Filter interviews by
Be the first one to contribute and help others!
I applied via LinkedIn and was interviewed in Oct 2024. There were 2 interview rounds.
Yes, I have 5 years of experience working in data centers.
Managed server hardware installations and upgrades
Performed routine maintenance tasks such as cabling and rack mounting
Troubleshooted network and server issues
Implemented disaster recovery plans
Monitored and optimized data center performance
Components inside a server include CPU, RAM, hard drives, power supply, motherboard, and network interface cards.
CPU (Central Processing Unit) - processes instructions and performs calculations
RAM (Random Access Memory) - stores data and instructions that the CPU needs
Hard drives - store data and programs long-term
Power supply - provides electricity to the server components
Motherboard - connects all the components toge...
Before turning off a server, it is important to properly shut down all running applications and services to prevent data loss or corruption.
Save any work in progress and close all applications
Ensure all services are stopped gracefully
Check for any pending updates or patches
Backup important data if necessary
Notify users or stakeholders about the planned shutdown
Document the shutdown process for future reference
Different types of optical cables include single-mode fiber, multi-mode fiber, and plastic optical fiber.
Single-mode fiber: used for long-distance communication, has a small core size and transmits infrared laser light.
Multi-mode fiber: used for shorter distances, has a larger core size and transmits infrared LED light.
Plastic optical fiber: used for short-distance applications like home networks, made of plastic inste
Troubleshooting network issues involves identifying the problem, gathering information, isolating the cause, and implementing a solution.
Identify the problem by gathering information from users and monitoring tools
Isolate the cause by checking network configurations, hardware, and software
Implement a solution by making necessary changes and testing the network
Document the troubleshooting process for future reference
I use tools like optical power meters, visual fault locators, and OTDRs to check optical fiber.
Optical power meters measure the power level of the optical signal.
Visual fault locators help identify breaks or bends in the fiber.
OTDRs (Optical Time Domain Reflectometers) analyze the quality of the fiber by sending pulses of light and measuring reflections.
posted on 21 Dec 2024
I applied via AmbitionBox and was interviewed in Nov 2024. There was 1 interview round.
posted on 21 Aug 2024
I applied via Referral and was interviewed in Jul 2024. There were 2 interview rounds.
Standard Methods of Measurement (SMM) are guidelines used in the construction industry to measure and quantify building works.
SMM7 (Standard Method of Measurement of Building Works 7th Edition) - widely used in the UK for measuring building works
CESMM (Civil Engineering Standard Method of Measurement) - used for civil engineering works
NRM (New Rules of Measurement) - developed by the Royal Institute of Chartered Survey...
Software such as Bluebeam, Planswift, and CostX are commonly used for quantity stack-off and estimation in construction.
Bluebeam
Planswift
CostX
NRM stands for New Rules of Measurement. NRM1 covers the preparation of bills of quantities, NRM2 covers the measurement rules for capital building works, and NRM3 covers the measurement rules for building maintenance works.
NRM1 is used for the preparation of bills of quantities in construction projects.
NRM2 provides measurement rules for capital building works, ensuring consistency and accuracy in quantifying construc...
Value Engineering is a systematic and organized approach to providing necessary functions in a project at the lowest cost.
Value Engineering involves analyzing the functions of a project to determine the best way to achieve them at the lowest cost.
It focuses on improving the value of a project by optimizing its functions, quality, and cost.
Value Engineering often involves brainstorming sessions with a team of experts to...
Quantity Surveyors play a crucial role in both pre-contract and post-contract stages by managing costs and ensuring projects stay within budget.
Pre-Contract Stage: preparing cost estimates, bills of quantities, tender documents, and negotiating with contractors.
Post-Contract Stage: managing costs, valuing work done, handling variations, and settling final accounts.
Quantity Surveyors also provide advice on contractual m...
Salary expectation is based on qualifications, experience, industry standards, and location.
Consider industry standards for Civil Quantity Surveyors and Site Engineers
Take into account your level of experience and qualifications
Factor in the location of the job as cost of living varies
Research average salaries for similar positions in your area
Be prepared to negotiate based on benefits and perks offered
I am able to join with a notice period of 1 month.
I can join with a notice period of 1 month
I am flexible with my notice period
I can discuss and negotiate the notice period if needed
I am open to discussing a competitive salary based on the responsibilities and expectations of the role.
Express willingness to negotiate based on job requirements
Research industry standards and company budget before giving a range
Consider benefits, bonuses, and other perks in addition to base salary
Avoid giving a specific number unless pressed, focus on overall compensation package
Sport colour refers to the specific color used to identify different teams or players in sports.
Sport colour helps differentiate between teams or players during a game or competition
It is often used on uniforms, equipment, or accessories
Examples include the green jerseys of the Boston Celtics in basketball or the yellow jerseys of the Tour de France leader in cycling
Pantone is a standardized color matching system used in various industries, particularly in printing and design.
Pantone provides a universal language for communicating colors accurately.
Each color in the Pantone system is assigned a unique code, making it easy to replicate colors across different materials and processes.
Designers and printers use Pantone swatch books to select and match colors for consistent results.
Pa...
posted on 12 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
LEL stands for Lower Explosive Limit, which is the minimum concentration of a gas or vapor in air that will ignite if a source of ignition is present.
LEL is used to determine the potential for a fire or explosion in a confined space.
Procedures for LEL testing involve using gas detection equipment to measure the concentration of a specific gas in the air.
If the LEL of a gas is exceeded, it indicates a potentially hazard...
Control of confined spaces is essential for ensuring the safety of workers in potentially hazardous environments.
Implementing a permit-to-work system to control access to confined spaces
Conducting thorough risk assessments before entry
Providing appropriate training for workers on confined space entry procedures
Using gas detectors and ventilation systems to monitor and control atmospheric conditions
Having a rescue plan
posted on 2 Sep 2024
I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.
Synthesis of knoeve agel product using piperidine catalyst
Numerical reasoning, logical reasoning,
I applied via Approached by Company and was interviewed in Jun 2024. There were 2 interview rounds.
The company recently implemented a new accounting software system.
Advantage: Increased efficiency in processing transactions and generating reports.
Advantage: Improved accuracy in financial data recording and analysis.
Disadvantage: Initial learning curve for employees to adapt to the new system.
Disadvantage: Potential downtime during system implementation and data migration.
Co-education allows for better socialization and understanding between genders, but separate education can provide a more focused learning environment.
Co-education promotes gender equality and helps in breaking stereotypes.
Separate education can lead to less distractions and better academic performance in some cases.
Co-education can help in developing communication and teamwork skills.
Separate education may cater to sp...
Macros are automated tasks that can be created in software applications to perform repetitive tasks. Types include keyboard macros, spreadsheet macros, and programming macros.
Macros are automated tasks that can be created in software applications to perform repetitive tasks.
Types of macros include keyboard macros, spreadsheet macros, and programming macros.
Keyboard macros are shortcuts that automate a series of keystro...
Yes, I have experience in bulk import and export of data using tools like Excel, CSV, and database management systems.
Proficient in using Excel for bulk import and export of data
Experience with CSV files for transferring large amounts of data
Knowledge of database management systems for efficient import and export processes
Creative types in DCM refer to individuals who think outside the box and come up with innovative solutions for digital campaign management.
Creative types in DCM often have a background in design, marketing, or advertising.
They are skilled at creating visually appealing and engaging content for digital platforms.
Examples include graphic designers, content creators, and social media managers.
posted on 28 Oct 2024
I applied via Company Website and was interviewed in Apr 2024. There were 4 interview rounds.
Currently responsible for analyzing procurement data and identifying cost-saving opportunities. Achievements include implementing new vendor contracts resulting in 15% cost reduction.
Analyze procurement data to identify cost-saving opportunities
Implement new vendor contracts to reduce costs
Track and report on cost savings achieved
based on 12 reviews
Rating in categories
JustDial
Sulekha.com
Indiamart Intermesh
TradeIndia (Infocom Network Private Limited)