The concrete ratio of M15 is 1:2:4 (cement:sand:aggregate).
M15 is a mix of concrete with a compressive strength of 15 MPa.
The ratio of cement to sand to aggregate is 1:2:4.
For example, if you need 1 cubic meter of concrete, you would use 350 kg of cement, 700 kg of sand, and 1400 kg of aggregate.
I appeared for an interview in Sep 2024.
I appeared for an interview in Apr 2025, where I was asked the following questions.
I applied via Newspaper Ad and was interviewed in Jan 2024. There were 4 interview rounds.
Just applied for approval to appear
Jst apply for appear in the assignment
Transportation and logistics play a crucial role in the market by ensuring efficient movement of goods and services.
Transportation helps in connecting producers with consumers by moving goods from one place to another.
Logistics involves the coordination of resources and processes to ensure timely delivery of products.
Efficient transportation and logistics can lead to cost savings and improved customer satisfaction.
Exam...
The strength of reinforcement of mild steel is determined by its yield strength and ultimate tensile strength.
The strength of reinforcement of mild steel is typically around 250 MPa to 600 MPa.
Yield strength is the point at which the material permanently deforms, while ultimate tensile strength is the maximum stress a material can withstand before breaking.
Reinforcement bars in construction are commonly made of mild st...
I applied via Campus Placement and was interviewed in Feb 2024. There were 3 interview rounds.
Moderate level aptitude
I appeared for an interview before May 2024, where I was asked the following questions.
Mining is the process of extracting valuable minerals or other geological materials from the earth.
Types of mining include surface mining (e.g., open-pit mining) and underground mining (e.g., shaft mining).
Commonly mined materials include coal, gold, diamonds, and various metals.
Mining operations can have significant environmental impacts, such as habitat destruction and pollution.
Safety is a critical concern in mining...
I applied via Campus Placement and was interviewed in Dec 2022. There were 3 interview rounds.
First was Assesment which consists of 4 section quant, logical, verbal and last one technical , and duration of test was 3 hours. test difficulty level is medium. You have to be very good with aptitude and core electronics subjects in curriculum.
I appeared for an interview in Dec 2022.
M-25 ratio is a mix design ratio used in concrete construction.
M-25 ratio refers to the mix design ratio of concrete, where M represents the compressive strength of concrete after 28 days of curing.
In M-25 ratio, the ratio of cement, sand, and aggregate is 1:1:2 respectively.
For example, if we need to prepare 1 cubic meter of M-25 grade concrete, we would require 1/4 cubic meter of cement, 1/4 cubic meter of sand, and ...
The initial and final setting times of ordinary Portland cement grade 33 vary depending on several factors.
The initial setting time of cement refers to the time it takes for the cement to harden and develop a certain degree of rigidity.
The final setting time is the time it takes for the cement to fully harden and reach its maximum strength.
The setting times can be influenced by factors such as temperature, water-cement...
The concrete ratio of M15 is 1:2:4 (cement:sand:aggregate).
M15 is a mix of concrete with a compressive strength of 15 MPa.
The ratio of cement to sand to aggregate is 1:2:4.
For example, if you need 1 cubic meter of concrete, you would use 350 kg of cement, 700 kg of sand, and 1400 kg of aggregate.
Dry volume cement is the volume of cement required in a dry state for a given volume of concrete.
Dry volume cement is calculated by multiplying the volume of cement required by the bulkage factor.
Bulkage factor is the ratio of the volume of dry cement to the volume of cement in a wet state.
Dry volume cement estimation is important in determining the quantity of cement required for a construction project.
For example, if...
Maths, combinatorics, MCQs.
What people are saying about Adani Group
The duration of Adani Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 16 interview experiences
Difficulty level
Duration
based on 2k reviews
Rating in categories
Assistant Manager
776
salaries
| ₹8.1 L/yr - ₹15 L/yr |
Deputy Manager
547
salaries
| ₹11.3 L/yr - ₹19.1 L/yr |
Associate Manager
390
salaries
| ₹14.7 L/yr - ₹26.7 L/yr |
Manager
243
salaries
| ₹17 L/yr - ₹30 L/yr |
Senior Engineer
239
salaries
| ₹5 L/yr - ₹9.8 L/yr |
Suzlon Group
Adani Power
NTPC
Torrent Power