Upload Button Icon Add office photos

Vindhya Telelinks

Compare button icon Compare button icon Compare

Filter interviews by

Vindhya Telelinks Interview Questions, Process, and Tips

Updated 9 Feb 2025

Top Vindhya Telelinks Interview Questions and Answers

View all 30 questions

Vindhya Telelinks Interview Experiences

Popular Designations

37 interviews found

Interview experience
1
Bad
Difficulty level
Hard
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in May 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Resume related questions
Round 3 - One-on-one 

(1 Question)

  • Q1. General discussion
Round 4 - HR 

(1 Question)

  • Q1. Salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not good company

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Basic question like it, are you relocate, why you leaving your current job
Round 3 - Technical 

(1 Question)

  • Q1. Site execution, client billing, client corresponding

Interview Preparation Tips

Topics to prepare for Vindhya Telelinks Assistant Project Manager interview:
  • Execution work
  • Client Billing
Interview preparation tips for other job seekers - Strong site execution knowledge,

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)
Vindhya Telelinks Interview Questions and Answers for Freshers
illustration image

Deputy Manager Interview Questions & Answers

user image shubham srivastava

posted on 25 Sep 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Group Discussion 

About work and job, experience , salary

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boq of 1 KM 11 kV line.
  • Q2. Boq of 1 km LT line
  • Ans. 

    BOQ of 1 km LT line is a document that lists all the items required for the construction of a 1 km low tension line.

    • BOQ stands for Bill of Quantities

    • The BOQ includes details of materials, quantities, and prices

    • The BOQ helps in estimating the total cost of the project

    • Example items in the BOQ for a 1 km LT line: conductor, insulators, poles, transformers, hardware fittings, etc.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basics of site. 11 KV, LT, Distribution Transformer

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (57)

Vindhya Telelinks interview questions for popular designations

 Assistant Manager

 (5)

 Deputy Manager

 (5)

 Senior Engineer

 (4)

 Assistant Project Manager

 (3)

 Store Executive

 (2)

 Project Engineer

 (2)

 Assistant Engineer

 (1)

 Project Manager

 (1)

Store Keeper Interview Questions & Answers

user image Anonymous

posted on 4 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Aptitude Test 

Old company ki jankari position work

Round 3 - HR 

(1 Question)

  • Q1. Salary kya chahiye old company me kya thi

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good company vtl

Store Keeper Interview Questions asked at other Companies

Q1. What is the process of material receiving??
View answer (4)

Get interview-ready with Top Vindhya Telelinks Interview Questions

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. What is EFL. What is OFC
  • Ans. 

    EFL stands for English as a Foreign Language. OFC stands for Optical Fiber Cable.

    • EFL refers to the teaching or learning of English in a non-English speaking country.

    • OFC is a type of cable made of thin strands of glass or plastic that transmit data using light.

    • OFC is commonly used for high-speed internet and telecommunications.

    • EFL is often taught in language schools or universities to non-native speakers.

    • EFL teachers ma...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Job package Requirements

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare for OFC process realeted questions and about it.

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (8)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Execution of sub station
  • Ans. 

    Execution of sub station involves planning, coordination, and management of construction activities for the substation.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with various stakeholders including engineers, contractors, and utility companies

    • Ensure compliance with safety regulations and quality standards

    • Monitor progress and address any issues that may arise during cons...

  • Answered by AI
  • Q2. BOQ of HT and LT lines
  • Ans. 

    BOQ of HT and LT lines refers to the Bill of Quantities for High Tension and Low Tension electrical lines in a construction project.

    • BOQ includes detailed itemized list of materials, labor, and equipment needed for the construction of HT and LT lines.

    • BOQ helps in estimating the total cost of the project and ensures accurate budgeting.

    • Examples of items in BOQ for HT and LT lines include conductors, insulators, transforme...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Details of project completed
Round 3 - HR 

(1 Question)

  • Q1. Discussion of CTC

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear own basics in which you are experiencing.
Don't provide any loose information that you really don't know.

Construction Management Interview Questions asked at other Companies

Q1. What are the different issues(technical & administrative) faced during the execution of works and how you solved them?
View answer (2)

I applied via Approached by Company and was interviewed in Jun 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Water Division related on question with planning and billing. They enquiry related to project deep and deep and asking about the fix the issue.
  • Q2. Filter house methodology and construction related.

Interview Preparation Tips

Interview preparation tips for other job seekers - If they need hire you otherwise they egnor you after round of round interview happen.
One step HR and then 2-3step of technical round related to current project.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (88)

I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(3 Questions)

  • Q1. About the work what I have mentioned in cv
  • Q2. About management systems of project
  • Q3. Billing process of clients
  • Ans. 

    The billing process of clients involves invoicing for services rendered and collecting payment.

    • Invoicing should be done promptly and accurately

    • Payment terms should be clearly communicated to clients

    • Follow up with clients on overdue payments

    • Maintain accurate records of billing and payments

    • Consider offering payment options such as online payments or payment plans

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Employee should to know about the work in detail whatever they mentioned in resume.

And also about the details of management systems

Deputy Manager Project Management Interview Questions asked at other Companies

Q1. What is the Fe 500 grade steel with graph analysis.
View answer (1)

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Interview based on your department. Question will be asked as per your job profile. Excel
Round 3 - HR 

(1 Question)

  • Q1. There will be only salary discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are ready for salary negotiation then keep try.

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (69)
Contribute & help others!
anonymous
You can choose to be anonymous

Vindhya Telelinks Interview FAQs

How many rounds are there in Vindhya Telelinks interview?
Vindhya Telelinks interview process usually has 2-3 rounds. The most common rounds in the Vindhya Telelinks interview process are Technical, HR and Resume Shortlist.
How to prepare for Vindhya Telelinks interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Vindhya Telelinks. The most common topics and skills that interviewers at Vindhya Telelinks expect are Pipeline, Water Supply, Accounting, Civil Construction and Electrical Power Distribution.
What are the top questions asked in Vindhya Telelinks interview?

Some of the top questions asked at the Vindhya Telelinks interview -

  1. Bill of material of 1KM underground line 33 KV ,11,KV,LT lin...read more
  2. Bill of material of 1 KM 11 KV li...read more
  3. What is the bending radius of EHV cabl...read more
How long is the Vindhya Telelinks interview process?

The duration of Vindhya Telelinks interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

SALARIES

Vindhya Telelinks

INTERVIEWS

Nagarro

No Interviews

INTERVIEWS

Nagarro

No Interviews

SALARIES

Incture Technologies

SALARIES

Vindhya Telelinks

SALARIES

SunTec Business Solutions

SALARIES

Meghmani Industries

JOBS

Aarti Industries

No Jobs

SALARIES

Incture Technologies

Tell us how to improve this page.

Vindhya Telelinks Interview Process

based on 47 interviews

Interview experience

4.1
  
Good
View more

Interview Questions from Similar Companies

Polycab Wires Interview Questions
4.0
 • 94 Interviews
KEI Industries Interview Questions
4.2
 • 53 Interviews
Apar Industries Interview Questions
4.1
 • 42 Interviews
Finolex Cables Interview Questions
3.8
 • 40 Interviews
Aksh Optifibre Interview Questions
3.6
 • 5 Interviews
Birla Cable Interview Questions
4.2
 • 2 Interviews
Cmind Interview Questions
3.9
 • 2 Interviews
View all

Vindhya Telelinks Reviews and Ratings

based on 464 reviews

4.0/5

Rating in categories

3.5

Skill development

3.9

Work-life balance

3.9

Salary

3.9

Job security

3.7

Company culture

3.4

Promotions

3.7

Work satisfaction

Explore 464 Reviews and Ratings
Project Engineer
187 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
146 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
129 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
56 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
49 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Vindhya Telelinks with

Sterlite Technologies

3.8
Compare

Finolex Cables

3.8
Compare

Polycab Wires

4.0
Compare

KEI Industries

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview