Filter interviews by
Project management techniques refer to the methods and tools used to plan, execute, and monitor projects.
Agile methodology
Waterfall methodology
Critical path method
PERT (Program Evaluation and Review Technique)
Gantt charts
Risk management
Stakeholder management
I applied via Campus Placement and was interviewed before Dec 2021. There were 3 interview rounds.
Technical , mathematics,all questions were related to general aptitude test.
I applied via Naukri.com and was interviewed in Mar 2021. There were 3 interview rounds.
SCADA is a system used to monitor and control industrial processes and infrastructure.
SCADA stands for Supervisory Control and Data Acquisition
It allows for remote monitoring and control of various processes and equipment
SCADA systems are commonly used in industries such as manufacturing, energy, and water treatment
They can help improve efficiency, reduce downtime, and increase safety
Examples of SCADA systems include m...
OPC Protocol is a standard for industrial communication. Testing can be done using OPC test clients and servers.
OPC stands for OLE for Process Control
OPC is a standard for communication between industrial devices and software applications
OPC test clients and servers can be used to test communication
OPC UA (Unified Architecture) is the latest version of the protocol
Testing can include checking for data integrity, securi
Redundancy in Modbus ensures reliable communication by providing backup systems.
Redundancy in Modbus involves having duplicate systems or components that can take over if the primary system fails.
It helps to prevent communication failures and ensure continuous operation.
There are different types of redundancy in Modbus, such as network redundancy and device redundancy.
Network redundancy involves having multiple communi...
Yokogawa interview questions for popular designations
I applied via Company Website and was interviewed before Aug 2020. There were 5 interview rounds.
The market size and achievable sales depend on various factors such as target audience, competition, and market trends.
Market size can be determined by analyzing the total addressable market (TAM) and the served available market (SAM).
Achievable sales can be estimated by considering the market share potential and the company's sales strategy.
Factors like customer demand, pricing, distribution channels, and marketing ef...
Get interview-ready with Top Yokogawa Interview Questions
I applied via Recruitment Consultant
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
DCS system architecture refers to the design and layout of a distributed control system.
DCS system architecture involves a network of controllers, sensors, and actuators.
The system is designed to control and monitor various processes in an industrial setting.
The architecture typically includes a central control room, field devices, and communication networks.
DCS systems can be customized to meet the specific needs of a...
Electrical earth is used for safety of electrical equipment while instrument earth is used for safety of instruments.
Electrical earth is used to protect electrical equipment from electrical faults and surges.
Instrument earth is used to protect sensitive instruments from electrical noise and interference.
Electrical earth is connected to the earth electrode while instrument earth is connected to the instrument chassis.
El...
I applied via Walk-in and was interviewed before Oct 2020. There was 1 interview round.
I applied via Referral and was interviewed before Nov 2020. There were 3 interview rounds.
Top trending discussions
The duration of Yokogawa interview process can vary, but typically it takes about 2-4 weeks to complete.
based on 29 interviews
Interview experience
based on 512 reviews
Rating in categories
Executive Engineer
423
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
285
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
153
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
117
salaries
| ₹0 L/yr - ₹0 L/yr |
System Engineer
101
salaries
| ₹0 L/yr - ₹0 L/yr |
Siemens
Emerson Electric Co.
ABB
Schneider Electric