Filter interviews by
I applied via Recruitment Consulltant and was interviewed before Nov 2023. There were 2 interview rounds.
The scaffolding time line for deshuttering involves planning and coordination to ensure safe and efficient removal of scaffolding.
Create a detailed schedule outlining when each section of scaffolding will be removed
Coordinate with the construction team to ensure deshuttering aligns with project timelines
Consider factors such as weather conditions and safety regulations when planning the deshuttering process
I prioritize tasks based on urgency and importance to create a realistic schedule timeline.
Evaluate the scope of the project and break it down into smaller tasks
Estimate the time required for each task and allocate resources accordingly
Consider dependencies between tasks and adjust the schedule as needed
Regularly monitor progress and make adjustments to the timeline as necessary
Crash time is the shortest possible time in which a project can be completed by assigning additional resources.
Crash time helps in speeding up project completion by adding more resources to critical path activities
It involves identifying critical activities that can be shortened without affecting the project timeline
Crash time is implemented by adding extra resources, working overtime, or fast-tracking activities
Exampl...
I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.
Rate analysis of shuttering and rebar involves calculating the cost of materials, labor, and equipment for formwork and reinforcement work.
Rate analysis involves determining the cost of materials, labor, and equipment for a specific task or activity.
For shuttering, the analysis would include the cost of formwork materials such as plywood, props, and scaffolding, as well as the labor required for installation.
For rebar,...
Top trending discussions
Print the level order traversal of binary tree in spiral form
Perform level order traversal of the binary tree
Alternate the direction of traversal for each level
Use a stack to reverse the order of nodes in each level
Print the nodes in the order of traversal
Find the maximum element in each subarray of size k in a given array.
Iterate through the array from index 0 to n-k.
For each subarray of size k, find the maximum element.
Store the maximum elements in a separate array.
Return the array of maximum elements.
To find the Kth largest element in two sorted arrays, we can use the merge step of merge sort algorithm.
Merge the two arrays into a single sorted array using a modified merge sort algorithm.
Return the Kth element from the merged array.
Merge two sorted arrays into one sorted array with expected time complexity of (m+n).
Use a two-pointer approach to compare elements from both arrays and merge them into the first array.
Start comparing elements from the end of both arrays and place the larger element at the end of the first array.
Continue this process until all elements from the second array are merged into the first array.
based on 4 interviews
Interview experience
based on 13 reviews
Rating in categories
Project Manager
7
salaries
| ₹14 L/yr - ₹16.2 L/yr |
General Manager
4
salaries
| ₹21 L/yr - ₹40 L/yr |
Store Executive
4
salaries
| ₹3.5 L/yr - ₹5.1 L/yr |
Assistant Manager
3
salaries
| ₹6 L/yr - ₹6.8 L/yr |
Network & System Administrator
3
salaries
| ₹6.5 L/yr - ₹8.2 L/yr |
Sobha
Prestige Group
Godrej Properties
DLF