Filter interviews by
I appeared for an interview in Sep 2024.
To check a motor's condition, assess its electrical parameters, mechanical integrity, and operational performance.
Measure voltage and current: Use a multimeter to check if the motor is receiving the correct voltage and current.
Inspect insulation: Perform an insulation resistance test to ensure the windings are not shorted or grounded.
Check for unusual noises: Listen for grinding or rattling sounds that may indicate mec...
A limit switch is an electromechanical device that detects the presence or position of an object, often used for control and safety.
Used in industrial machinery to control the movement of parts.
Commonly found in elevators to detect the position of the elevator car.
Used in conveyor systems to stop the belt when an object is detected.
Can be used in safety applications, such as emergency stop buttons.
NO (Normally Open) and NC (Normally Closed) refer to relay contact states in electrical circuits.
NO contacts are open when the relay is not energized, allowing current to flow only when activated.
Example: A light switch that turns on a light when pressed is a NO contact.
NC contacts are closed when the relay is not energized, allowing current to flow until activated.
Example: A safety switch that cuts power when triggere...
Wiring checks ensure electrical systems are safe and functional, preventing faults and ensuring compliance with standards.
1. Visual Inspection: Check for damaged insulation or exposed wires.
2. Continuity Testing: Use a multimeter to ensure there are no breaks in the circuit.
3. Insulation Resistance Testing: Measure the resistance of insulation to prevent leakage currents.
4. Voltage Testing: Verify that the correct volt...
To solve technical issues, I follow a systematic approach involving identification, analysis, and resolution.
Identify the issue: Gather information about the problem, such as symptoms and error messages.
Analyze the root cause: Use tools like the 5 Whys or Fishbone Diagram to pinpoint the underlying issue.
Develop a solution: Brainstorm potential fixes and evaluate their feasibility.
Implement the solution: Apply the chos...
I applied via Campus Placement
Company profile about
Company profile realted
Test.english questions.technical
Top trending discussions
posted on 13 Jul 2017
I appeared for an interview before Nov 2016.
Yes, I am willing to work at any location for the Senior Engineer position.
I am open to relocating for the right opportunity
I have experience working in different locations
I am flexible and adaptable to new environments
I have a proven track record of staying calm and focused in challenging situations, allowing me to problem-solve effectively.
I have experience working in high-pressure environments and have successfully delivered projects on time despite obstacles.
I am adaptable and can quickly assess a situation to determine the best course of action.
I have strong problem-solving skills and can think creatively to find solutions in ad
I appeared for an interview before Mar 2024, where I was asked the following questions.
Greenhouse gases trap heat in the atmosphere, contributing to global warming. Their Global Warming Potential (GWP) varies significantly.
Carbon Dioxide (CO2) - GWP of 1, the most prevalent greenhouse gas.
Methane (CH4) - GWP of 25, significantly more effective than CO2 over 100 years.
Nitrous Oxide (N2O) - GWP of 298, emitted from agricultural and industrial activities.
Fluorinated gases - GWP ranges from 1,000 to over 10,
EIA (Environmental Impact Assessment) evaluates the potential environmental effects of proposed projects.
1. Screening: Determine if a project requires EIA. Example: A new highway may need an EIA.
2. Scoping: Identify key issues and impacts to be assessed. Example: Assessing effects on local wildlife.
3. Impact Assessment: Analyze potential environmental impacts. Example: Evaluating air quality changes due to construction...
I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.
Numbers,LCM,HCF,Time speed Distance,Percentage
They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.
Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.
Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)
High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3
High-performance concrete: designed for specific applications, with mix pro
Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.
Prepare formwork by setting up wooden or metal molds to contain the concrete.
Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.
Pour the concrete into the formwork, ensuring it reaches all corners and edges.
Level the concrete surface using a scre...
Retaining walls are structures designed to hold back soil and prevent erosion.
Prevent soil erosion
Support sloping terrain
Create usable space on a hillside
Enhance landscaping design
Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.
Bending moment diagram shows the variation of bending moment along the length of a beam.
Shear force diagram shows the variation of shear force along the length of a beam.
These diagrams are essential for analyzing the behavior of beams under different loading conditions.
The diagrams help in determining the maximum bend...
Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.
Preparing cost estimates and budgets
Analyzing construction plans and specifications
Negotiating with contractors and suppliers
Managing contracts and variations
Conducting site visits and inspections
Preparing progress reports and final accounts
Regarding how to manage a site accommodation
I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.
Prioritize tasks based on deadlines and importance
Stay organized by creating to-do lists and setting realistic goals
Take breaks to recharge and prevent burnout
Communicate with team members and delegate tasks when necessary
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
I have 10 years of experience in electrical project management, including designing and implementing electrical systems for commercial buildings.
Managed a team of engineers and technicians to successfully complete a large-scale electrical project for a shopping mall.
Designed and installed electrical systems for office buildings, ensuring compliance with safety regulations and energy efficiency standards.
Collaborated wi...
The working process of a project involves planning, execution, monitoring, and completion.
Planning phase includes defining project goals, scope, and deliverables.
Execution phase involves assigning tasks, managing resources, and implementing the project plan.
Monitoring phase includes tracking progress, identifying issues, and making necessary adjustments.
Completion phase involves finalizing deliverables, conducting proj
The question is asking about the process from survey execution to billing and closure.
Survey execution involves designing and distributing surveys to collect data.
Data collected from surveys is then analyzed and processed.
Based on the analysis, billing is done for the services provided.
Finally, the project is closed, and any remaining tasks or documentation are completed.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
464
salaries
| ₹4.8 L/yr - ₹14.7 L/yr |
Senior Engineer
303
salaries
| ₹3.9 L/yr - ₹9.7 L/yr |
Deputy Manager
271
salaries
| ₹6.6 L/yr - ₹20.1 L/yr |
Junior Engineer
206
salaries
| ₹2.7 L/yr - ₹6.1 L/yr |
Electrical Engineer
191
salaries
| ₹2.5 L/yr - ₹8.5 L/yr |
Adani Power
ReNew
Vestas
Jakson Group