DCS Engineer

10+ DCS Engineer Interview Questions and Answers

Updated 8 Nov 2024
search-icon

Q1. why Ssc is increased when load is reduced As a dcs engineer what should you do if vacuum is decreasing continuesly what are the turbine bearings temperatures running on full load alarms and trippings value

Ans.

SSC increases when load is reduced due to increased reactive power. Decreasing vacuum may indicate a leak or malfunction. Turbine bearing temperatures and alarms/trippings values depend on specific turbine model and operating conditions.

  • SSC (Synchronous Condenser Capacity) increases when load is reduced due to increased reactive power.

  • Decreasing vacuum may indicate a leak or malfunction in the system. As a DCS engineer, investigate the cause and take appropriate action.

  • Turbin...read more

Q2. Which DCS you have handled and it's iOS capacity

Ans.

I have handled Honeywell Experion PKS DCS with iOS capacity of 50,000 points.

  • I have experience working with Honeywell Experion PKS DCS.

  • The iOS capacity of the DCS I handled was 50,000 points.

  • I am familiar with the configuration and programming of the DCS.

  • I have worked on various projects involving the DCS, including installation, commissioning, and maintenance.

  • I have also provided training to operators and maintenance personnel on the use of the DCS.

DCS Engineer Interview Questions and Answers for Freshers

illustration image

Q3. what is controlled and uncontrolled extraction?

Ans.

Controlled extraction is a process where the extraction rate is regulated, while uncontrolled extraction is a process where the extraction rate is not regulated.

  • Controlled extraction involves regulating the rate of extraction to achieve a desired outcome

  • Uncontrolled extraction involves allowing the extraction to occur without any regulation or control

  • Examples of controlled extraction include brewing coffee or tea, while uncontrolled extraction can occur in natural processes l...read more

Q4. What is the heat rate of the plant?

Ans.

The heat rate of a plant is a measure of its efficiency in converting fuel into electricity.

  • Heat rate is typically measured in British thermal units (BTUs) per kilowatt-hour (kWh) of electricity generated.

  • A lower heat rate indicates a more efficient plant, as it requires less fuel to produce the same amount of electricity.

  • Factors that affect heat rate include the type of fuel used, the design and condition of the plant's equipment, and the operating conditions.

  • Calculating the...read more

Are these interview questions helpful?

Q5. what is bolier. what is mounting and Acciseries of boiler. Boiler lightup procedure what happens when drum ssfety blow.

Ans.

A boiler is a closed vessel in which water or other fluid is heated. Mountings and accessories are components attached to the boiler for its proper functioning.

  • Boiler mounting refers to the necessary fittings and devices for the safe operation of a boiler, such as safety valves, water level indicators, pressure gauges, etc.

  • Boiler accessories are additional components that help in improving the efficiency and performance of the boiler, such as economizers, superheaters, blowdo...read more

Q6. Types of Loop in DCS , explain cascade loop

Ans.

DCS loops include feedback, feedforward, and cascade loops. Cascade loop involves two or more loops working together.

  • Feedback loop: measures output and adjusts input to maintain desired output

  • Feedforward loop: anticipates changes in input and adjusts output accordingly

  • Cascade loop: involves two or more loops working together to control a process. The output of one loop is used as the setpoint for another loop.

  • Example: controlling the temperature of a chemical reactor using a ...read more

Share interview questions and help millions of jobseekers 🌟

man-with-laptop

Q7. What to do in power fail and all emergency problem.

Ans.

In case of power failure and emergencies, follow proper protocols and procedures to ensure safety and minimize damage.

  • Immediately notify relevant personnel about the power failure or emergency situation.

  • Follow emergency procedures and protocols as outlined in the company's safety guidelines.

  • Ensure the safety of all personnel and equipment by following evacuation procedures if necessary.

  • Attempt to restore power or resolve the emergency situation using available resources and e...read more

Q8. Distillation column design principles

Ans.

Distillation column design principles involve understanding the separation process, heat transfer, and fluid dynamics.

  • Understanding the separation process is crucial for designing an efficient distillation column.

  • Consider the heat transfer requirements to ensure proper temperature control within the column.

  • Fluid dynamics play a key role in determining the flow patterns and efficiency of the distillation process.

DCS Engineer Jobs

DCS Engineer - Hardware & Software 4-6 years
EMERSON INNOVATION CENTER
4.1
Noida
Production DCS Engineer 3-7 years
PCBL Chemical Limited
4.0
Durgapur
DCS Engineer 4-9 years
Kevin Process Technologies
3.6
Ahmedabad

Q9. How to Synchronized light up the plant

Ans.

Synchronized light up of the plant can be achieved through proper planning and implementation of control systems.

  • Develop a detailed plan for the synchronization process

  • Install and configure a control system that can handle the synchronization

  • Ensure that all lighting fixtures are compatible with the control system

  • Test the synchronization process thoroughly before implementation

Q10. MSDS of product you have handled

Ans.

I have handled MSDS of various chemicals including Xylene, Toluene, and Acetone.

  • I have experience in reading and interpreting MSDS sheets

  • I am aware of the hazards associated with the chemicals I have handled

  • I have followed proper safety protocols while handling these chemicals

  • Examples of chemicals I have handled include Xylene, Toluene, and Acetone

Q11. What is the most important question.

Ans.

The most important question is the one that leads to the solution.

  • The question that helps identify the root cause of a problem

  • The question that helps make an informed decision

  • The question that helps achieve a goal

  • The question that helps improve a process or system

Q12. Critical speed of ball mill

Ans.

Critical speed of ball mill is the speed at which the centrifugal forces equal gravitational forces at the mill shell's inside surface.

  • Critical speed is calculated by the formula: Nc = 1/(2*pi*sqrt(D/g)) where Nc is the critical speed, D is the diameter of the mill in meters, and g is the acceleration due to gravity (9.81 m/s^2).

  • At critical speed, the grinding media in the mill starts rotating with the mill shell and no longer falls back, but stays on the perimeter of the mil...read more

Q13. Difference between PSV & PRV

Ans.

PSV is a pressure safety valve used in process industries while PRV is a pressure relief valve used in plumbing and HVAC systems.

  • PSV is designed to protect process equipment from overpressure while PRV is designed to protect plumbing and HVAC systems from overpressure.

  • PSV is typically set to open at a higher pressure than PRV.

  • PSV is usually larger in size than PRV due to the higher flow rates in process industries.

  • Examples of PSV applications include oil and gas refineries, c...read more

Q14. difference between yokogwa and honeywell

Ans.

Yokogawa and Honeywell are both industrial automation companies, but with different areas of expertise.

  • Yokogawa specializes in process control systems, measurement instruments, and test equipment.

  • Honeywell focuses on aerospace, building technologies, and performance materials.

  • Yokogawa has a strong presence in the oil and gas industry, while Honeywell has a strong presence in aviation and defense.

  • Both companies offer similar products such as distributed control systems and saf...read more

Q15. AFBC Start-up procedures

Ans.

AFBC start-up procedures involve several steps to ensure safe and efficient operation.

  • Inspect fuel and air supply systems

  • Check boiler water level and pressure

  • Purge furnace and flue gas passages

  • Start ID and FD fans

  • Ignite fuel and adjust air flow

  • Monitor temperature and pressure

  • Gradually increase load

Q16. How to do priming

Ans.

Priming is the process of filling a pump with liquid to create suction and facilitate the flow of the liquid through the system.

  • Ensure the pump is properly connected to the system

  • Open the pump's priming valve to allow air to escape and liquid to enter

  • Monitor the pump's pressure gauge to ensure proper priming

  • Close the priming valve once the pump is fully primed

  • Start the pump to begin the flow of liquid through the system

Q17. How to start pumps

Ans.

Pumps can be started by following proper procedures and ensuring all safety measures are in place.

  • Check if the pump is properly connected to power source

  • Ensure all valves are open and there are no blockages in the system

  • Start the pump by following the manufacturer's instructions

  • Monitor the pump operation for any abnormalities

  • Shut down the pump properly when not in use

Q18. Effect of scalling

Ans.

Scaling in DCS engineering refers to adjusting the size or magnitude of a system or process.

  • Scaling can affect the accuracy and resolution of measurements in a DCS system.

  • It can impact the range of values that can be represented or controlled.

  • Scaling factors may need to be applied to ensure compatibility between different components or systems.

  • For example, scaling may be necessary when integrating sensors with different measurement ranges into a DCS system.

Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Interview experiences of popular companies

4.2
 • 245 Interviews
3.7
 • 34 Interviews
3.7
 • 15 Interviews
View all

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary

DCS Engineer Interview Questions
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
65 L+

Reviews

4 L+

Interviews

4 Cr+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter