Interview Questionnaire 

4 Questions

  • Q1. RCC and finishing related questions asked by Management
  • Q2. Also quality and documentation related questions asked by Management
  • Q3. Your current salary and more expection
  • Q4. Notice period

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all shuttering and steel related questions and IS code proper steady.
Prepare about your self and experience previous companies

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Share about yourself,
  • Q2. What are the gypsum brands
  • Ans. 

    Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.

    • USG

    • CertainTeed

    • Georgia-Pacific

  • Answered by AI
  • Q3. Explain fire fighting syatem in highrise buildings
  • Ans. 

    Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.

    • Fire alarms are installed throughout the building to alert occupants of a fire emergency.

    • Sprinkler systems automatically activate to extinguish fires in the early stages.

    • Fire extinguishers are strategically placed on each floor for manual fire suppression.

    • Fire hoses are available on each floor for trai...

  • Answered by AI
  • Q4. Is mivan shuttering used before
  • Ans. 

    Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.

    • Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.

    • It involves setting up aluminum formwork panels that are easily assembled and dismantled.

    • Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.

    • The use of Mivan shutte...

  • Answered by AI
  • Q5. What mix is used for marble flooring
  • Ans. 

    The mix used for marble flooring typically consists of marble chips, cement, sand, and water.

    • Marble chips are the main component for marble flooring mix

    • Cement is used as a binding agent

    • Sand is added for strength and durability

    • Water is used to create a workable mixture

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through with basic study of all department.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. S.L.D of Electrical scheme
  • Ans. 

    S.L.D stands for Single Line Diagram of an electrical scheme.

    • S.L.D is a simplified diagram that shows the electrical connections and components in a system.

    • It typically includes power sources, distribution lines, transformers, circuit breakers, and loads.

    • S.L.D helps in understanding the overall layout of the electrical system and how components are connected.

    • It is used for planning, designing, and troubleshooting elect...

  • Answered by AI
  • Q2. Why use capacitor panel use
  • Ans. 

    Capacitor panels are used to improve power factor and reduce electricity costs.

    • Improves power factor by reducing reactive power consumption

    • Helps in reducing electricity costs by avoiding penalties for low power factor

    • Increases efficiency of electrical systems

    • Used in industries, commercial buildings, and large facilities

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Explain Pile foundation DMC Method
  • Ans. 

    DMC method is a pile foundation technique that involves driving piles into the ground using a drop hammer.

    • DMC stands for Drop Hammer Compaction method.

    • It is a commonly used technique in civil engineering for constructing pile foundations.

    • In this method, a pile is driven into the ground using a drop hammer, which is lifted and then dropped onto the pile.

    • The repeated impact of the drop hammer compacts the soil around the...

  • Answered by AI
  • Q2. Explain the Methodology for Waterproofing
  • Ans. 

    Waterproofing methodology involves various techniques to prevent water penetration and damage to structures.

    • Identify the source of water leakage or potential areas of water penetration

    • Select appropriate waterproofing materials based on the type of structure and water exposure

    • Prepare the surface by cleaning and repairing any cracks or damages

    • Apply waterproofing membranes or coatings to create a barrier against water

    • Ensu...

  • Answered by AI
  • Q3. Explain the Cement & Steel Consumption for Slab
  • Ans. 

    Cement and steel consumption for slab depends on the design, dimensions, and load requirements.

    • Cement consumption is determined by the thickness of the slab and the mix design.

    • Steel consumption is influenced by the span, load capacity, and reinforcement requirements.

    • For example, a 100mm thick slab may require around 0.5 cubic meters of cement per square meter.

    • Steel consumption can vary from 0.5% to 2% of the total slab...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary Expectation
  • Q2. Notice Period and joining date

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Interview Preparation Tips

Topics to prepare for Rajapushpa Properties Project Manager Civil interview:
  • Civil Construction
  • Bilding
  • Quality Control
  • Shutaring
Interview preparation tips for other job seekers - Hardworking out put verry happy

I applied via Company Website and was interviewed in Jan 2022. There was 1 interview round.

Round 1 - Technical 

Interview Preparation Tips

Interview preparation tips for other job seekers - Project management planning and meterial mobilation co ordinate structural engineer, manpower

I applied via Referral and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(8 Questions)

  • Q1. What type of ERP you handled till date?
  • Ans. 

    I have handled multiple ERP systems including SAP, Oracle, and Microsoft Dynamics.

    • I have experience with SAP ERP, which is widely used in large organizations for managing various business processes.

    • I have also worked with Oracle ERP, which offers a comprehensive suite of applications for finance, supply chain, and human resources management.

    • I am familiar with Microsoft Dynamics ERP, which is known for its user-friendly...

  • Answered by AI
  • Q2. What were the modules?
  • Ans. 

    The modules were different components of the project that were developed separately.

    • The modules included a user interface module, a database module, and a reporting module.

    • Each module had its own team responsible for its development.

    • The modules were integrated together during the testing phase.

    • The project was divided into modules to ensure efficient development and easier maintenance.

  • Answered by AI
  • Q3. What is your understanding about Real Estate environment?
  • Ans. 

    Real Estate environment refers to the economic, legal, and physical factors that affect the buying, selling, and development of property.

    • Includes factors such as zoning laws, property taxes, and market trends

    • Involves various stakeholders such as buyers, sellers, agents, and developers

    • Can be influenced by macroeconomic factors such as interest rates and inflation

    • Examples of real estate projects include residential devel...

  • Answered by AI
  • Q4. How to manage project procurement and supply?
  • Ans. 

    Project procurement and supply can be managed by following a structured process that includes planning, sourcing, contracting, and monitoring.

    • Develop a procurement plan that outlines the procurement process and identifies the goods and services required for the project

    • Identify potential suppliers and evaluate their capabilities and suitability for the project

    • Negotiate contracts that clearly define the scope of work, de...

  • Answered by AI
  • Q5. How to manage project management?
  • Ans. 

    Project management can be managed through effective planning, communication, and monitoring.

    • Create a detailed project plan with clear objectives and timelines

    • Communicate regularly with team members and stakeholders to ensure everyone is on the same page

    • Monitor progress and adjust the plan as needed to stay on track

    • Use project management tools and software to streamline processes

    • Delegate tasks and responsibilities to te...

  • Answered by AI
  • Q6. How to manage Work Order against an order?
  • Ans. 

    Work orders should be tracked and managed against the original order to ensure timely completion and accurate billing.

    • Create a system for assigning and tracking work orders

    • Ensure work orders are properly documented and communicated to relevant parties

    • Regularly review progress and adjust timelines as needed

    • Ensure accurate billing by tracking work order completion and comparing to original order

    • Use technology such as pro...

  • Answered by AI
  • Q7. How liaison works in ERP?
  • Ans. 

    Liaison in ERP involves communication and coordination between different departments and stakeholders to ensure smooth implementation and functioning of the system.

    • Liaison involves identifying key stakeholders and their roles in the ERP implementation process

    • It also involves establishing communication channels and protocols for sharing information and updates

    • Liaison helps to ensure that all departments are aligned with...

  • Answered by AI
  • Q8. Have you worked on Data Migration project directly?
  • Ans. 

    Yes, I have worked on multiple data migration projects.

    • Managed data migration from legacy systems to new platforms

    • Developed data mapping and transformation strategies

    • Ensured data accuracy and completeness through testing and validation

    • Collaborated with cross-functional teams to identify and resolve data issues

    • Examples: migrated customer data from Salesforce to HubSpot, migrated financial data from QuickBooks to SAP

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - It's OK OK organization. A technical person cannot look for a long term association in clear way.

Skills evaluated in this interview

Sheth Creators Interview FAQs

What are the top questions asked in Sheth Creators Project Executive Engineer interview?

Some of the top questions asked at the Sheth Creators Project Executive Engineer interview -

  1. RCC and finishing related questions asked by Manageme...read more
  2. Also quality and documentation related questions asked by Managem...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 73 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
DRA Homes Interview Questions
4.6
 • 22 Interviews
JP Infra Interview Questions
3.8
 • 18 Interviews
View all
Assistant Manager
29 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Senior Engineer
19 salaries
unlock blur

₹6 L/yr - ₹9.8 L/yr

Junior Engineer
18 salaries
unlock blur

₹2.5 L/yr - ₹3.7 L/yr

Site Engineer
18 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Executive
17 salaries
unlock blur

₹1.9 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Sheth Creators with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

DLF

4.0
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview