Filter interviews by
I applied via Walk-in and was interviewed in Jul 2021. There was 1 interview round.
The question is incomplete or missing.
Please provide the complete question for a proper answer.
Molded products are items created by shaping a material into a specific form using a mold.
Molded products are made by pouring or injecting a material into a mold and allowing it to solidify or cure.
The mold determines the shape and size of the final product.
Common examples of molded products include plastic containers, automotive parts, and rubber seals.
Molded products are often used in manufacturing industries for the...
I applied via Campus Placement and was interviewed before Dec 2020. There were 4 interview rounds.
There are seven types of plastics, each with unique properties and uses.
There are seven types of plastics identified by the resin identification code (RIC) system.
The seven types are: PET, HDPE, PVC, LDPE, PP, PS, and OTHER.
Each type has unique properties and uses, such as PET being used for water bottles and HDPE for milk jugs.
The OTHER category includes plastics such as polycarbonate and polylactic acid (PLA).
Density and melting point vary for different engineering plastic materials such as ABS, PP, PC, and Nylon.
Density of ABS ranges from 1.03 to 1.21 g/cm³ and its melting point is around 105°C.
PP has a density of 0.90 to 0.91 g/cm³ and its melting point is around 160°C.
PC has a density of 1.20 to 1.22 g/cm³ and its melting point is around 300°C.
Nylon has a density of 1.12 to 1.15 g/cm³ and its melting point is around 220°
Ag Industries interview questions for popular designations
Get interview-ready with Top Ag Industries Interview Questions
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
posted on 1 Apr 2021
Prognostic is a predictive maintenance technique used in Industry 4.0 manufacturing.
Prognostic uses data analysis and machine learning to predict when maintenance is needed.
It helps prevent unexpected downtime and reduces maintenance costs.
Examples of prognostic techniques include vibration analysis and oil analysis.
Prognostic is a key component of smart manufacturing and Industry 4.0.
I applied via Recruitment Consultant and was interviewed before Sep 2020. There were 4 interview rounds.
Quality is the degree of excellence of a product or service that meets or exceeds customer expectations.
Quality is meeting or exceeding customer expectations
It is the degree of excellence of a product or service
It involves meeting the required specifications and standards
It is achieved through continuous improvement and adherence to processes
Examples of quality include durability, reliability, and customer satisfaction
Time is a concept that measures the duration between events or moments.
Time is a continuous and irreversible flow of events.
It can be measured in seconds, minutes, hours, days, weeks, months, and years.
Time is relative and can be perceived differently by different people.
It is an essential factor in scheduling, planning, and organizing.
Examples of time-related measurements include clock time, calendar time, and elapsed
I applied via Recruitment Consultant and was interviewed before Dec 2018. There were 3 interview rounds.
PPAP submission is the final phase of APQP.
PPAP submission is the final step in the APQP process.
It involves submitting a Production Part Approval Process (PPAP) to the customer.
PPAP includes documentation and samples that demonstrate the product meets customer requirements.
PPAP submission is necessary before production can begin.
PPAP submission is a critical step in ensuring product quality and customer satisfaction.
APQP consists of five phases, with PPAP being submitted in the fourth phase.
APQP stands for Advanced Product Quality Planning.
The five phases of APQP are: Planning and Program Definition, Product Design and Development, Process Design and Development, Product and Process Validation, and Launch, Feedback, Assessment, and Corrective Action.
PPAP stands for Production Part Approval Process.
PPAP is submitted in the fourth p...
To make a PPT, use a software like PowerPoint or Google Slides and follow a structure with clear and concise content.
Choose a template or create your own design
Add relevant and visually appealing images
Use bullet points and short sentences
Practice your presentation before presenting
Include a conclusion and call to action
Process audit involves reviewing and evaluating a company's procedures and policies to ensure they are effective and efficient.
Identify the process to be audited
Define the audit objectives and scope
Select the audit team and assign roles
Gather and analyze data
Identify areas for improvement
Develop and implement corrective actions
Monitor and follow up on corrective actions
Document the audit findings and recommendations
When a customer complaint arises, I listen attentively, empathize with their concerns, investigate the issue, propose a solution, and follow up to ensure satisfaction.
Listen attentively to the customer's complaint
Empathize with their concerns and show understanding
Investigate the issue by gathering relevant information
Propose a solution or offer alternatives to address the complaint
Follow up with the customer to ensure
Can you please clarify the question?
I'm sorry, I don't understand what you're asking.
Could you please rephrase the question?
I need more information to answer that question.
Gauges and fixtures should be developed during the design phase of NPD to ensure quality and efficiency.
Identify critical dimensions and tolerances early on
Develop gauges and fixtures to measure and verify these dimensions
Test and refine gauges and fixtures throughout the design process
Ensure gauges and fixtures are compatible with manufacturing processes
Finalize gauges and fixtures before production begins
Top trending discussions
The duration of Ag Industries interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 46 interviews
Interview experience
based on 581 reviews
Rating in categories
Assistant Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
206
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
148
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
100
salaries
| ₹0 L/yr - ₹0 L/yr |
ZF Steering Gear
Toyoda Gosei Minda
Global Autotech
Mikuni