I applied via Naukri.com and was interviewed before Apr 2022. There were 3 interview rounds.
Top trending discussions
posted on 9 Jul 2022
I applied via Naukri.com and was interviewed before Jul 2021. There were 2 interview rounds.
Section and elevation drawings of a bathroom
Include dimensions for all fixtures and fittings
Show the placement of plumbing lines and electrical outlets
Label materials and finishes for walls, floors, and fixtures
A leading engineering company specializing in innovative solutions for various industries.
Provides cutting-edge engineering solutions
Works with a wide range of industries such as automotive, aerospace, and technology
Focuses on research and development to stay ahead of the competition
Received positive feedback on technical skills and leadership abilities.
Received commendation for successfully leading a team in completing a major project ahead of schedule
Recognized for consistently providing innovative solutions to complex technical challenges
Received high ratings for communication skills and ability to collaborate effectively with cross-functional teams
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I applied via Campus Placement and was interviewed in May 2024. There were 2 interview rounds.
The aptitude test consists of logical reasoning, quantity and time related questions. The questions aren't that difficult if prepared well.
Execution of steel and shuttering involves the proper planning, design, and installation of these materials for construction projects.
Steel reinforcement bars must be placed in the correct location and spacing to ensure structural integrity.
Shuttering must be properly designed and installed to create the desired shape and size of concrete structures.
Both steel and shuttering must be inspected regularly to ensure they a...
I applied via Walk-in and was interviewed before Jun 2020. There was 1 interview round.
To start projects immediately, prioritize tasks, assemble the team, and establish clear goals and timelines.
Identify the project scope and objectives
Create a project plan with clear timelines and milestones
Assemble a team with the necessary skills and expertise
Assign tasks and responsibilities to team members
Establish communication channels and protocols
Monitor progress and adjust the plan as needed
The initial project requirements include defining project goals, scope, timeline, budget, and team roles.
Define project goals and objectives
Determine project scope and deliverables
Create a project timeline and schedule
Establish a project budget and resource allocation
Assign team roles and responsibilities
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Assistant Manager
32
salaries
| ₹5 L/yr - ₹10.3 L/yr |
Senior Engineer
18
salaries
| ₹6 L/yr - ₹9.8 L/yr |
Junior Engineer
18
salaries
| ₹2.5 L/yr - ₹3.8 L/yr |
Site Engineer
18
salaries
| ₹3.6 L/yr - ₹8.6 L/yr |
Executive
17
salaries
| ₹1.9 L/yr - ₹5.2 L/yr |
Realty Assistant
Kunal Structure
Omkar Realtors and Developers Group
HM Group