I applied via Naukri.com and was interviewed in May 2024. There were 4 interview rounds.
Workability of different works refers to the feasibility and effectiveness of various tasks or projects.
Consider the resources required for each work
Evaluate the timeline and deadlines for completion
Assess the skills and expertise needed for each task
Prioritize tasks based on importance and impact
Adapt to changes and challenges in the project
The methodology of finishing works involves the process of completing the final touches and details of a project.
Develop a detailed plan outlining the sequence of finishing tasks
Coordinate with subcontractors and suppliers to ensure timely delivery of materials
Conduct quality inspections to ensure work meets project specifications
Address any punch list items to ensure project completion
Document all finishing work for f
Civil engineering involves designing, constructing, and maintaining infrastructure such as buildings, roads, bridges, and dams.
Involves designing and planning infrastructure projects
Includes construction and maintenance of buildings, roads, bridges, and dams
Focuses on ensuring structures are safe, functional, and sustainable
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
I applied via Walk-in and was interviewed before Sep 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed before Jun 2020. There were 4 interview rounds.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.
Cement density: 1440 kg/m3
Steel density: 7850 kg/m3
Fine aggregate density: 1600-1750 kg/m3
Coarse aggregate density: 1200-1750 kg/m3
The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.
Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm
Weight of the cube is usually around 29 kg
The cube is made of concrete from the same batch being tested
The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.
The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).
The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).
However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...
My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.
Continuously seek opportunities to learn and improve technical skills
Work on various projects to gain practical experience
Seek mentorship from experienced engineers
Stay updated with industry trends and technologies
Obtain relevant certifications to enhance credibility
Set specific career milestones to track progress
I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.
Leading and managing multiple projects simultaneously
Mentoring and training junior engineers
Implementing innovative technologies and practices
Collaborating with cross-functional teams for successful project delivery
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The joining period and percentage of salary hike are important factors to consider when accepting a new job offer.
The joining period should be negotiated based on the candidate's current commitments and the urgency of the role.
The percentage of salary hike should be competitive with industry standards and reflective of the candidate's experience and skills.
It is important to consider the overall compensation package, i...
I appeared for an interview before Feb 2024.
I was responsible for overseeing daily operations, managing staff, and ensuring targets were met.
Managed a team of employees
Created and implemented strategies to meet company goals
Monitored performance and provided feedback to staff
Handled customer complaints and resolved issues
Collaborated with other departments to improve processes
I have 5 years of experience in retail management, including overseeing staff, inventory management, and customer service.
Managed a team of 15 retail staff members
Implemented inventory control measures to reduce shrinkage
Provided excellent customer service to ensure high satisfaction levels
Trained new employees on company policies and procedures
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
32
salaries
| ₹5 L/yr - ₹9.4 L/yr |
Senior Engineer
18
salaries
| ₹6 L/yr - ₹9.8 L/yr |
Junior Engineer
18
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Site Engineer
18
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Executive
17
salaries
| ₹1.9 L/yr - ₹5.2 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
HM Group