Upload Button Icon Add office photos

Filter interviews by

Sheth Creators Project Engineer Interview Questions and Answers

Updated 14 Apr 2023

Sheth Creators Project Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About your technical skills
Round 3 - HR 

(2 Questions)

  • Q1. About previous experience
  • Q2. Your Payscal of previous organisation

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Painting Quantity & type of paint?
  • Ans. 

    The painting quantity and type of paint depend on the project requirements and specifications.

    • The painting quantity is determined by the surface area to be painted and the number of coats required.

    • The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.

    • Common types of paint include acrylic, latex, oil-based, and epoxy paints.

    • The quantity and type of paint may vary...

  • Answered by AI
  • Q2. Bar bending schedule & Reinforcement details?
  • Ans. 

    Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.

    • Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.

    • It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.

    • BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...

  • Answered by AI
  • Q3. How to calculate Block work Quantity?
  • Ans. 

    Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.

    • Measure the length, width, and height of the blocks

    • Calculate the volume of each block by multiplying the length, width, and height

    • Determine the area to be covered by measuring the length and height of the wall

    • Divide the area by the volume of each block to get the quantity needed

    • Consider adding extra blocks for was

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Briefly&correctly tell us the details of what you have done in our previous company
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Share about yourself,
  • Q2. What are the gypsum brands
  • Ans. 

    Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.

    • USG

    • CertainTeed

    • Georgia-Pacific

  • Answered by AI
  • Q3. Explain fire fighting syatem in highrise buildings
  • Ans. 

    Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.

    • Fire alarms are installed throughout the building to alert occupants of a fire emergency.

    • Sprinkler systems automatically activate to extinguish fires in the early stages.

    • Fire extinguishers are strategically placed on each floor for manual fire suppression.

    • Fire hoses are available on each floor for trai...

  • Answered by AI
  • Q4. Is mivan shuttering used before
  • Ans. 

    Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.

    • Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.

    • It involves setting up aluminum formwork panels that are easily assembled and dismantled.

    • Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.

    • The use of Mivan shutte...

  • Answered by AI
  • Q5. What mix is used for marble flooring
  • Ans. 

    The mix used for marble flooring typically consists of marble chips, cement, sand, and water.

    • Marble chips are the main component for marble flooring mix

    • Cement is used as a binding agent

    • Sand is added for strength and durability

    • Water is used to create a workable mixture

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Go through with basic study of all department.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Project duration
  • Ans. 

    The project duration can vary depending on the scope, complexity, and resources available.

    • Project duration is typically determined during the planning phase

    • Factors such as scope changes, resource availability, and unexpected challenges can impact project duration

    • It is important to regularly monitor and adjust the project timeline as needed

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(6 Questions)

  • Q1. Asked about family background and overall experiences previously. Current CTC reason to leaveing the last branded firm Lodha group.
  • Ans. 

    How many children and studying in class?

  • Answered Anonymously
  • Q2. About the working day.
  • Q3. Asked about family members.
  • Q4. Living location and how many dependent.
  • Ans. 

    I currently live in New York City with my spouse and two children.

    • Living in New York City with spouse and two children

    • Total of four dependents including spouse and two children

  • Answered by AI
  • Q5. Finally the positive response received from the team.
  • Ans. 

    Yes , after successful interview round, received offer letter from the company and same day replied.

  • Answered Anonymously
  • Q6. After completing the interview process ,same day received the offer letter.
  • Ans. 

    Yes , after successful interview round, received offer.

  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Very good supporting senior and company culture.
Fast growing company in the real estate industry.

I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

Interview Preparation Tips

Topics to prepare for Rajapushpa Properties Project Manager Civil interview:
  • Civil Construction
  • Bilding
  • Quality Control
  • Shutaring
Interview preparation tips for other job seekers - Hardworking out put verry happy

I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. How to start the projects immediately
  • Ans. 

    To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.

    • Identify the project scope and objectives

    • Create a project plan with clear timelines and milestones

    • Assemble a team with the necessary skills and expertise

    • Assign tasks and responsibilities to team members

    • Establish communication channels and protocols

    • Monitor progress and adjust the plan as needed

  • Answered by AI
  • Q2. What is the initially project requirements to start.
  • Ans. 

    The initial project requirements include defining project goals, scope, timeline, budget, and team roles.

    • Define project goals and objectives

    • Determine project scope and deliverables

    • Create a project timeline and schedule

    • Establish a project budget and resource allocation

    • Assign team roles and responsibilities

  • Answered by AI
  • Q3. Preliminary investigation and procurements of projects execution.
  • Q4. Basic engineering information of project management.
  • Q5. Required manpower as per projects planning organization charts.
  • Q6. Required plant and machinery mobilization.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advise timely design engineering,Manpower and Machinery mobilization.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Weight of steel and calculate the weight of steel in a structure given
  • Ans. 

    Calculate the weight of steel in a structure based on its dimensions and density

    • Determine the dimensions of the steel components (length, width, height)

    • Calculate the volume of each steel component using the formula: Volume = Length x Width x Height

    • Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight

    • Sum up the weights of all steel components to get the total

  • Answered by AI
  • Q2. About previous work experience
Round 2 - HR 

(2 Questions)

  • Q1. Salary negotiation
  • Q2. About previous company roles and responsibilities and this company roles and responsibilities.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well in technical and site progress and site activities from the basement to finishing work.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About previous projects
Round 3 - HR 

(1 Question)

  • Q1. Joining period Percentage of salary hike
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Explain Pile foundation DMC Method
  • Ans. 

    DMC method is a pile foundation technique that involves driving piles into the ground using a drop hammer.

    • DMC stands for Drop Hammer Compaction method.

    • It is a commonly used technique in civil engineering for constructing pile foundations.

    • In this method, a pile is driven into the ground using a drop hammer, which is lifted and then dropped onto the pile.

    • The repeated impact of the drop hammer compacts the soil around the...

  • Answered by AI
  • Q2. Explain the Methodology for Waterproofing
  • Ans. 

    Waterproofing methodology involves various techniques to prevent water penetration and damage to structures.

    • Identify the source of water leakage or potential areas of water penetration

    • Select appropriate waterproofing materials based on the type of structure and water exposure

    • Prepare the surface by cleaning and repairing any cracks or damages

    • Apply waterproofing membranes or coatings to create a barrier against water

    • Ensu...

  • Answered by AI
  • Q3. Explain the Cement & Steel Consumption for Slab
  • Ans. 

    Cement and steel consumption for slab depends on the design, dimensions, and load requirements.

    • Cement consumption is determined by the thickness of the slab and the mix design.

    • Steel consumption is influenced by the span, load capacity, and reinforcement requirements.

    • For example, a 100mm thick slab may require around 0.5 cubic meters of cement per square meter.

    • Steel consumption can vary from 0.5% to 2% of the total slab...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Salary Expectation
  • Q2. Notice Period and joining date

Sheth Creators Interview FAQs

How many rounds are there in Sheth Creators Project Engineer interview?
Sheth Creators interview process usually has 3 rounds. The most common rounds in the Sheth Creators interview process are HR, Resume Shortlist and Technical.

Tell us how to improve this page.

Sheth Creators Project Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Sheth Creators Project Engineer Reviews and Ratings

based on 1 review

1.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

1.0

Salary

1.0

Job security

3.0

Company culture

1.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
29 salaries
unlock blur

₹5 L/yr - ₹9 L/yr

Senior Engineer
18 salaries
unlock blur

₹6 L/yr - ₹9.8 L/yr

Junior Engineer
18 salaries
unlock blur

₹2.5 L/yr - ₹3.8 L/yr

Site Engineer
18 salaries
unlock blur

₹3.6 L/yr - ₹8.6 L/yr

Executive
17 salaries
unlock blur

₹1.9 L/yr - ₹5.2 L/yr

Explore more salaries
Compare Sheth Creators with

Godrej Properties

3.7
Compare

Prestige Group

4.3
Compare

DLF

3.9
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview