Premium Employer

i

This company page is being actively managed by Adani Group Team. If you also belong to the team, you can get access from here

Adani Group Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 1.4k Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

Adani Group Applications Engineer Interview Questions, Process, and Tips

Updated 7 Jan 2023

Adani Group Applications Engineer Interview Experiences

1 interview found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
Not Selected

I was interviewed in Dec 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. What mining of M-25 ratio and what is M
  • Ans. 

    M-25 ratio is a mix design ratio used in concrete construction.

    • M-25 ratio refers to the mix design ratio of concrete, where M represents the compressive strength of concrete after 28 days of curing.

    • In M-25 ratio, the ratio of cement, sand, and aggregate is 1:1:2 respectively.

    • For example, if we need to prepare 1 cubic meter of M-25 grade concrete, we would require 1/4 cubic meter of cement, 1/4 cubic meter of sand, and

  • Answered by AI
  • Q2. How many oordinay Portland cement grade 33 initial and final settings time
  • Ans. 

    The initial and final setting times of ordinary Portland cement grade 33 vary depending on several factors.

    • The initial setting time of cement refers to the time it takes for the cement to harden and develop a certain degree of rigidity.

    • The final setting time is the time it takes for the cement to fully harden and reach its maximum strength.

    • The setting times can be influenced by factors such as temperature, water-cement...

  • Answered by AI
  • Q3. Concrete Ratio of m15
  • Ans. 

    The concrete ratio of M15 is 1:2:4 (cement:sand:aggregate).

    • M15 is a mix of concrete with a compressive strength of 15 MPa.

    • The ratio of cement to sand to aggregate is 1:2:4.

    • For example, if you need 1 cubic meter of concrete, you would use 350 kg of cement, 700 kg of sand, and 1400 kg of aggregate.

  • Answered by AI
  • Q4. What is dry Dry volume cement in estimation
  • Ans. 

    Dry volume cement is the volume of cement required in a dry state for a given volume of concrete.

    • Dry volume cement is calculated by multiplying the volume of cement required by the bulkage factor.

    • Bulkage factor is the ratio of the volume of dry cement to the volume of cement in a wet state.

    • Dry volume cement estimation is important in determining the quantity of cement required for a construction project.

    • For example, if...

  • Answered by AI
  • Q5. 1.52 to 1.55 in meter qube

Interview Preparation Tips

Interview preparation tips for other job seekers - Taken Interview best job finder in civil engineering

Adani Group Interview FAQs

How many rounds are there in Adani Group Applications Engineer interview?
Adani Group interview process usually has 2 rounds. The most common rounds in the Adani Group interview process are Resume Shortlist and Technical.
What are the top questions asked in Adani Group Applications Engineer interview?

Some of the top questions asked at the Adani Group Applications Engineer interview -

  1. How many oordinay Portland cement grade 33 initial and final settings t...read more
  2. What mining of M-25 ratio and what i...read more
  3. What is dry Dry volume cement in estimat...read more

Tell us how to improve this page.

Join Adani Group Growth with Goodness

Interview Questions from Similar Companies

Infosys Interview Questions
3.7
 • 7.4k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
ITC Interview Questions
4.0
 • 533 Interviews
Tata Group Interview Questions
4.2
 • 357 Interviews
Adani Power Interview Questions
3.9
 • 199 Interviews
Tata Power Interview Questions
4.0
 • 156 Interviews
View all
Assistant Manager
748 salaries
unlock blur

₹6 L/yr - ₹18.5 L/yr

Deputy Manager
498 salaries
unlock blur

₹6.4 L/yr - ₹20.3 L/yr

Associate Manager
292 salaries
unlock blur

₹11.9 L/yr - ₹27.7 L/yr

Manager
224 salaries
unlock blur

₹11 L/yr - ₹32.3 L/yr

Senior Manager
208 salaries
unlock blur

₹14 L/yr - ₹47 L/yr

Explore more salaries
Compare Adani Group with

Reliance Industries

4.1
Compare

Tata Group

4.2
Compare

Bharti Enterprises

3.8
Compare

Hindustan Unilever

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview