesion of plaster to the substrate by tapping on it gently. It should not sound hollow.

    • Ensure the plaster surface is smooth and free from any bumps, lumps, or unevenness.

    • Look for cracks or fissures in the plaster, es...

  • Answered by AI
  • Q3. How do reduction in column
  • Ans. 

    Reduction in column size can be achieved by reducing the load on the column or by increasing the strength of the column material.

    • Reducing the load on the column can be done by redistributing the load to other columns or by reducing the weight of the structure.

    • Increasing the strength of the column material can be done by using a higher grade of concrete or steel.

    • It is important to ensure that the reduction in column siz...

  • Answered by AI
  • Q4. Lapping for column beam
  • Ans. 

    Lapping is a method of overlapping two reinforcement bars to create a continuous connection.

    • Lapping is used to increase the strength and stability of a structure.

    • The length of the lap depends on the diameter of the bars and the load they will bear.

    • Lapping should be done at a point where the bending moment is minimum.

    • The lap length should be at least equal to the diameter of the bar.

    • Lapping should be done in accordance ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Agriya Construction Civil Site Engineer interview:
  • Unit conversation
Interview preparation tips for other job seekers - I gave walk in interview directly on site with company MD sir and selected for job

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - HR 

(3 Questions)

  • Q1. Have you maintained standard quality in your previous company?
  • Q2. Do you use drawing and technology in your work?
  • Q3. Are you doing to maintain time in your life
Round 2 - Aptitude Test 

Calculator for material quantity on site material

Round 3 - HR 

(2 Questions)

  • Q1. How do you calculate the quantity of a specific item or material?
  • Q2. What methods do you use to verify information?

Interview Preparation Tips

Interview preparation tips for other job seekers - Thank you for providing me with this opportunity.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How many types of the grades of concrete
  • Ans. 

    There are different grades of concrete used in construction based on strength and durability requirements.

    • Concrete grades are classified based on their compressive strength, such as M20, M30, etc.

    • The 'M' stands for mix design, followed by the compressive strength in N/mm^2.

    • Higher grade concrete is used for structures requiring higher strength, such as bridges and high-rise buildings.

    • Lower grade concrete is used for non...

  • Answered by AI
  • Q2. What is honeycomb
  • Ans. 

    Honeycomb is a structure made up of hexagonal cells, similar to those found in beehives.

    • Honeycomb structures are commonly used in engineering for their strength and light weight.

    • The hexagonal shape of honeycomb cells allows for efficient use of material.

    • Examples of honeycomb structures include honeycomb core panels used in aerospace industry and honeycomb grids used in civil engineering for soil stabilization.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Civil Site Engineer interview:
  • Building materials
Interview preparation tips for other job seekers - I want to work and gain skills from construction field.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is the overlap
  • Ans. 

    Overlap refers to the area where two or more elements share common space or features.

    • Overlap occurs when two or more elements occupy the same physical space or have common characteristics.

    • In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.

    • Overlap can also occur in surveying when two survey lines intersect or overlap each other.

    • Prop...

  • Answered by AI
  • Q2. Why do you overlap
  • Ans. 

    Overlapping in civil engineering is done to ensure proper continuity and strength in construction.

    • Overlapping is done to ensure continuity of reinforcement bars in concrete structures.

    • It helps in distributing the load evenly and prevents sudden failure.

    • Overlapping also helps in providing the required strength to the structure.

    • Proper overlapping ensures that the structure can withstand various stresses and forces.

    • For ex...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. The in - person interviews usually begin with a one on one interview with the hiring manager
  • Ans. Early interviews are typically one on one in person interviews between the application and the hiring manager.
  • Answered Anonymously
  • Q2. Introduce yourself.
  • Ans. 

    I am a Civil Site Engineer with experience in managing construction projects and ensuring their successful completion.

    • I have a Bachelor's degree in Civil Engineering from XYZ University.

    • I have worked on various construction projects, including residential and commercial buildings.

    • I am proficient in using AutoCAD and other design software.

    • I have strong project management skills and can effectively coordinate with contra...

  • Answered by AI
  • Q3. Helps to make the candidate friendly with the environment.
  • Q4. What is safety equipment .use for site.
  • Ans. 

    Safety equipment is used on construction sites to protect workers from potential hazards and accidents.

    • Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves

    • Safety harnesses and fall protection systems for working at heights

    • Earplugs or earmuffs to protect against loud noises

    • Respirators or masks for protection against dust, fumes, or hazardous substances

    • Safety signs and barricades to warn and ...

  • Answered by AI
  • Q5. What are the standards used for plant layout in reference.
  • Ans. 

    Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.

    • OSHA regulations set guidelines for safety in plant layout design

    • Industry best practices ensure efficient use of space and resources

    • Client requirements may include specific equipment placement or workflow needs

  • Answered by AI
  • Q6. What we do for shortage of material received.
  • Ans. 

    In case of shortage of material received, we can take the following actions:

    • Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.

    • Check if there are any alternative suppliers who can provide the required material.

    • Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.

    • Prioritize the use of available material for cri...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Highlight your relevant experience and skills that match the job description.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the nominal brick size?
  • Ans. 

    The nominal brick size is typically 90 mm x 90 mm x 90 mm.

    • Nominal brick size is commonly 90 mm x 90 mm x 90 mm.

    • It may vary slightly depending on the country or region.

    • Brick sizes are standardized for construction purposes.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. I B. Tech degree I tunnel work for 4 years work experience I hard work of duty
  • Q2. I waiting for megha engineering and infrastructure
  • Q3. I will b resume send megha engineering and infrastructure and response me
  • Q4. I waiting megha engineering and infrastructure

Interview Preparation Tips

Topics to prepare for Afcons Infrastructure Civil Site Engineer interview:
  • 4 years
Interview preparation tips for other job seekers - I am interested job civil site engineer
Tunnel work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Online exam 50 marks in VC.

Round 3 - HR 

(2 Questions)

  • Q1. Current job responsibilities, CTC.
  • Q2. Methodology about Finishing work like Tiles work, Paint, False ceiling.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge about your branches.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Sir B.E civil engineer hai Mere job nhi laga DBL company me training deye RE Wall Four lanning of mangalwedh_Solapur section of NH_166 Pkg in the state of Maharashtra
  • Q2. Mere DBL company me job nhi laga

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindi
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Assignment 

Related to auto level and total station one more thing buliding material

Round 2 - HR 

(1 Question)

  • Q1. About the site work

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • For leveling

Agriya Construction Interview FAQs

How many rounds are there in Agriya Construction Civil Site Engineer interview?
Agriya Construction interview process usually has 2 rounds. The most common rounds in the Agriya Construction interview process are Resume Shortlist.
What are the top questions asked in Agriya Construction Civil Site Engineer interview?

Some of the top questions asked at the Agriya Construction Civil Site Engineer interview -

  1. How many cum in 1 br...read more
  2. How to check plaster qual...read more
  3. How do reduction in col...read more

Tell us how to improve this page.

Site Engineer
4 salaries
unlock blur

₹2.7 L/yr - ₹3.6 L/yr

Billing Engineer
4 salaries
unlock blur

₹4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Agriya Construction with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview