I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
A cross section drawing of a station box shows a vertical slice of the box, displaying its internal structure and dimensions.
It is a 2D drawing that shows a vertical slice of the station box.
It displays the internal structure and dimensions of the box.
It is used to plan and design the construction of the station box.
It is typically drawn to scale and includes labels and annotations.
It is an important tool for engineers
Work procedure for slabs involves preparation of subgrade, placing reinforcement, pouring concrete and finishing the surface.
Prepare the subgrade by removing any debris and compacting the soil
Place the reinforcement according to the design specifications
Pour the concrete and level it using a screed board
Finish the surface by troweling or using a power float
Cure the slab by keeping it moist for at least 7 days
Perform qu
I applied via Walk-in and was interviewed in Jun 2024. There were 4 interview rounds.
posted on 13 Oct 2024
I applied via Approached by Company
I have 10 years of experience in civil engineering.
10 years of experience in civil engineering
Worked on various projects including bridge construction and road design
Managed teams and coordinated with clients and stakeholders
Stay updated on industry trends and regulations
I have extensive experience working on railway projects, including design, construction, and maintenance.
Designed railway tracks to meet safety and operational standards
Managed construction of railway infrastructure such as bridges and tunnels
Performed regular inspections and maintenance to ensure smooth operation
Collaborated with stakeholders including government agencies and contractors
Implemented innovative solution
BBS full form is Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS stands for Bar Bending Schedule
It is a detailed list of reinforcement bars used in a structure
It includes information on bar sizes, shapes, quantities, and placement
BBS is essential for ensuring proper reinforcement in construction projects
I have worked at multiple engineering firms specializing in infrastructure projects.
Worked at XYZ Engineering firm for 5 years
Managed a team of engineers on various bridge construction projects
Collaborated with government agencies on road improvement initiatives
I applied via Job Portal and was interviewed before Dec 2023. There was 1 interview round.
I was asked about my previous job profile and the assignments I completed. This interview was very pleasant, and I have never experienced anything like it before. However, in the end, I was not offered an opportunity to join, and as of now, my application remains in pending status despite receiving confirmation from the Project Head in Hyderabad. Therefore, I am still hopeful for a fruitful association with the Tata Project. Thank you.
posted on 1 Jun 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Construction joints are provided in structures to allow for the placement of concrete in different stages and to prevent cracks.
Construction joints are used to separate different concrete placements, typically due to time constraints or logistical reasons.
They help to reduce the risk of cracks forming in the structure by controlling where the concrete shrinks and expands.
Construction joints are commonly used in large c...
posted on 6 Jun 2024
posted on 6 Oct 2023
I applied via Company Website and was interviewed before Oct 2022. There were 3 interview rounds.
All certificate checking, service starting to end all company presentation and work experience discussion.
posted on 9 Mar 2023
I applied via Recruitment Consulltant and was interviewed before Mar 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 2 interview rounds.
posted on 20 Sep 2024
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
Group Dissection with telephone call
based on 19 reviews
Rating in categories
Senior Engineer
436
salaries
| ₹5 L/yr - ₹18 L/yr |
Planning Engineer
202
salaries
| ₹4.5 L/yr - ₹12 L/yr |
Civil Engineer
191
salaries
| ₹2 L/yr - ₹10.5 L/yr |
Executive Engineer
171
salaries
| ₹3.5 L/yr - ₹11.9 L/yr |
Engineer
164
salaries
| ₹3.5 L/yr - ₹10.3 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
GAMMON INDIA