Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Voltas Team. If you also belong to the team, you can get access from here

Voltas Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Voltas Senior MEP Engineer Interview Questions, Process, and Tips

Updated 25 Jul 2021

Voltas Senior MEP Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

5 Questions

  • Q1. Description of inergen system
  • Ans. 

    Inergen system is a fire suppression system that uses a mixture of gases to extinguish fires.

    • Uses a blend of nitrogen, argon, and carbon dioxide gases

    • Discharges the gas mixture into the protected area to reduce oxygen levels and extinguish the fire

    • Does not leave any residue or damage to the protected area

    • Commonly used in data centers, museums, and other areas with valuable assets

    • Requires regular maintenance and testing

  • Answered by AI
  • Q2. Which type of pipe use in Sewage system
  • Ans. 

    PVC and HDPE pipes are commonly used in sewage systems.

    • PVC pipes are lightweight and easy to install.

    • HDPE pipes are durable and resistant to corrosion.

    • Both types of pipes are cost-effective and have a long lifespan.

    • Other materials used in sewage systems include concrete, cast iron, and ductile iron pipes.

  • Answered by AI
  • Q3. Cpvc and upvc differences...
  • Ans. 

    CPVC and UPVC are both types of plastic pipes used for plumbing, but they differ in their composition and properties.

    • CPVC is made by chlorinating PVC resin, making it more heat-resistant and suitable for hot water applications.

    • UPVC is made from unplasticized PVC, making it more rigid and durable, but less heat-resistant.

    • CPVC is typically used for hot water supply lines, while UPVC is used for cold water supply lines an...

  • Answered by AI
  • Q4. How will calculate the Ducting sheet
  • Ans. 

    Ducting sheet calculation involves determining the size and shape of the ductwork required for a specific HVAC system.

    • Calculate the required air flow rate for the system

    • Determine the static pressure of the system

    • Select the appropriate duct size and shape based on the air flow rate and static pressure

    • Calculate the length of ductwork required for the system

    • Determine the number of fittings required for the system

    • Calculate...

  • Answered by AI
  • Q5. How you handle the client
  • Ans. 

    I handle clients by actively listening to their needs and concerns, providing clear communication, and delivering quality work.

    • Actively listen to client needs and concerns

    • Provide clear and timely communication

    • Deliver quality work that meets or exceeds client expectations

    • Maintain a positive and professional attitude

    • Address any issues or concerns promptly and effectively

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Each reply with confidence and politeness

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Campus Placement

Round 1 - Technical 

(4 Questions)

  • Q1. What makes ac to dc
  • Ans. 

    AC is converted to DC using a rectifier circuit.

    • AC to DC conversion is done using a rectifier circuit, which converts alternating current (AC) to direct current (DC).

    • Rectifier circuits can be half-wave or full-wave, depending on the type of rectification needed.

    • Examples of rectifier circuits include diode rectifiers, bridge rectifiers, and voltage multiplier circuits.

  • Answered by AI
  • Q2. What's materials used for earthing
  • Ans. 

    Materials commonly used for earthing include copper, galvanized steel, and conductive concrete.

    • Copper rods

    • Galvanized steel rods

    • Conductive concrete

    • Earthing strips

    • Earthing plates

  • Answered by AI
  • Q3. Full form of MCBA
  • Ans. 

    MCBA stands for Master of Construction Business Administration.

    • MCBA is a postgraduate degree program that focuses on the business aspects of the construction industry.

    • It covers topics such as project management, finance, marketing, and strategic planning.

    • Example: John completed his MCBA to advance his career in construction management.

  • Answered by AI
  • Q4. What is the standard earthing voltage
  • Ans. 

    The standard earthing voltage is typically 0 volts.

    • Standard earthing voltage is usually 0 volts to ensure safety in electrical systems

    • Earthing voltage can vary depending on the specific requirements of the system

    • Proper earthing helps to prevent electrical shocks and equipment damage

  • Answered by AI
Round 2 - One-on-one 

(2 Questions)

  • Q1. How long you can join
  • Q2. As early as possible

Interview Preparation Tips

Topics to prepare for Blue Star Site Engineer interview:
  • Electrical Engineering
  • Mechanical
  • HVAC Engineering
  • Air Conditioning
Interview preparation tips for other job seekers - Read construction Site related questions
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I was interviewed in Oct 2024.

Round 1 - Group Discussion 

Discussed about Previous Experience

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. What is your job role in the carrent company?
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Water treatment plant questions 1. What are the structures in water treatment plant?
  • Q2. What is their functions?
  • Ans. 

    The functions of a Civil Site Engineer include planning, designing, and overseeing construction projects.

    • Planning and designing construction projects

    • Overseeing construction activities and ensuring compliance with regulations

    • Preparing cost estimates and budgets

    • Collaborating with architects, contractors, and other professionals

    • Ensuring safety and quality standards are met

    • Managing project timelines and schedules

    • Conducting...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When you sitting at the front of interviewer. Keep mind calm, and throw the stress away, give answers that did you knows perfectly.

Skills evaluated in this interview

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Feb 2024.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Can you describe your experience in your previous company?
  • Q2. General HR round
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

It's a group discussion with project management's regarding my past experiences

Round 3 - One-on-one 

(2 Questions)

  • Q1. It's about my past experiences only ? Why manhole covers are round in shape?
  • Q2. Why manhole cover are round in shape
  • Ans. 

    Manhole covers are round in shape to prevent them from falling into the hole.

    • Round covers cannot fall into the hole as they cannot fit through diagonally.

    • Round covers can be easily rolled to move them from one place to another.

    • Round covers are easier to manufacture and install compared to other shapes.

    • Round covers are more aesthetically pleasing compared to other shapes.

    • Other shapes such as square or rectangular covers...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Blue Star Civil Site Engineer interview:
  • Regarding my past experiences
Interview preparation tips for other job seekers - Be confident what are u doing now and develop your skills

I applied via Recruitment Consulltant and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Metallurgy Basic Questions ( Fe - Fe3c dia., Mechanical Testing etc)
  • Q2. Manufacturing Processes in detail ( Process, Defects, Solutions for defects etc)
  • Ans. 

    Manufacturing processes involve various steps to produce a final product. Defects can occur during any stage, but solutions can be implemented to minimize them.

    • Manufacturing processes include casting, forging, machining, welding, etc.

    • Defects can occur due to improper material selection, poor design, incorrect processing, etc.

    • Solutions for defects include process optimization, quality control measures, and continuous im...

  • Answered by AI
  • Q3. Product Development related questions (FMEA, PPAP, Six Sigma tools, Project Charter, DVP&R)
Round 2 - One-on-one 

(3 Questions)

  • Q1. FMEA Related questions in detail
  • Q2. Patent related questions
  • Q3. Product development Strategy
  • Ans. 

    Product development strategy involves identifying customer needs, designing a product to meet those needs, and bringing it to market.

    • Conduct market research to identify customer needs and preferences

    • Develop a product that meets those needs and is unique from competitors

    • Create a plan for manufacturing and distribution

    • Test and refine the product before launch

    • Continuously gather feedback and make improvements

    • Examples: App...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Personal Information, Family Background
  • Q2. Past experience (Last company)
  • Ans. 

    I worked as a Senior Project Engineer at XYZ Corp.

    • Managed a team of 10 engineers to complete a project within the deadline

    • Developed and implemented new project management strategies resulting in a 20% increase in efficiency

    • Collaborated with cross-functional teams to ensure project success

    • Provided technical guidance and support to team members

    • Maintained project budgets and timelines

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Updating resume as per your experience is very important. Interviewer mostly asks questions about the our past experience and Projects.

Interview Questionnaire 

1 Question

  • Q1. How many type of pipe use in hvac
  • Ans. 

    There are several types of pipes used in HVAC systems.

    • Copper pipes: commonly used for refrigerant lines and water supply

    • PVC pipes: used for condensate drain lines

    • Galvanized steel pipes: used for ductwork and water supply

    • Flexible ducts: used for air distribution

    • PEX pipes: used for radiant heating systems

    • Stainless steel pipes: used for high-pressure applications

  • Answered by AI

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. Canon printers hommany typs

Interview Preparation Tips

Interview preparation tips for other job seekers - Best printers good work super fast meshine bst working no heat

Voltas Interview FAQs

What are the top questions asked in Voltas Senior MEP Engineer interview?

Some of the top questions asked at the Voltas Senior MEP Engineer interview -

  1. Which type of pipe use in Sewage syst...read more
  2. How will calculate the Ducting she...read more
  3. How you handle the clie...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
Dell Interview Questions
4.0
 • 391 Interviews
HARMAN Interview Questions
3.8
 • 257 Interviews
Thermax Limited Interview Questions
4.2
 • 243 Interviews
OPPO Interview Questions
4.0
 • 210 Interviews
LG Electronics Interview Questions
4.0
 • 192 Interviews
Vivo Interview Questions
4.1
 • 191 Interviews
Blue Star Interview Questions
4.0
 • 158 Interviews
Philips Interview Questions
3.9
 • 157 Interviews
View all
Voltas Senior MEP Engineer Salary
based on 8 salaries
₹5.4 L/yr - ₹10 L/yr
6% more than the average Senior MEP Engineer Salary in India
View more details

Voltas Senior MEP Engineer Reviews and Ratings

based on 2 reviews

2.5/5

Rating in categories

3.5

Skill development

3.5

Work-life balance

1.3

Salary

5.0

Job security

1.8

Company culture

1.5

Promotions

3.3

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
462 salaries
unlock blur

₹4.4 L/yr - ₹16.7 L/yr

Service Engineer
215 salaries
unlock blur

₹1.8 L/yr - ₹9 L/yr

AC Technician
190 salaries
unlock blur

₹1 L/yr - ₹6.1 L/yr

Safety Officer
154 salaries
unlock blur

₹2.8 L/yr - ₹7 L/yr

Senior Engineer
145 salaries
unlock blur

₹3.5 L/yr - ₹9.2 L/yr

Explore more salaries
Compare Voltas with

Blue Star

4.0
Compare

Thermax Limited

4.2
Compare

Kirloskar Brothers

3.9
Compare

Johnson Controls Hitachi Air Conditioning

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview