Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Afcons Infrastructure Team. If you also belong to the team, you can get access from here

Afcons Infrastructure Verified Tick

Compare button icon Compare button icon Compare
4.3

based on 2.4k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Afcons Infrastructure Senior Surveyor Interview Questions and Answers

Updated 31 Mar 2021

Afcons Infrastructure Senior Surveyor Interview Experiences

1 interview found

Senior Surveyor Interview Questions & Answers

user image Dharmendra Singh

posted on 31 Mar 2021

Interview Questionnaire 

2 Questions

  • Q1. Total station and auto CAD drawings and auto level and layout marking
  • Ans. 

    Sr, surveyor 7 years experience total sataioun and Auto CAD drawings and Auto level cheking paidistail layout

  • Answered Anonymously
  • Q2. Survey work all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.

Round 1 - Aptitude Test 

Alphabet, numerical, numbers,Genral awareness,etc

Round 2 - Aptitude Test 

Alphabet,time,calender,train,etc

Round 3 - Coding Test 

Missing alphabet, missing number,

Interview Preparation Tips

Interview preparation tips for other job seekers - Very nice
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is auto level mechine?
  • Ans. 

    An auto level machine is a surveying instrument used to measure height differences and level surfaces.

    • Auto level machines use a compensator to ensure accurate readings.

    • They are commonly used in construction, land surveying, and civil engineering.

    • Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.

  • Answered by AI
Round 3 - Technical 

(4 Questions)

  • Q1. What is the difference of true north and magnetic north ?
  • Ans. 

    True north is the direction towards the geographic North Pole, while magnetic north is the direction towards the north magnetic pole.

    • True north is fixed and does not change over time, while magnetic north constantly shifts due to changes in the Earth's magnetic field.

    • True north is used for navigation on maps and charts, while magnetic north is used by compasses.

    • The angle between true north and magnetic north is called ...

  • Answered by AI
  • Q2. Who is the first surveyor in India ?
  • Ans. 

    The first surveyor in India is George Everest, who served as the Surveyor General of India from 1830 to 1843.

    • George Everest was appointed as the Surveyor General of India in 1830.

    • He is known for his work in mapping the Indian subcontinent, including the measurement of the height of Mount Everest which was later named after him.

    • Everest's tenure as Surveyor General of India laid the foundation for modern mapping and surv

  • Answered by AI
  • Q3. Who make total station ?
  • Q4. What is your survey job ?

Interview Preparation Tips

Interview preparation tips for other job seekers - No tips.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Dear sir multiple question send civil engineering paper
  • Q2. Structure related
  • Q3. Survey related design
  • Q4. Land Surveyor related
  • Q5. Autocad related

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Telephonic interview by HR
  • Q2. Where are you from how much experience ?
  • Ans. 

    I am from New York and I have 10 years of experience as a Senior Surveyor.

    • I am originally from New York.

    • I have 10 years of experience as a Senior Surveyor.

    • I have worked on various projects across the state.

    • I am familiar with the local regulations and requirements.

    • I have successfully completed complex surveys in urban and rural areas.

  • Answered by AI
  • Q3. I'm from Jharkhand and experience was 7 years

Interview Preparation Tips

Topics to prepare for Simplex Infrastructures Senior Surveyor interview:
  • travesing
Interview preparation tips for other job seekers - Experience teach better join work and enjoy work for internship
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Reasons for changing companies
  • Q2. Do you know AutoCAD?
  • Ans. 

    Yes, I am proficient in AutoCAD and have used it extensively in my previous roles.

    • Proficient in using AutoCAD for creating detailed drawings and plans

    • Experience in 2D and 3D modeling with AutoCAD

    • Familiar with AutoCAD commands and tools

    • Used AutoCAD for site surveys and measurements

    • Ability to troubleshoot and resolve issues in AutoCAD

  • Answered by AI
  • Q3. What work did you have to do in the previous company?
Round 3 - HR 

(1 Question)

  • Q1. What work did you do in the metro project?

Interview Preparation Tips

Interview preparation tips for other job seekers - I think it is better not to come directly. References give more importance
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Total station error distribution in GPS to GPS
  • Ans. 

    Total station errors can affect GPS to GPS measurements due to various factors.

    • Total station errors can include instrument calibration errors, atmospheric conditions, and human error.

    • Examples of total station errors affecting GPS to GPS measurements include incorrect leveling of the total station, improper target placement, and misalignment of the instrument.

    • Regular calibration and maintenance of the total station can

  • Answered by AI
  • Q2. Coordinates kaise nikalte hai CAD se
  • Q3. Auto level arre distribution
Round 3 - HR 

(2 Questions)

  • Q1. Selery discussion
  • Q2. Which company working

Interview Preparation Tips

Interview preparation tips for other job seekers - Best company working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. How much experience you have
  • Ans. 

    I have 8 years of experience working as a Land Surveyor.

    • 8 years of experience in land surveying

    • Proficient in using surveying equipment and software

    • Experience in conducting boundary surveys, topographic surveys, and construction staking

    • Familiar with relevant laws and regulations in land surveying

  • Answered by AI
  • Q2. What is your role
  • Ans. 

    As a Land Surveyor, my role is to accurately measure and map the land, including boundaries, topography, and features for construction or development projects.

    • Accurately measure and map land boundaries

    • Analyze topography and features of the land

    • Provide data for construction or development projects

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience, current salary, expected salary and notice period
Round 2 - Technical 

(1 Question)

  • Q1. About technical knowledge of current designation
Round 3 - One-on-one 

(1 Question)

  • Q1. About technical knowledge currently project

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't go with extraordinary, reply to interviewer what you actually know
Interview experience
4
Good
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. How many years of experience do you have as a Quantity Surveyor?
  • Q2. What is the Current CTC & Expected CTC?
  • Ans. 

    Current CTC is $60,000 and Expected CTC is $70,000.

    • Current CTC is the current annual salary of the candidate.

    • Expected CTC is the annual salary the candidate is expecting from the new job.

    • It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.

    • For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.

  • Answered by AI
  • Q3. How much is the notice period in present company?
  • Q4. What is your family background?
  • Q5. Why you are planning to relocate?
  • Q6. Did you apply for any job previously with Aarvee Associates?
Round 3 - Technical 

(6 Questions)

  • Q1. Brief about yourself?
  • Q2. Do you involve in doing Cost Estimations and what type of Estimates you prepared?
  • Ans. 

    Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.

    • I prepare detailed estimates based on quantities of materials and labor required for a project.

    • I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.

    • I use software tools...

  • Answered by AI
  • Q3. How do you verify the bill which is submitted by the Contractor/Concessionaire?
  • Ans. 

    Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.

    • Check quantities mentioned in the bill against the actual work done on site.

    • Verify rates and unit prices for each item in the bill with the contract agreement.

    • Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.

    • Conduct site measurements to confirm the work completed matches the

  • Answered by AI
  • Q4. What are the evidential documents required to scrutiny the RA Bill?
  • Ans. 

    Evidential documents required for scrutinizing the RA Bill

    • Contract documents

    • Measurement sheets

    • Bills of quantities

    • Variation orders

    • Payment certificates

  • Answered by AI
  • Q5. How do you justify the change of scope works which are to be recommended to the authority?
  • Ans. 

    Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.

    • Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.

    • Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...

  • Answered by AI
  • Q6. What are the basic inputs for preparing the Bill of Quantities?
  • Ans. 

    Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.

    • Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.

    • Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.

    • Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Aarvee Associates Quantity Surveyor interview:
  • Bill of Quantities
  • Schedules in Contract Agreement
  • Rate Analysis methods
  • Bill Procedures
Interview preparation tips for other job seekers - Required minimum 5 years of experience as a Quantity Surveyor in a relevant field, then you will easily crack the interview.

Afcons Infrastructure Interview FAQs

What are the top questions asked in Afcons Infrastructure Senior Surveyor interview?

Some of the top questions asked at the Afcons Infrastructure Senior Surveyor interview -

  1. Total station and auto CAD drawings and auto level and layout mark...read more
  2. Survey work a...read more

Tell us how to improve this page.

Afcons Infrastructure Senior Surveyor Salary
based on 9 salaries
₹7.5 L/yr - ₹12.8 L/yr
63% more than the average Senior Surveyor Salary in India
View more details

Afcons Infrastructure Senior Surveyor Reviews and Ratings

based on 2 reviews

5.0/5

Rating in categories

5.0

Skill development

4.8

Work-life balance

4.8

Salary

4.8

Job security

4.8

Company culture

4.8

Promotions

1.3

Work satisfaction

Explore 2 Reviews and Ratings
Senior Engineer
487 salaries
unlock blur

₹5 L/yr - ₹19 L/yr

Planning Engineer
198 salaries
unlock blur

₹4.5 L/yr - ₹12 L/yr

Civil Engineer
182 salaries
unlock blur

₹2 L/yr - ₹10 L/yr

Executive Engineer
167 salaries
unlock blur

₹3.2 L/yr - ₹12 L/yr

Engineer
163 salaries
unlock blur

₹3.5 L/yr - ₹10.1 L/yr

Explore more salaries
Compare Afcons Infrastructure with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview