M-25 ratio is a mix design ratio used in concrete construction.
M-25 ratio refers to the mix design ratio of concrete, where M represents the compressive strength of concrete after 28 days of curing.
In M-25 ratio, the ratio of cement, sand, and aggregate is 1:1:2 respectively.
For example, if we need to prepare 1 cubic meter of M-25 grade concrete, we would require 1/4 cubic meter of cement, 1/4 cubic meter of sand, and
The initial and final setting times of ordinary Portland cement grade 33 vary depending on several factors.
The initial setting time of cement refers to the time it takes for the cement to harden and develop a certain degree of rigidity.
The final setting time is the time it takes for the cement to fully harden and reach its maximum strength.
The setting times can be influenced by factors such as temperature, water-cement...
The concrete ratio of M15 is 1:2:4 (cement:sand:aggregate).
M15 is a mix of concrete with a compressive strength of 15 MPa.
The ratio of cement to sand to aggregate is 1:2:4.
For example, if you need 1 cubic meter of concrete, you would use 350 kg of cement, 700 kg of sand, and 1400 kg of aggregate.
Dry volume cement is the volume of cement required in a dry state for a given volume of concrete.
Dry volume cement is calculated by multiplying the volume of cement required by the bulkage factor.
Bulkage factor is the ratio of the volume of dry cement to the volume of cement in a wet state.
Dry volume cement estimation is important in determining the quantity of cement required for a construction project.
For example, if...
Top trending discussions
I applied via Company Website and was interviewed before Jan 2021. There were 3 interview rounds.
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
Top problems with the product include slow loading times, frequent crashes, and lack of user-friendly interface.
Slow loading times can frustrate users and lead to decreased usage of the product.
Frequent crashes can result in loss of data and negative user experience.
Lack of user-friendly interface can make it difficult for users to navigate the product and find desired features.
I applied via Approached by Company and was interviewed in Aug 2022. There were 3 interview rounds.
Closed loop control systems are feedback systems that continuously monitor and adjust the output based on the desired input.
Closed loop control systems use feedback to maintain a desired output
They continuously monitor the output and compare it to the desired input
Based on the comparison, adjustments are made to maintain the desired output
Examples include thermostat-controlled heating systems and cruise control in cars
I applied via Job Portal and was interviewed before Apr 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2022. There were 6 interview rounds.
based on 1 interview
Interview experience
Assistant Manager
760
salaries
| ₹6 L/yr - ₹18.5 L/yr |
Deputy Manager
507
salaries
| ₹6.4 L/yr - ₹20.3 L/yr |
Associate Manager
292
salaries
| ₹11.5 L/yr - ₹27.7 L/yr |
Manager
241
salaries
| ₹11 L/yr - ₹32 L/yr |
Senior Engineer
233
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Suzlon Group
Adani Power
NTPC
Torrent Power