Filter interviews by
Project management techniques refer to the methods and tools used to plan, execute, and monitor projects.
Agile methodology
Waterfall methodology
Critical path method
PERT (Program Evaluation and Review Technique)
Gantt charts
Risk management
Stakeholder management
I am passionate about utilizing my technical skills to drive sales and provide innovative solutions to customers.
I have a strong background in engineering and enjoy working with customers to understand their needs.
I am motivated by the challenge of meeting sales targets and exceeding customer expectations.
I believe this role will allow me to combine my technical expertise with my passion for sales and customer service.
Yokogawa interview questions for popular designations
I appeared for an interview in Sep 2024.
Some verbal, numbering system, Reasoning questions
Get interview-ready with Top Yokogawa Interview Questions
I appeared for an interview in Feb 2025, where I was asked the following questions.
Syniti ADM data flow is a structured process for efficient data migration and management.
Data Assessment: Evaluate existing data quality and structure before migration.
Data Mapping: Define how source data translates to target systems.
Data Transformation: Cleanse and format data to meet target requirements.
Data Loading: Transfer data into the target system using automated tools.
Validation: Ensure data integrity and accu
The data migration process flow involves planning, extraction, transformation, validation, and loading of data.
1. Planning: Define scope, objectives, and timeline for the migration project.
2. Data Extraction: Retrieve data from the source system, e.g., exporting data from a legacy database.
3. Data Transformation: Cleanse and format data to meet the requirements of the target system, e.g., converting date formats.
4. Dat...
Number system,1 hr,coding
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
PLC is used for general automation while safety PLC is specifically designed for safety-critical applications.
PLC is used for controlling machinery and processes in industrial automation.
Safety PLC is designed to meet safety standards and regulations for critical applications.
Safety PLCs have built-in safety functions like monitoring input signals for safety-critical devices.
PLCs are more cost-effective for general aut...
DCS is used for continuous control of processes, while safety PLC is used for emergency shutdown and safety functions.
DCS (Distributed Control System) is used for continuous control and monitoring of processes in industries like oil & gas, power plants, and chemical plants.
Safety PLC (Programmable Logic Controller) is specifically designed for safety-critical applications, such as emergency shutdown systems and safety ...
Aptitude with logics, verbal and wuants
Experienced supervisor with a background in team management and project coordination.
Over 5 years of experience in supervisory roles
Skilled in team leadership and conflict resolution
Managed multiple projects simultaneously, ensuring timely completion
I applied via Company Website and was interviewed in Jul 2023. There were 2 interview rounds.
Top trending discussions
The duration of Yokogawa interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 31 interviews
Interview experience
based on 527 reviews
Rating in categories
Executive Engineer
418
salaries
| ₹3.5 L/yr - ₹11 L/yr |
Assistant Manager
340
salaries
| ₹5.8 L/yr - ₹18.2 L/yr |
Executive
157
salaries
| ₹3 L/yr - ₹11.1 L/yr |
Deputy Manager
106
salaries
| ₹8.5 L/yr - ₹23 L/yr |
DCS Engineer
105
salaries
| ₹2.8 L/yr - ₹8 L/yr |
Bosch
Faurecia
Hitachi Astemo
Valeo