Filter interviews by
I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Oct 2020. There was 1 interview round.
To control shop floor workmen absenteeism, implement a combination of preventive measures, effective communication, and fair policies.
Implement a comprehensive attendance tracking system
Establish clear attendance policies and communicate them to all employees
Encourage a positive work environment and foster employee engagement
Provide incentives for good attendance and recognize employees with low absenteeism
Address unde...
I applied via Naukri.com and was interviewed before May 2021. There were 2 interview rounds.
I come from a close-knit family of five, including my parents, my older sister, and my younger brother.
My parents have always been supportive of my career choices.
My sister is a doctor and my brother is studying engineering.
We enjoy spending quality time together on weekends, whether it's going for a hike or watching movies at home.
5S is a methodology for organizing a workplace, especially a shared workplace, to improve efficiency and effectiveness by eliminating waste.
Sort - separate needed tools, parts, and instructions from unneeded materials
Set in order - neatly arrange and identify parts and tools for ease of use
Shine - clean and inspect work area and equipment regularly
Standardize - establish schedules and methods for maintaining the workpl...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM involves all employees in the maintenance process
Focuses on preventing breakdowns and improving overall equipment efficiency
Includes activities such as cleaning, inspection, lubrication, and training of operators
Example: Implementing TPM can lead to reduced downtime and increased productivi
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
MHR is the rate calculated by dividing the total overhead costs by the total machine hours. Costing norms refer to the standard costs set for different activities.
MHR is calculated as Total Overhead Costs / Total Machine Hours
Costing norms are predetermined standards for costs of different activities
MHR helps in determining the cost of using machines for production
Costing norms help in setting benchmarks for cost contr
Major defects in plastic parts and their countermeasures
Major defects in plastic parts include warping, sink marks, flash, and short shots
Countermeasures for warping include adjusting mold temperature and cooling time
Sink marks can be reduced by increasing injection pressure and temperature
Flash can be prevented by optimizing clamping force and using proper mold design
Short shots can be avoided by ensuring proper mater
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 3 interview rounds.
Costing of sheet metal and aluminium involves various factors such as material cost, labor cost, tooling cost, and overhead cost.
Material cost is the cost of raw material used in manufacturing the product.
Labor cost includes the cost of wages, benefits, and other expenses related to the workforce.
Tooling cost includes the cost of tools and equipment used in the manufacturing process.
Overhead cost includes the cost of u...
posted on 5 Sep 2021
I applied via Recruitment Consultant and was interviewed in Aug 2021. There were 4 interview rounds.
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Assistant Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
206
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
148
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
102
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
100
salaries
| ₹0 L/yr - ₹0 L/yr |
ZF Steering Gear
Toyoda Gosei Minda
Global Autotech
Mikuni