Filter interviews by
GA Extraction Drawing involves creating a General Arrangement drawing for piping systems, detailing layout and components.
Identify the scope of the project and gather relevant data.
Use CAD software to draft the layout, ensuring all components are represented.
Include dimensions, annotations, and references to other drawings.
Verify the drawing against project specifications and standards.
Example: For a chemical plan...
Resolving class support and piping involves ensuring proper alignment, load distribution, and compliance with design standards.
Identify the class of support required based on load and pipe size.
Use proper materials for supports to prevent corrosion and ensure durability.
Ensure that supports are placed at appropriate intervals to prevent sagging.
Consider thermal expansion and contraction when designing support loca...
Projects typically progress through five key phases: initiation, planning, execution, monitoring, and closure.
Initiation: Define project goals and feasibility. Example: Conducting a feasibility study for a new product.
Planning: Develop a detailed project plan, including timelines and resources. Example: Creating a Gantt chart for a software development project.
Execution: Implement the project plan and manage teams...
Effective team building requires clear communication, trust, collaboration, and shared goals to enhance productivity and morale.
Establish clear roles and responsibilities to avoid confusion; for example, define who leads meetings and who handles project documentation.
Encourage open communication by creating a safe environment for team members to share ideas and feedback; consider regular check-ins or feedback sess...
What people are saying about Worley
Losing shares can lead to financial instability, reduced investor confidence, and operational challenges for the company.
Financial instability: A drop in share prices can limit access to capital for future projects.
Investor confidence: Share losses may lead to a lack of trust from investors, affecting stock performance.
Operational challenges: Reduced funding can hinder research and development, impacting innovatio...
Tool testing in Tekla involves evaluating various functionalities for structural design and detailing.
Check the accuracy of the modeling tools by creating a simple structure like a beam or column.
Test the interoperability with other software by importing/exporting models in formats like IFC or DWG.
Evaluate the customization options by creating a custom template for reports or drawings.
Assess the clash detection fe...
Setting up data replication involves configuring source and target systems for synchronized data transfer.
Identify the source and target databases for replication.
Choose the replication method (e.g., snapshot, transactional, or merge).
Configure network settings to ensure connectivity between systems.
Set up replication agents or services on both source and target.
Test the replication process to ensure data consiste...
Setting up a Project Workshare involves configuring shared resources and collaboration tools for team efficiency.
Define project scope and objectives to align team efforts.
Set up a shared workspace using tools like Autodesk BIM 360 or similar.
Establish user permissions and roles to control access to project files.
Create a project folder structure for organized file management.
Implement version control to track chan...
Maintenance activities ensure systems run smoothly, involving regular checks, updates, and repairs to prevent issues.
Regular system backups to prevent data loss.
Software updates to enhance security and functionality.
Performance monitoring to identify and resolve bottlenecks.
Hardware inspections to ensure all components are functioning properly.
User access reviews to maintain security and compliance.
HVAC heat load calculation determines the heating and cooling requirements for a space to maintain comfort.
Identify the space dimensions: Measure length, width, and height of the area.
Calculate heat gain/loss: Consider factors like insulation, windows, and occupancy.
Use the Manual J method: A widely accepted calculation method for residential loads.
Account for equipment: Include heat generated by appliances and li...
I applied via Company Website and was interviewed before Aug 2021. There were 3 interview rounds.
Expected CTC is negotiable based on the job role, experience, and company policies.
CTC depends on the job role and responsibilities
Experience and skills of the candidate also play a crucial role in determining the CTC
Company policies and budget also influence the CTC
Negotiation is possible based on the candidate's expectations and the company's offer
CTC can be discussed during the final stages of the interview process
I applied via Campus Placement and was interviewed in Nov 2024. There were 3 interview rounds.
Basic Aptitude Questions Reasoning & Verbal Ability
How is culture at IT Industries
Tensile forces are forces that stretch or pull materials apart.
Tensile forces act in the opposite direction of compressive forces
Examples of tensile forces include stretching a rubber band or pulling on a rope
Tensile strength is a measure of a material's ability to withstand tensile forces
Formulas in Fluid Mechanics
Bernoulli's equation: P + 0.5ρv^2 + ρgh = constant
Continuity equation: A1v1 = A2v2
Navier-Stokes equation: ρ(∂v/∂t + v∇v) = -∇P + μ∇^2v + ρg
Ideal gas law: PV = nRT
Poiseuille's Law: Q = πr^4(ΔP)/(8ηL)
The fundamental laws of thermodynamics govern the behavior of energy in systems.
First Law of Thermodynamics: Energy cannot be created or destroyed, only transferred or converted.
Second Law of Thermodynamics: The entropy of an isolated system will always increase over time.
Third Law of Thermodynamics: As temperature approaches absolute zero, the entropy of a system approaches a minimum value.
Examples: A car engine conve...
Fourier's Law describes the flow of heat through a material.
Fourier's Law states that the rate of heat transfer through a material is directly proportional to the negative gradient of temperature and the area perpendicular to the direction of heat flow.
The equation for Fourier's Law is q = -k * A * (dT/dx), where q is the heat transfer rate, k is the thermal conductivity of the material, A is the cross-sectional area, ...
The Iron-Carbon phase diagram illustrates the phases and microstructures of iron-carbon alloys as a function of temperature and composition.
Shows the phases of iron and carbon at different temperatures and compositions
Includes regions for austenite, ferrite, cementite, and pearlite
Critical points such as eutectic point and eutectoid point are marked
Used to predict the microstructure of steel based on composition and he...
The stress-strain curve shows the relationship between stress (force applied) and strain (resulting deformation) in a material.
The curve typically consists of three main regions: elastic deformation, plastic deformation, and fracture.
In the elastic region, the material deforms elastically and returns to its original shape when the stress is removed.
The plastic region is where permanent deformation occurs, but the mater...
SFD and BMD are calculated using equations of equilibrium and relationships between load, shear force, and bending moment.
Calculate reactions at supports using equations of equilibrium
Determine the shear force at different points along the beam by considering the applied loads and reactions
Calculate the bending moment at different points by integrating the shear force diagram
Plot the SFD and BMD based on the calculated...
Velocity of fluid flowing through a pipe can be calculated using the formula Q = A * V, where Q is the flow rate, A is the cross-sectional area of the pipe, and V is the velocity of the fluid.
Calculate the cross-sectional area of the pipe using the formula A = π * r^2, where r is the radius of the pipe.
Determine the flow rate (Q) of the fluid, which is typically measured in cubic meters per second (m^3/s) or liters per...
Entropy is a measure of disorder or randomness in a system, while enthalpy is a measure of the heat energy in a system.
Entropy is a thermodynamic property that measures the amount of energy in a system that is not available to do work.
Enthalpy is a thermodynamic property that measures the total heat content of a system.
Entropy increases in irreversible processes, while enthalpy remains constant.
Entropy is denoted by S,...
The Refrigeration Cycle graph shows the process of cooling a space by transferring heat from inside to outside.
The cycle starts with the refrigerant entering the compressor as a low-pressure gas.
The refrigerant is compressed, raising its temperature and pressure, before entering the condenser where it releases heat to the surroundings.
After losing heat, the refrigerant becomes a high-pressure liquid and flows into the ...
The vapor absorption cycle graph shows the relationship between pressure, temperature, and enthalpy during the process.
The graph typically shows pressure on the y-axis and temperature on the x-axis.
It includes lines representing the various stages of the cycle such as evaporation, absorption, and desorption.
The enthalpy values at different points in the cycle can also be plotted on the graph.
Example: The graph will sho...
The Rankine, Otto, and Diesel cycle graphs are commonly used in thermodynamics to analyze different types of heat engines.
The Rankine cycle is used in steam power plants and consists of four processes: heat addition, isentropic expansion, heat rejection, and isentropic compression.
The Otto cycle is used in spark-ignition engines and consists of four processes: isentropic compression, constant volume heat addition, isen...
I appeared for an interview in May 2025, where I was asked the following questions.
GA Extraction Drawing involves creating a General Arrangement drawing for piping systems, detailing layout and components.
Identify the scope of the project and gather relevant data.
Use CAD software to draft the layout, ensuring all components are represented.
Include dimensions, annotations, and references to other drawings.
Verify the drawing against project specifications and standards.
Example: For a chemical plant, en...
Resolving class support and piping involves ensuring proper alignment, load distribution, and compliance with design standards.
Identify the class of support required based on load and pipe size.
Use proper materials for supports to prevent corrosion and ensure durability.
Ensure that supports are placed at appropriate intervals to prevent sagging.
Consider thermal expansion and contraction when designing support locations...
Piping modeling using P&ID involves translating process diagrams into detailed piping designs.
P&ID (Piping and Instrumentation Diagram) provides a visual representation of the piping system.
It includes symbols for pipes, valves, pumps, and instrumentation, aiding in design clarity.
P&ID helps identify flow paths and equipment locations, ensuring accurate modeling.
For example, a P&ID may show a pump conne...
I applied via Campus Placement and was interviewed in Dec 2024. There was 1 interview round.
GD topic was "pros and cons of strat ups"
Everty member who gave GD was eligible for interview
They gave marks for every candidate
I applied via Campus Placement and was interviewed in Dec 2024. There were 4 interview rounds.
Electrical based and aptitude
About renewable and all were interactive
I appeared for an interview in Sep 2024.
Setting up a Project Workshare involves configuring shared resources and collaboration tools for team efficiency.
Define project scope and objectives to align team efforts.
Set up a shared workspace using tools like Autodesk BIM 360 or similar.
Establish user permissions and roles to control access to project files.
Create a project folder structure for organized file management.
Implement version control to track changes a...
Setting up data replication involves configuring source and target systems for synchronized data transfer.
Identify the source and target databases for replication.
Choose the replication method (e.g., snapshot, transactional, or merge).
Configure network settings to ensure connectivity between systems.
Set up replication agents or services on both source and target.
Test the replication process to ensure data consistency a...
Maintenance activities ensure systems run smoothly, involving regular checks, updates, and repairs to prevent issues.
Regular system backups to prevent data loss.
Software updates to enhance security and functionality.
Performance monitoring to identify and resolve bottlenecks.
Hardware inspections to ensure all components are functioning properly.
User access reviews to maintain security and compliance.
I applied via Campus Placement and was interviewed in Oct 2024. There were 3 interview rounds.
It was a one hour test including aptitute and subject matter questions
We were divided in groups of 14 people. GD went for around 15 mins and the topic was Russia ukraine war.
Rankine cycle is a thermodynamic cycle used in steam power plants to generate electricity.
Rankine cycle consists of four main components: a pump, a boiler, a turbine, and a condenser.
Water is pumped into the boiler where it is heated to create high pressure steam.
The high pressure steam is then fed into a turbine where it expands, producing mechanical work.
After exiting the turbine, the steam is condensed back into wat...
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
An HVAC system is a heating, ventilation, and air conditioning system that controls the temperature, humidity, and air quality in a building.
Consists of a furnace or boiler for heating
Includes a central air conditioner for cooling
Utilizes ductwork to distribute air throughout the building
May have a thermostat to control temperature settings
Can include air filters for improving indoor air quality
I applied via Approached by Company and was interviewed in Jul 2024. There was 1 interview round.
HRG stands for Human Resource Group while LRG stands for Large Retail Group.
HRG focuses on managing human resources within an organization
LRG focuses on managing a large retail business
HRG deals with employee relations, recruitment, training, and development
LRG deals with sales, inventory management, customer service, and marketing
Transformer sizing involves calculating the appropriate size of a transformer based on load requirements.
Determine the total load requirements in kVA
Consider the load factor and diversity factor
Calculate the transformer size based on the total load requirements
Ensure the transformer is rated for the appropriate voltage and frequency
Consult with a professional engineer if needed
Basics of Electrical engineering
General Topics Corona
A transformer is an electrical device that transfers electrical energy between circuits through electromagnetic induction.
Transforms voltage levels: Steps up or steps down voltage as needed.
Consists of primary and secondary coils: Energy is transferred between these coils.
Used in power distribution: Essential for transmitting electricity over long distances.
Example: A step-down transformer reduces high voltage from pow...
Fabrication method statement includes details on how a structure will be fabricated, while WPS (Welding Procedure Specification) outlines welding procedures.
Fabrication method statement details the step-by-step process of fabricating a structure
WPS specifies the welding procedures to be followed during fabrication
Both documents are crucial for ensuring quality and safety in the fabrication process
Some of the top questions asked at the Worley interview -
The duration of Worley interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 103 interview experiences
Difficulty level
Duration
based on 1.2k reviews
Rating in categories
Process Engineer
333
salaries
| ₹4 L/yr - ₹16 L/yr |
Deputy Manager
215
salaries
| ₹12 L/yr - ₹32.3 L/yr |
Piping Designer
176
salaries
| ₹4 L/yr - ₹16.3 L/yr |
Piping Design Engineer
166
salaries
| ₹3.8 L/yr - ₹17 L/yr |
Piping Engineer
161
salaries
| ₹4.5 L/yr - ₹18 L/yr |
Larsen & Toubro Limited
Tata Technologies
Tata Projects
Shapoorji Pallonji Group