i
Afcons Infrastructure
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
Sr, surveyor 7 years experience total sataioun and Auto CAD drawings and Auto level cheking paidistail layout
I applied via Referral and was interviewed in Apr 2024. There were 3 interview rounds.
Alphabet, numerical, numbers,Genral awareness,etc
Alphabet,time,calender,train,etc
Missing alphabet, missing number,
posted on 3 Aug 2023
I applied via Company Website and was interviewed in Jul 2023. There were 3 interview rounds.
An auto level machine is a surveying instrument used to measure height differences and level surfaces.
Auto level machines use a compensator to ensure accurate readings.
They are commonly used in construction, land surveying, and civil engineering.
Examples of auto level machines include Leica NA700 Series and Topcon AT-B Series.
True north is the direction towards the geographic North Pole, while magnetic north is the direction towards the north magnetic pole.
True north is fixed and does not change over time, while magnetic north constantly shifts due to changes in the Earth's magnetic field.
True north is used for navigation on maps and charts, while magnetic north is used by compasses.
The angle between true north and magnetic north is called ...
The first surveyor in India is George Everest, who served as the Surveyor General of India from 1830 to 1843.
George Everest was appointed as the Surveyor General of India in 1830.
He is known for his work in mapping the Indian subcontinent, including the measurement of the height of Mount Everest which was later named after him.
Everest's tenure as Surveyor General of India laid the foundation for modern mapping and surv
posted on 27 Oct 2022
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
I am from New York and I have 10 years of experience as a Senior Surveyor.
I am originally from New York.
I have 10 years of experience as a Senior Surveyor.
I have worked on various projects across the state.
I am familiar with the local regulations and requirements.
I have successfully completed complex surveys in urban and rural areas.
posted on 8 Aug 2023
I applied via Approached by Company and was interviewed before Aug 2022. There were 3 interview rounds.
Yes, I am proficient in AutoCAD and have used it extensively in my previous roles.
Proficient in using AutoCAD for creating detailed drawings and plans
Experience in 2D and 3D modeling with AutoCAD
Familiar with AutoCAD commands and tools
Used AutoCAD for site surveys and measurements
Ability to troubleshoot and resolve issues in AutoCAD
posted on 25 Apr 2023
I applied via Approached by Company and was interviewed before Apr 2022. There were 5 interview rounds.
It was around 5-10 minutes online test.
The percentage of wastage varies depending on the project and materials used.
The percentage of wastage can be calculated by dividing the amount of material wasted by the total amount of material used and multiplying by 100.
Factors that can contribute to wastage include poor planning, inaccurate measurements, and human error.
The percentage of wastage can be reduced through careful planning, accurate measurements, and pr...
I applied via Referral and was interviewed before Oct 2022. There were 3 interview rounds.
Current CTC is $60,000 and Expected CTC is $70,000.
Current CTC is the current annual salary of the candidate.
Expected CTC is the annual salary the candidate is expecting from the new job.
It is important for the employer to know the candidate's salary expectations to assess if it aligns with the budget.
For example, if the candidate's Current CTC is $50,000 and Expected CTC is $65,000, there is a $15,000 difference.
Yes, I am actively involved in preparing cost estimations for construction projects. I typically prepare detailed estimates based on quantities, labor rates, material costs, and overhead expenses.
I prepare detailed estimates based on quantities of materials and labor required for a project.
I consider factors such as material costs, labor rates, equipment costs, and overhead expenses in my estimates.
I use software tools...
Verify the bill by checking quantities, rates, unit prices, supporting documents, and site measurements.
Check quantities mentioned in the bill against the actual work done on site.
Verify rates and unit prices for each item in the bill with the contract agreement.
Ensure all supporting documents such as invoices, receipts, and delivery notes are provided.
Conduct site measurements to confirm the work completed matches the
Evidential documents required for scrutinizing the RA Bill
Contract documents
Measurement sheets
Bills of quantities
Variation orders
Payment certificates
Justification of change of scope works involves thorough analysis, cost estimation, impact assessment, and communication with stakeholders.
Conduct a detailed analysis of the proposed changes in scope, including the reasons for the change and the potential impact on the project.
Estimate the additional costs and resources required for the change of scope works, taking into account materials, labor, and any other relevant...
Basic inputs for preparing the Bill of Quantities include drawings, specifications, and site visits.
Drawings: Architectural, structural, and MEP drawings are essential for accurately quantifying materials and labor.
Specifications: Detailed project specifications outline the quality and standards required for each item in the bill.
Site visits: Surveyors need to visit the site to assess existing conditions, access, and a...
I applied via LinkedIn and was interviewed in Aug 2021. There was 1 interview round.
posted on 25 Mar 2021
based on 2 reviews
Rating in categories
Senior Engineer
487
salaries
| ₹5 L/yr - ₹19 L/yr |
Planning Engineer
198
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Civil Engineer
182
salaries
| ₹2 L/yr - ₹10 L/yr |
Executive Engineer
167
salaries
| ₹3.2 L/yr - ₹12 L/yr |
Engineer
163
salaries
| ₹3.5 L/yr - ₹10.1 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA