Magnetic core balance test is done to measure the balance of magnetic cores in a transformer.
The test is performed by injecting a current into one winding of the transformer and measuring the voltage induced in the other winding.
The test is repeated for each winding of the transformer.
The results are compared to determine if the magnetic cores are balanced.
If the magnetic cores are not balanced, it can lead to increase...
Power factor is a measure of how effectively electrical power is being used and it affects the efficiency of electrical systems.
Power factor is the ratio of real power (kW) to apparent power (kVA) in an electrical system.
It indicates how much of the total power is being used for useful work.
A power factor of 1 means all the power is being used effectively, while a power factor less than 1 indicates inefficiency.
Low pow...
Active power is the actual power consumed by a device or system.
Active power is measured in watts (W).
It is the power that is actually doing the work.
It is the product of voltage and current in an AC circuit.
It is also known as real power.
For example, a 100W light bulb consumes 100W of active power.
I applied via Naukri.com and was interviewed before Mar 2023. There was 1 interview round.
The DCS architecture of our plant is a distributed control system with a hierarchical structure. The governing system is a combination of PLCs and SCADA.
Our DCS is based on a distributed control system architecture
It has a hierarchical structure with multiple levels of control
The governing system is a combination of PLCs and SCADA
The PLCs are responsible for controlling the individual processes
The SCADA system provides...
Flame scanner detects flame by analyzing the light emitted by the flame.
Flame scanner uses a photodetector to measure the intensity of light emitted by the flame.
The photodetector sends a signal to the controller which analyzes the signal to determine if there is a flame or not.
The controller compares the signal to a pre-set threshold to determine if the light intensity is high enough to indicate a flame.
If the signal ...
I applied via LinkedIn and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via LinkedIn and was interviewed before Dec 2021. There were 2 interview rounds.
based on 2 interviews
1 Interview rounds
based on 19 reviews
Rating in categories
Assistant Manager
754
salaries
| ₹6 L/yr - ₹18.5 L/yr |
Deputy Manager
505
salaries
| ₹6.4 L/yr - ₹20.7 L/yr |
Associate Manager
278
salaries
| ₹10 L/yr - ₹29 L/yr |
Manager
243
salaries
| ₹11 L/yr - ₹34 L/yr |
Senior Engineer
231
salaries
| ₹4 L/yr - ₹10.5 L/yr |
Suzlon Group
Adani Power
NTPC
Torrent Power