Sheth Creators Site Execution Engineer Interview Questions and Answers

Updated 23 Aug 2023

Sheth Creators Site Execution Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Where have you worked before?
Round 3 - HR 

(1 Question)

  • Q1. What you disliked about your previous company?

Interview questions from similar companies

Site Engineer Interview Questions & Answers

DRA Homes user image Nishanth Ganesan Velu

posted on 31 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(3 Questions)

  • Q1. Density of common material like cement, steel, fine and coarse aggregate
  • Ans. 

    Density of common construction materials varies, with cement around 1440 kg/m3, steel around 7850 kg/m3, fine aggregate around 1600-1750 kg/m3, and coarse aggregate around 1200-1750 kg/m3.

    • Cement density: 1440 kg/m3

    • Steel density: 7850 kg/m3

    • Fine aggregate density: 1600-1750 kg/m3

    • Coarse aggregate density: 1200-1750 kg/m3

  • Answered by AI
  • Q2. Weight of the cube which is made to check the strength of concrete
  • Ans. 

    The weight of the cube used to check the strength of concrete is typically 15 cm x 15 cm x 15 cm and weighs around 29 kg.

    • Standard size of cube for testing concrete strength is 15 cm x 15 cm x 15 cm

    • Weight of the cube is usually around 29 kg

    • The cube is made of concrete from the same batch being tested

  • Answered by AI
  • Q3. Ratio of cement mortar for outer and inner wall plastering
  • Ans. 

    The ratio of cement mortar for outer and inner wall plastering varies depending on the type of wall and desired finish.

    • The ratio of cement mortar for outer wall plastering is usually 1:4 (1 part cement to 4 parts sand).

    • The ratio of cement mortar for inner wall plastering is typically 1:6 (1 part cement to 6 parts sand).

    • However, the ratio can vary based on factors such as the type of wall surface, desired finish, and lo...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your goal and do you know how to achieve?
  • Ans. 

    My goal is to become a proficient Site Engineer by gaining experience, knowledge, and skills in the field.

    • Continuously seek opportunities to learn and improve technical skills

    • Work on various projects to gain practical experience

    • Seek mentorship from experienced engineers

    • Stay updated with industry trends and technologies

    • Obtain relevant certifications to enhance credibility

    • Set specific career milestones to track progress

  • Answered by AI
  • Q2. After 5 to 6 years, what is your position in your field ?
  • Ans. 

    I envision myself as a Senior Site Engineer leading projects and mentoring junior engineers.

    • Leading and managing multiple projects simultaneously

    • Mentoring and training junior engineers

    • Implementing innovative technologies and practices

    • Collaborating with cross-functional teams for successful project delivery

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be strong on what you know and have to know something about advancement in your field
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. Qualifications and experience shering me

Interview Preparation Tips

Interview preparation tips for other job seekers - I like their job and rule
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. HR asked about me
Round 3 - Technical 

(2 Questions)

  • Q1. What are the responsibilities of an site engineer??
  • Ans. 

    Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.

    • Managing construction projects from start to finish

    • Supervising and coordinating construction workers

    • Ensuring safety regulations and building codes are followed

    • Collaborating with architects, engineers, and subcontractors

    • Preparing and presenting progre

  • Answered by AI
  • Q2. Execution's & Reduce wastage

Interview Preparation Tips

Interview preparation tips for other job seekers - Telling the truth and keeping confidence.
Interview experience
4
Good
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before May 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Qas asked some questions from profit and loss and trigonometry.

Round 2 - One-on-one 

(6 Questions)

  • Q1. The difference between opc and ppc
  • Ans. 

    OPC is Ordinary Portland Cement, while PPC is Portland Pozzolana Cement. The main difference is the materials used in their production.

    • OPC is made from limestone and clay, while PPC is made from a mixture of pozzolanic material like fly ash, volcanic ash, etc.

    • PPC is more environmentally friendly as it uses industrial by-products, reducing the carbon footprint.

    • PPC has better workability and is more resistant to chemical...

  • Answered by AI
  • Q2. The grade of steel currently in usage and their types
  • Ans. 

    Different grades of steel are used for different applications, such as construction, automotive, and manufacturing.

    • Common grades of steel include A36, A572, and A500 for construction purposes.

    • High-strength low-alloy (HSLA) steels like A588 and A709 are used in structural applications.

    • Tool steels like D2 and O1 are used for cutting and shaping materials.

    • Stainless steels like 304 and 316 are corrosion-resistant and used ...

  • Answered by AI
  • Q3. The setting time of concrete
  • Ans. 

    Setting time of concrete refers to the time it takes for the concrete to harden and become solid.

    • Setting time can vary based on factors like temperature, humidity, and mix design.

    • Setting time is important for construction projects to ensure proper curing and strength development.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to adjus

  • Answered by AI
  • Q4. Volume of 1 bag of cement and 1 cube
  • Ans. 

    The volume of 1 bag of cement and 1 cube can vary depending on the size and density of the materials.

    • The volume of 1 bag of cement is typically around 0.035 cubic meters or 35 liters.

    • The volume of 1 cube can vary depending on the size, but a standard cube may have a volume of 1 cubic meter.

    • It's important to consider the density of the materials when calculating volume.

  • Answered by AI
  • Q5. Whats the use of fly ash in concrete
  • Ans. 

    Fly ash is used in concrete as a replacement for Portland cement to improve workability, reduce permeability, increase durability, and decrease cost.

    • Improves workability by reducing water demand

    • Reduces permeability and increases durability

    • Decreases cost by replacing some of the Portland cement

    • Can improve the long-term strength of concrete

    • Helps in reducing greenhouse gas emissions

  • Answered by AI
  • Q6. Whats hoop strees and punching failure
  • Ans. 

    Hoop stress is the stress exerted circumferentially in a cylindrical pressure vessel, while punching failure is a type of failure that occurs in structural elements subjected to concentrated loads.

    • Hoop stress is calculated using the formula: σ = PD/2t, where P is the internal pressure, D is the diameter, and t is the thickness of the vessel.

    • Punching failure occurs when a concentrated load is applied to a structural ele...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be positive and answer only those questions which you know correctly.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Some technical questions
  • Q2. Why tiles are layed following the arrows behind the tiles
  • Ans. 

    Tiles are laid following the arrows behind them to ensure proper alignment and pattern continuity.

    • Arrows indicate the direction in which the pattern on the tiles should be aligned.

    • Following the arrows helps maintain consistency in the pattern layout.

    • It ensures that the tiles are installed in the correct orientation for a visually appealing finish.

  • Answered by AI
  • Q3. How the tiles are layed and leveled
  • Ans. 

    Tiles are laid by spreading adhesive on the surface and then placing the tiles in a desired pattern. They are leveled using a spirit level to ensure a flat surface.

    • Spread adhesive on the surface evenly

    • Place tiles in desired pattern, starting from the center and working outwards

    • Use a spirit level to ensure tiles are level and flat

    • Make adjustments as needed to maintain levelness

    • Allow adhesive to dry before grouting the t

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Salary expectations

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be well bergainer about salary expectations

Interview Questionnaire 

2 Questions

  • Q1. About real estate
  • Q2. Work pressure

Interview Preparation Tips

Interview preparation tips for other job seekers - Not bad prearersdd fif the confining c.

I applied via Company Website and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. ONLY ABOUT SITE WORKS.

Interview Preparation Tips

Interview preparation tips for other job seekers - Only SITE work Related qs .
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Self introduction and my career details
  • Q2. Its about my previous company details
Round 2 - Technical 

(1 Question)

  • Q1. It's all about my experience based technical questions

I applied via Referral and was interviewed in Jan 2021. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Civil structural, finishing and mep. These subjects have to be known.

Interview Preparation Tips

Interview preparation tips for other job seekers - Not only civil any specialization, you have to know civil structural, finishing in details, electrical, plumbing, land scaping all things. Have Knowledge everything.

Sheth Creators Interview FAQs

How many rounds are there in Sheth Creators Site Execution Engineer interview?
Sheth Creators interview process usually has 3 rounds. The most common rounds in the Sheth Creators interview process are Resume Shortlist, Technical and HR.

Tell us how to improve this page.

Sheth Creators Site Execution Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 124 Interviews
DLF Interview Questions
4.0
 • 73 Interviews
Prestige Group Interview Questions
4.3
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
DRA Homes Interview Questions
4.6
 • 22 Interviews
JP Infra Interview Questions
3.8
 • 18 Interviews
View all
Sheth Creators Site Execution Engineer Salary
based on 4 salaries
₹4 L/yr - ₹5 L/yr
9% more than the average Site Execution Engineer Salary in India
View more details

Sheth Creators Site Execution Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

1.0

Work-life balance

2.0

Salary

3.0

Job security

3.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
29 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Senior Engineer
19 salaries
unlock blur

₹6 L/yr - ₹9.8 L/yr

Junior Engineer
18 salaries
unlock blur

₹2.5 L/yr - ₹3.7 L/yr

Site Engineer
18 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Executive
17 salaries
unlock blur

₹1.9 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Sheth Creators with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

DLF

4.0
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview