I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
Some popular gypsum brands include USG, CertainTeed, and Georgia-Pacific.
USG
CertainTeed
Georgia-Pacific
Fire fighting system in highrise buildings includes fire alarms, sprinkler systems, fire extinguishers, and fire hoses.
Fire alarms are installed throughout the building to alert occupants of a fire emergency.
Sprinkler systems automatically activate to extinguish fires in the early stages.
Fire extinguishers are strategically placed on each floor for manual fire suppression.
Fire hoses are available on each floor for trai...
Yes, Mivan shuttering is a popular construction technique used for casting walls and slabs in buildings.
Mivan shuttering is a formwork system that allows for rapid construction of concrete walls and slabs.
It involves setting up aluminum formwork panels that are easily assembled and dismantled.
Mivan shuttering is commonly used in high-rise buildings, residential complexes, and commercial projects.
The use of Mivan shutte...
The mix used for marble flooring typically consists of marble chips, cement, sand, and water.
Marble chips are the main component for marble flooring mix
Cement is used as a binding agent
Sand is added for strength and durability
Water is used to create a workable mixture
The project duration can vary depending on the scope, complexity, and resources available.
Project duration is typically determined during the planning phase
Factors such as scope changes, resource availability, and unexpected challenges can impact project duration
It is important to regularly monitor and adjust the project timeline as needed
I applied via Referral and was interviewed in Jul 2023. There were 2 interview rounds.
How many children and studying in class?
I currently live in New York City with my spouse and two children.
Living in New York City with spouse and two children
Total of four dependents including spouse and two children
Yes , after successful interview round, received offer letter from the company and same day replied.
Yes , after successful interview round, received offer.
posted on 9 Apr 2022
I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
Calculate the weight of steel in a structure based on its dimensions and density
Determine the dimensions of the steel components (length, width, height)
Calculate the volume of each steel component using the formula: Volume = Length x Width x Height
Multiply the volume of each steel component by the density of steel (usually around 7850 kg/m^3) to get the weight
Sum up the weights of all steel components to get the total
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jan 2023. There were 2 interview rounds.
DMC method is a pile foundation technique that involves driving piles into the ground using a drop hammer.
DMC stands for Drop Hammer Compaction method.
It is a commonly used technique in civil engineering for constructing pile foundations.
In this method, a pile is driven into the ground using a drop hammer, which is lifted and then dropped onto the pile.
The repeated impact of the drop hammer compacts the soil around the...
Waterproofing methodology involves various techniques to prevent water penetration and damage to structures.
Identify the source of water leakage or potential areas of water penetration
Select appropriate waterproofing materials based on the type of structure and water exposure
Prepare the surface by cleaning and repairing any cracks or damages
Apply waterproofing membranes or coatings to create a barrier against water
Ensu...
Cement and steel consumption for slab depends on the design, dimensions, and load requirements.
Cement consumption is determined by the thickness of the slab and the mix design.
Steel consumption is influenced by the span, load capacity, and reinforcement requirements.
For example, a 100mm thick slab may require around 0.5 cubic meters of cement per square meter.
Steel consumption can vary from 0.5% to 2% of the total slab...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
29
salaries
| ₹5 L/yr - ₹9 L/yr |
Senior Engineer
18
salaries
| ₹6 L/yr - ₹9.8 L/yr |
Junior Engineer
18
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Site Engineer
18
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Executive
17
salaries
| ₹1.9 L/yr - ₹5.2 L/yr |
Godrej Properties
Prestige Group
DLF
Sobha