Filter interviews by
The interview question is about lean methodologies, 5S, Kaizen, TPM, and the difference between efficiency and effectiveness.
5S is a methodology for workplace organization and standardization
Kaizen is a continuous improvement methodology
TPM stands for Total Productive Maintenance and is focused on maximizing equipment effectiveness
Lean is a philosophy that aims to eliminate waste and improve efficiency
Efficiency is doi...
Productivity is the measure of output per unit of input. Time and motion study is a technique used to improve productivity by analyzing work processes.
Productivity is the ratio of output to input, usually measured in terms of labor, time, or capital.
Time and motion study is a method of analyzing work processes to identify inefficiencies and improve productivity.
This involves breaking down tasks into smaller components,...
Implemented a lean manufacturing project resulting in 20% cost reduction.
Analyzed the entire manufacturing process to identify inefficiencies
Implemented lean principles to eliminate waste and improve efficiency
Reduced inventory levels and improved supply chain management
Negotiated better pricing with suppliers
Trained employees on new processes and procedures
Resulted in a 20% reduction in overall manufacturing costs
TPM stands for Total Productive Maintenance. It is a systematic approach to equipment maintenance that aims to maximize productivity.
TPM involves all employees in the maintenance process
The 8 TPM pillars include: Autonomous Maintenance, Planned Maintenance, Quality Maintenance, Training and Education, Early Equipment Management, Office TPM, Safety, and Environment
Autonomous Maintenance involves operators taking respons...
I applied via Company Website and was interviewed in Nov 2024. There were 3 interview rounds.
I appeared for an interview in Jan 2025.
Boiler mountings are essential components attached to the boiler for safe and efficient operation.
Boiler mountings include safety valves, water level indicators, pressure gauges, and blowdown valves.
They help in ensuring the safe operation of the boiler by monitoring and controlling various parameters.
Examples of boiler mountings are safety valves that release excess pressure, water level indicators that show the water...
Action Tesa interview questions for popular designations
I applied via Campus Placement and was interviewed in Nov 2023. There was 1 interview round.
Density of different wood species varies based on factors like moisture content and growth conditions.
Wood density is typically measured in pounds per cubic foot or grams per cubic centimeter.
Hardwoods like oak and maple tend to have higher densities than softwoods like pine and cedar.
The density of wood can also vary within the same species depending on factors like age and location of growth.
Various angles of cutting saw refer to the different angles at which a saw blade can be positioned for cutting materials.
Different angles of cutting saw include 90 degrees (perpendicular), 45 degrees (miter cut), and 30 degrees (bevel cut).
These angles allow for different types of cuts to be made depending on the material and desired outcome.
Adjusting the angle of the cutting saw blade can result in more precise and ac...
Resins are materials that can be natural or synthetic and are used in various industries for their adhesive, insulating, and protective properties.
Epoxy resin: used in adhesives, coatings, and composite materials
Polyester resin: used in fiberglass reinforced plastics
Phenolic resin: used in coatings, adhesives, and molded products
Polyurethane resin: used in coatings, adhesives, and sealants
Silicone resin: used in coatin
Testing procedures for MDF products according to BIS standards
Testing for physical properties like density, moisture content, and thickness
Testing for mechanical properties like modulus of rupture and internal bond strength
Testing for formaldehyde emission levels to ensure compliance with BIS standards
Testing for dimensional stability and surface soundness
Examples of tests include BIS 1734, BIS 3087, and BIS 12406
Get interview-ready with Top Action Tesa Interview Questions
I applied via Company Website and was interviewed in Jan 2024. There were 3 interview rounds.
What do you know in sap pp module
The process of production involves converting raw materials or components into finished goods through various stages.
1. Planning: Determine the product to be made, materials needed, and production schedule.
2. Sourcing: Acquire raw materials or components from suppliers.
3. Manufacturing: Transform raw materials into finished goods through assembly or processing.
4. Quality control: Inspect and test products to ensure the...
I applied via Approached by Company and was interviewed before Jun 2021. There was 1 interview round.
I applied via Referral and was interviewed in Sep 2023. There was 1 interview round.
Maintain accurate records, conduct regular audits, implement inventory management software
Maintain accurate records of all inventory items
Conduct regular audits to identify discrepancies and prevent theft
Implement inventory management software to track inventory levels and streamline processes
Experienced executive assistant with strong organizational skills and attention to detail.
Over 5 years of experience supporting C-level executives
Proficient in calendar management, travel coordination, and meeting planning
Excellent communication and interpersonal skills
Ability to prioritize tasks and work efficiently under pressure
I was responsible for providing administrative support to executives, managing calendars, organizing meetings, and handling correspondence.
Managed executives' calendars and scheduled appointments
Coordinated meetings and conferences
Handled correspondence and communication on behalf of executives
Prepared reports and presentations
Managed travel arrangements
I appeared for an interview before Mar 2024, where I was asked the following questions.
As a fresher, I aim to gain practical experience, contribute to projects, and develop my skills in production engineering.
Gain hands-on experience in production processes, such as assembly line operations.
Contribute to team projects, enhancing collaboration and communication skills.
Learn about quality control measures to ensure product standards are met.
Develop problem-solving skills by tackling real-world engineering ...
I would focus on process optimization, team collaboration, and continuous improvement to enhance production efficiency.
Conduct a thorough analysis of current production processes to identify bottlenecks and inefficiencies.
Implement Lean Manufacturing principles to streamline operations, such as reducing waste and improving workflow.
Foster a culture of open communication and collaboration within the team to encourage in...
I applied via Recruitment Consulltant and was interviewed in May 2023. There were 3 interview rounds.
Top trending discussions
Some of the top questions asked at the Action Tesa interview -
The duration of Action Tesa interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 38 interviews
Interview experience
based on 441 reviews
Rating in categories
Assistant Engineer
91
salaries
| ₹1.5 L/yr - ₹4.2 L/yr |
Junior Engineer
44
salaries
| ₹1.4 L/yr - ₹3 L/yr |
Area Sales Manager
38
salaries
| ₹4.2 L/yr - ₹8.5 L/yr |
Marketing Executive
33
salaries
| ₹3 L/yr - ₹4.6 L/yr |
Production Engineer
20
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
JK Cement
ACC
Ambuja Cements
Nuvoco Vistas