Slump for pumping refers to the decrease in concrete workability due to the pumping process.
Slump for pumping is the reduction in the workability of concrete caused by the pressure and friction during pumping.
It is important to adjust the mix design to account for the slump loss during pumping.
Factors such as distance, height, and diameter of the pumping line can affect the slump for pumping.
Using additives like superp...
The size of cube mould refers to the dimensions of the cube used for testing concrete strength.
Cube moulds are typically made of steel or plastic.
The most common size for cube moulds used in concrete testing is 150mm x 150mm x 150mm.
Other sizes such as 100mm x 100mm x 100mm or 200mm x 200mm x 200mm may also be used depending on the testing requirements.
Top trending discussions
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
posted on 21 Nov 2024
I applied via Naukri.com and was interviewed in May 2024. There were 4 interview rounds.
Workability of different works refers to the feasibility and effectiveness of various tasks or projects.
Consider the resources required for each work
Evaluate the timeline and deadlines for completion
Assess the skills and expertise needed for each task
Prioritize tasks based on importance and impact
Adapt to changes and challenges in the project
The methodology of finishing works involves the process of completing the final touches and details of a project.
Develop a detailed plan outlining the sequence of finishing tasks
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Conduct quality inspections to ensure work meets project specifications
Address any punch list items to ensure project completion
Document all finishing work for f
Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.
Involves designing and planning infrastructure projects
Includes construction and maintenance of buildings, roads, bridges, and dams
Focuses on ensuring structures are safe, functional, and sustainable
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.
USG
CertainTeed
Georgia-Pacific
Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
Fire alarms are installed throughout the building to alert occupants of a fire emergency.
Sprinkler systems automatically activate to extinguish fires in the early stages.
Fire extinguishers are strategically placed on each floor for manual fire suppression.
Fire hoses are available on each floor for trai...
Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.
Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.
It involves setting up aluminum formwork panels that are easily assembled and dismantled.
Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.
The use of Mivan shutte...
The mix used for marble flooring typically consists of marble chips, cement, sand, and water.
Marble chips are the main component for marble flooring mix
Cement is used as a binding agent
Sand is added for strength and durability
Water is used to create a workable mixture
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Senior Engineer
14
salaries
| ₹5.3 L/yr - ₹7.8 L/yr |
Assistant Manager
12
salaries
| ₹4.2 L/yr - ₹9 L/yr |
Executive Accountant
11
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Junior Engineer
11
salaries
| ₹2.3 L/yr - ₹5 L/yr |
Deputy Project Manager
8
salaries
| ₹8.2 L/yr - ₹10.8 L/yr |
Prestige Group
Sobha
Brigade Group
Godrej Properties