i
AECOM
Filter interviews by
I applied via LinkedIn and was interviewed in May 2022. There were 2 interview rounds.
Hydration process is the chemical reaction between cement and water which results in the hardening of concrete.
Hydration process starts as soon as water is added to cement.
The reaction produces heat and causes the mixture to harden and gain strength.
The process continues for weeks and even months, resulting in a stronger and more durable concrete.
The amount of water used in the mixture affects the hydration process and...
Concrete strength depends on various factors.
Water-cement ratio
Type and quality of cement
Aggregate size and shape
Curing conditions
Mix design
Age of concrete
Temperature and humidity
Presence of admixtures
Water is added to concrete mixer to make the mixture more workable and to achieve the desired consistency.
Water is added to hydrate the cement and activate the chemical reaction that causes it to harden
The amount of water added affects the strength and durability of the concrete
Too much water can weaken the concrete and cause cracking
The water should be added gradually and mixed thoroughly to ensure even distribution
Ot...
Top trending discussions
posted on 20 Jun 2024
Hydraulic refers to the study of fluids in motion and the engineering applications of fluid mechanics.
Hydraulic engineering involves the design and construction of structures that control the flow and pressure of liquids, such as dams, canals, and pipelines.
Hydraulic systems use fluid pressure to generate, control, and transmit power, commonly found in machinery like hydraulic lifts and brakes.
Hydraulic principles are ...
posted on 11 Jul 2024
I appeared for an interview before Jul 2023.
posted on 13 Jan 2024
I applied via Naukri.com and was interviewed before Jan 2023. There was 1 interview round.
posted on 26 Jul 2024
The ratio of M25 concrete is 1:1:2 (cement:sand:aggregate)
The ratio of M25 concrete is 1:1:2, which means 1 part cement, 1 part sand, and 2 parts aggregate.
This ratio is commonly used in construction for medium strength concrete.
For example, to make 1 cubic meter of M25 concrete, you would need 1/4 cubic meters of cement, 1/4 cubic meters of sand, and 1/2 cubic meters of aggregate.
As an Assistant Engineer - Civil at my previous company, my responsibilities included assisting senior engineers in project planning, design, and construction.
Assisted senior engineers in project planning and design
Participated in site visits and inspections
Prepared project reports and documentation
Collaborated with team members and contractors
Ensured compliance with safety regulations and quality standards
Managed site operations, coordinated with contractors, ensured compliance with safety regulations.
Managed day-to-day site operations
Coordinated with contractors for timely completion of projects
Ensured compliance with safety regulations and quality standards
Prepared progress reports and communicated with stakeholders
Implemented cost-saving measures without compromising quality
The name of the client is XYZ Construction Company.
XYZ Construction Company is a well-known construction firm in the region.
They have completed several projects in the past, including the construction of a new office building in downtown.
The client has a reputation for high-quality work and timely project completion.
I applied via Referral and was interviewed before Jan 2021. There were 5 interview rounds.
Glass is a solid, transparent material made by heating a mixture of silica and other materials.
Glass is a non-crystalline, amorphous solid
It is made by heating a mixture of silica, soda ash, and lime
It can be molded into various shapes and sizes
It is used in windows, mirrors, lenses, and containers
Different types of glass include tempered, laminated, and stained glass
Graphene is a thin layer of pure carbon arranged in a hexagonal lattice.
It is the thinnest material known to man
It is a good conductor of electricity and heat
It is incredibly strong and flexible
It has potential applications in electronics, energy, and medicine
I applied via Referral and was interviewed before May 2021. There were 3 interview rounds.
I received a video call link and in that link will get the accounting basic questions for that we have to answer after a beep.
I applied via Walk-in and was interviewed in Jun 2023. There were 4 interview rounds.
Reconciliation accounts are maintained to ensure accuracy and consistency in financial records.
Helps in identifying discrepancies between different accounts
Ensures accuracy and consistency in financial statements
Facilitates easy tracking of transactions and balances
Aids in detecting errors or fraud in accounting records
Company code level is maintained for global settings applicable to all clients, while client level is maintained for specific settings unique to each client.
Company code level settings include currency, chart of accounts, and fiscal year variants.
Client level settings include customer master data, vendor master data, and sales organization data.
Blueprint phases include planning, designing, and implementation. Tables are used to organize data in a structured format.
Blueprint phases: planning, designing, implementation
Tables: organize data in structured format
Examples: creating a blueprint for a new building, using tables in a database to store information
Bank reconciliation involves comparing the bank statement with the company's records to ensure they match, while validations involve verifying the accuracy and completeness of financial transactions.
Bank reconciliation ensures that the company's records match the bank statement by comparing deposits, withdrawals, and other transactions.
Validations involve verifying the accuracy and completeness of financial transaction...
posted on 20 Aug 2021
I applied via Company Website and was interviewed in Feb 2021. There were 6 interview rounds.
posted on 31 Jan 2022
I appeared for an interview in Jan 2022.
Project Engineer
231
salaries
| ₹5.5 L/yr - ₹20 L/yr |
Senior Engineer
198
salaries
| ₹6.5 L/yr - ₹24.5 L/yr |
L2 Engineer
149
salaries
| ₹3.4 L/yr - ₹10.1 L/yr |
Architect
131
salaries
| ₹4.1 L/yr - ₹15.7 L/yr |
Associate Director
131
salaries
| ₹24 L/yr - ₹48.7 L/yr |
Shapoorji Pallonji Group
Alstom Transportation
Saint-Gobain
AtkinsRealis