Upload Button Icon Add office photos

Filter interviews by

Sheth Creators Assistant Project Manager Interview Questions and Answers

Updated 21 Nov 2024

Sheth Creators Assistant Project Manager Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in May 2024. There were 4 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Experience and designation
  • Q2. Work culture and education
Round 2 - One-on-one 

(5 Questions)

  • Q1. Previous experience information and role
  • Q2. Building finishing detail knowledge
  • Q3. Manpower utilisation & scheduling
  • Q4. Workbality of different works
  • Ans. 

    Workability of different works refers to the feasibility and effectiveness of various tasks or projects.

    • Consider the resources required for each work

    • Evaluate the timeline and deadlines for completion

    • Assess the skills and expertise needed for each task

    • Prioritize tasks based on importance and impact

    • Adapt to changes and challenges in the project

  • Answered by AI
  • Q5. Case study of project completion
Round 3 - Technical 

(1 Question)

  • Q1. Methodology of finishing works
  • Ans. 

    The methodology of finishing works involves the process of completing the final touches and details of a project.

    • Develop a detailed plan outlining the sequence of finishing tasks

    • Coordinate with subcontractors and suppliers to ensure timely delivery of materials

    • Conduct quality inspections to ensure work meets project specifications

    • Address any punch list items to ensure project completion

    • Document all finishing work for f

  • Answered by AI
Round 4 - Technical 

(2 Questions)

  • Q1. Basic definition of civil engineering
  • Ans. 

    Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.

    • Involves designing and planning infrastructure projects

    • Includes construction and maintenance of buildings, roads, bridges, and dams

    • Focuses on ensuring structures are safe, functional, and sustainable

  • Answered by AI
  • Q2. Expectations from company

Interview Preparation Tips

Interview preparation tips for other job seekers - Bank Statement of three month,three Salary slip, education certificates, previous experience letter and appointment letter required

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. The question was regarding the present role I'm assigned and how the implementation of scheduling tools can help planning of E.P.C. in their present business unit.
  • Q2. Technical question on my present project scheduling role & any other digital concept i'm associated with it currently.

Interview Preparation Tips

Round: Resume Shortlist
Experience: These days, not many companies shortlists the candidates by themselves instead they hire third parties in order to minimize the resources and cost burden. These talent acquisition members initially filters the resumes based upon the Years of Experience & the key skills which they receive from their parent companies by matching with the 70-80 % kind of similar roles of the candidates.

In my case, both my experience & roles are perfectly in sync with their requirements. So, they contacted me via naukri.com and asked me to share the updated resume & within a week I got the confirmation of my resume shortlisting & date for the 1st round of interview.

Round: Test
Experience: Primavera Scheduling Test

I was interviewed before Mar 2020.

Interview Questionnaire 

2 Questions

  • Q1. Technical
  • Q2. Family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Same

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. It asks your old experience based questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview Basicaly depends on your Luck. What he asked, if you answere, then you are selected, and not answering then you are rejected.

I applied via Recruitment Consultant and was interviewed before Nov 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Three people seat and asked Just simple technical questions frequently from civil engineering in hindi & English and watched the confidence level also. Some difficult questions is also there but they have ...
  • Q2. Forget now because long years ago it has been done.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident & should have technical knowledge.

I applied via Referral and was interviewed before Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Basics of fabrication and Erection methods
  • Q2. Regarding Safety
  • Q3. Resources management
  • Q4. Project planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Cool and prepared for all technical

I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Be clear on salary negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Say confidently what ever it is..

Interview Questionnaire 

1 Question

  • Q1. If your Experience person , mostly they ask your past experience work related question , If Fresher they ask theoretical question

Sheth Creators Interview FAQs

How many rounds are there in Sheth Creators Assistant Project Manager interview?
Sheth Creators interview process usually has 4 rounds. The most common rounds in the Sheth Creators interview process are Technical, HR and One-on-one Round.
What are the top questions asked in Sheth Creators Assistant Project Manager interview?

Some of the top questions asked at the Sheth Creators Assistant Project Manager interview -

  1. Basic definition of civil engineer...read more
  2. Workbality of different wo...read more
  3. Methodology of finishing wo...read more

Tell us how to improve this page.

Sheth Creators Assistant Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
DRA Homes Interview Questions
4.6
 • 23 Interviews
JP Infra Interview Questions
3.8
 • 19 Interviews
N.K. Realtors Interview Questions
4.2
 • 19 Interviews
View all
Sheth Creators Assistant Project Manager Salary
based on 5 salaries
₹7.8 L/yr - ₹13 L/yr
13% more than the average Assistant Project Manager Salary in India
View more details
Assistant Manager
33 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Junior Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
18 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
17 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Sheth Creators with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

DLF

3.9
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview