Filter interviews by
I appeared for an interview in Feb 2025.
To prevent theft, conduct regular security audits, implement access control measures, use surveillance cameras, and train employees on security protocols.
Conduct regular security audits to identify vulnerabilities and areas of improvement
Implement access control measures such as keycard entry systems or biometric scanners
Use surveillance cameras to monitor high-risk areas and deter potential thieves
Train employees on s...
Documents theft can be identified by missing or altered information, unusual access patterns, and discrepancies in inventory records.
Look for missing or altered information in documents
Monitor access patterns to sensitive documents or storage areas
Compare inventory records with actual physical inventory to identify discrepancies
I want to join Adani because of their reputation for excellence in security management and their commitment to employee development.
Adani has a strong reputation for excellence in security management
I am impressed by Adani's commitment to employee development and growth opportunities
I believe my skills and experience align well with the values and goals of Adani
I appeared for an interview in Mar 2025, where I was asked the following questions.
Experienced site supervisor with a background in construction management and a proven track record of successfully overseeing projects.
Over 5 years of experience in site supervision
Strong knowledge of construction processes and safety regulations
Effective communication skills with team members and clients
Managed multiple projects simultaneously, ensuring deadlines were met
Implemented cost-saving measures without compro
I am passionate about leading teams and ensuring projects are completed successfully.
I have a strong background in construction and project management.
I enjoy the challenge of overseeing multiple tasks and problem-solving on site.
I am motivated by the opportunity to mentor and develop team members.
I thrive in fast-paced environments and am dedicated to delivering high-quality results.
My strengths include strong leadership skills, excellent communication abilities, and a proactive approach to problem-solving.
Strong leadership skills
Excellent communication abilities
Proactive approach to problem-solving
One of my weaknesses is that I can be overly critical of my own work, which can sometimes lead to perfectionism.
I tend to be a perfectionist and can spend too much time on a task to ensure it is flawless.
I have difficulty delegating tasks as I prefer to handle things on my own to ensure they are done correctly.
I can be overly self-critical, which can affect my confidence in certain situations.
Adani Green Energy interview questions for popular designations
I appeared for an interview in Mar 2025, where I was asked the following questions.
Purchasing land for wind energy involves site assessment, negotiations, and legal processes to secure land rights.
Conduct a feasibility study to assess wind resources and environmental impact.
Identify potential sites and landowners through GIS mapping and local research.
Engage with landowners to negotiate lease agreements or purchase options.
Perform due diligence, including title searches and environmental assessments.
...
Get interview-ready with Top Adani Green Energy Interview Questions
I appeared for an interview in Sep 2024, where I was asked the following questions.
I appeared for an interview in Sep 2024, where I was asked the following questions.
I appeared for an interview in Sep 2024.
To check a motor's condition, assess its electrical parameters, mechanical integrity, and operational performance.
Measure voltage and current: Use a multimeter to check if the motor is receiving the correct voltage and current.
Inspect insulation: Perform an insulation resistance test to ensure the windings are not shorted or grounded.
Check for unusual noises: Listen for grinding or rattling sounds that may indicate mec...
A limit switch is an electromechanical device that detects the presence or position of an object, often used for control and safety.
Used in industrial machinery to control the movement of parts.
Commonly found in elevators to detect the position of the elevator car.
Used in conveyor systems to stop the belt when an object is detected.
Can be used in safety applications, such as emergency stop buttons.
NO (Normally Open) and NC (Normally Closed) refer to relay contact states in electrical circuits.
NO contacts are open when the relay is not energized, allowing current to flow only when activated.
Example: A light switch that turns on a light when pressed is a NO contact.
NC contacts are closed when the relay is not energized, allowing current to flow until activated.
Example: A safety switch that cuts power when triggere...
Wiring checks ensure electrical systems are safe and functional, preventing faults and ensuring compliance with standards.
1. Visual Inspection: Check for damaged insulation or exposed wires.
2. Continuity Testing: Use a multimeter to ensure there are no breaks in the circuit.
3. Insulation Resistance Testing: Measure the resistance of insulation to prevent leakage currents.
4. Voltage Testing: Verify that the correct volt...
To solve technical issues, I follow a systematic approach involving identification, analysis, and resolution.
Identify the issue: Gather information about the problem, such as symptoms and error messages.
Analyze the root cause: Use tools like the 5 Whys or Fishbone Diagram to pinpoint the underlying issue.
Develop a solution: Brainstorm potential fixes and evaluate their feasibility.
Implement the solution: Apply the chos...
Lapping zone in column refers to the area where the stationary phase and mobile phase meet in chromatography.
The lapping zone is where the sample components interact with the stationary phase and mobile phase.
It is important for separation efficiency and resolution in chromatography.
Examples include the interface between the liquid and solid phases in column chromatography.
IS code of practice for steel structures is a set of guidelines and standards for designing and constructing steel structures.
The IS code for steel structures in India is IS 800:2007.
It covers various aspects such as material properties, design criteria, construction practices, and quality control.
The code provides guidelines for the design of steel structures to ensure safety, efficiency, and durability.
It is importan...
Concrete is a composite material made of cement, water, aggregates, and often admixtures. It has high compressive strength but low tensile strength.
Concrete is a mixture of cement, water, and aggregates like sand and gravel
It has high compressive strength, making it suitable for structural applications
However, it has low tensile strength, which can lead to cracking under tension
Reinforcement like steel bars can be adde...
Total station is a surveying instrument used for measuring angles and distances in surveying and construction.
Total station combines theodolite, electronic distance meter, and software to measure angles and distances accurately.
It is commonly used in construction, civil engineering, and land surveying.
Total station can be used for setting out buildings, roads, and other infrastructure projects.
It provides precise measu...
I applied via Naukri.com and was interviewed in Nov 2024. There were 2 interview rounds.
How to effectively address and resolve any problem.
Engage in a group discussion regarding any problem and work collaboratively to find a solution.
I applied via LinkedIn and was interviewed in Aug 2024. There were 3 interview rounds.
Online Test through adani portal
Top trending discussions
The duration of Adani Green Energy interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 163 interviews
Interview experience
based on 1.1k reviews
Rating in categories
Assistant Manager
464
salaries
| â‚ą4.8 L/yr - â‚ą14.7 L/yr |
Senior Engineer
303
salaries
| â‚ą3.9 L/yr - â‚ą9.7 L/yr |
Deputy Manager
271
salaries
| â‚ą6.6 L/yr - â‚ą20.1 L/yr |
Junior Engineer
206
salaries
| â‚ą2.7 L/yr - â‚ą6.1 L/yr |
Electrical Engineer
191
salaries
| â‚ą2.5 L/yr - â‚ą8.5 L/yr |
Adani Power
ReNew
Vestas
Jakson Group