Upload Button Icon Add office photos

Filter interviews by

Veerteja Projects Civil Site Supervisor Interview Questions, Process, and Tips

Updated 16 Sep 2021

Veerteja Projects Civil Site Supervisor Interview Experiences

1 interview found

I applied via Company Website and was interviewed in Aug 2021. There was 1 interview round.

Interview Questionnaire 

18 Questions

  • Q1. Where we uses moment of resistance
  • Ans. 

    Moment of resistance is used in structural engineering to determine the maximum bending moment a beam can withstand before it fails.

    • Moment of resistance is used to design beams and columns in buildings and bridges.

    • It helps engineers determine the size and shape of the beam or column needed to support the weight and forces placed upon it.

    • Moment of resistance is calculated using the material properties of the beam or col...

  • Answered by AI
  • Q2. What's Moduler Ratio of design mix concrete?
  • Ans. 

    Modular ratio is the ratio of modulus of elasticity of steel to that of concrete in a reinforced concrete section.

    • Modular ratio is used to determine the stress distribution in a reinforced concrete section.

    • It is denoted by the symbol 'm'.

    • The value of modular ratio varies depending on the type of steel and concrete used.

    • For example, for mild steel and normal weight concrete, the modular ratio is typically around 280.

    • Mod...

  • Answered by AI
  • Q3. Maximum slanderness Ratio column?
  • Ans. 

    The maximum slenderness ratio of a column is the ratio of its effective length to its least radius of gyration.

    • The slenderness ratio is used to determine the buckling strength of a column.

    • The maximum slenderness ratio varies depending on the material and cross-sectional shape of the column.

    • For steel columns, the maximum slenderness ratio is typically around 200.

    • For concrete columns, the maximum slenderness ratio is typ...

  • Answered by AI
  • Q4. Common Size of bricks?
  • Ans. 

    The common size of bricks is 190 mm x 90 mm x 90 mm.

    • The standard size of bricks varies from country to country.

    • In India, the common size of bricks is 190 mm x 90 mm x 90 mm.

    • In the United States, the standard size of bricks is 203 mm x 92 mm x 57 mm.

    • Bricks can also come in different shapes and sizes for specific purposes, such as bullnose bricks for rounded edges.

    • The size of bricks can affect the number of bricks needed

  • Answered by AI
  • Q5. Reason of yellow colour of bricks?
  • Ans. 

    Yellow colour of bricks is due to the presence of iron oxide.

    • Iron oxide is a common ingredient in clay used to make bricks.

    • The amount of iron oxide present in the clay determines the shade of yellow.

    • Bricks can also be artificially coloured yellow using pigments.

    • Yellow bricks are popular in construction due to their aesthetic appeal.

  • Answered by AI
  • Q6. How many percent steel provide in slab ?
  • Ans. 

    The percentage of steel provided in a slab depends on the design and load requirements.

    • The percentage of steel in a slab is determined by the design and load requirements.

    • The steel reinforcement in a slab is typically placed in the bottom layer to resist tension forces.

    • The percentage of steel in a slab can range from 0.5% to 5% depending on the design.

    • The steel reinforcement in a slab is typically in the form of bars o...

  • Answered by AI
  • Q7. Which survey in earths 🌍 measurement Survay carefully?
  • Ans. 

    The survey for earth's measurement that needs to be done carefully is Geodetic Survey.

    • Geodetic Survey is a precise surveying method that takes into account the curvature of the earth and its gravitational field.

    • It is used to determine the exact location and elevation of points on the earth's surface.

    • This survey is important for construction projects, mapping, and navigation.

    • Errors in geodetic survey can lead to signifi...

  • Answered by AI
  • Q8. Minimum Size of clay soil?
  • Ans. 

    The minimum size of clay soil is 0.002 mm.

    • Clay soil particles are smaller than silt particles.

    • The size of clay particles ranges from 0.002 mm to 0.0002 mm.

    • Clay soil has a high plasticity and can retain water for a long time.

    • The small size of clay particles makes it difficult for water to penetrate the soil.

    • Clay soil is commonly found in areas with a high concentration of volcanic ash or sedimentary rocks.

  • Answered by AI
  • Q9. Nominal and maximum size of aggregate?
  • Ans. 

    Nominal size is the size of the sieve that the material passes through, while maximum size is the largest particle size in the aggregate.

    • Nominal size is typically expressed as the sieve size that the material passes through, such as 3/8 inch or 10mm.

    • Maximum size is the largest particle size in the aggregate, and is typically expressed in the same units as the nominal size.

    • The maximum size of aggregate is important in d...

  • Answered by AI
  • Q10. During Earthquake situation of sand?
  • Ans. 

    During an earthquake, sand can liquefy and lose its strength, causing instability in structures.

    • Sand can behave like a liquid during an earthquake, a phenomenon known as liquefaction.

    • This can cause the sand to lose its strength and stability, leading to potential damage to structures built on top of it.

    • Civil site supervisors should be aware of the potential for liquefaction and take appropriate measures to ensure the s...

  • Answered by AI
  • Q11. Indian hilly areas in uses of errigation method?
  • Ans. 

    Hilly areas in India use various irrigation methods such as terracing, contour farming, and drip irrigation.

    • Terracing involves creating steps on the hillside to prevent soil erosion and retain water.

    • Contour farming involves planting crops along the contour lines of the hill to prevent soil erosion and retain water.

    • Drip irrigation involves providing water directly to the roots of the plants through a network of pipes an...

  • Answered by AI
  • Q12. Why we provide deep beam in building structure?
  • Ans. 

    Deep beams are provided in building structures to resist high shear forces and bending moments.

    • Deep beams are used in structures where the span is large and the load is heavy.

    • They are used to resist high shear forces and bending moments.

    • Deep beams are also used to support heavy loads from columns or walls.

    • They are commonly used in parking garages, bridges, and high-rise buildings.

    • Deep beams can be designed as reinforce...

  • Answered by AI
  • Q13. Which reasons is sudden failer situation of structure?
  • Ans. 

    Sudden failure of a structure can be caused by various reasons.

    • Poor design or construction

    • Natural disasters like earthquakes, floods, and hurricanes

    • Lack of maintenance and regular inspections

    • Overloading or exceeding the weight limit

    • Material defects or degradation over time

    • Environmental factors like corrosion or erosion

    • Human error or sabotage

    • Foundation issues or soil instability

    • Age of the structure

    • Inadequate safety meas...

  • Answered by AI
  • Q14. Why we used plumbob in plane table survay?
  • Ans. 

    Plumbob is used in plane table survey to ensure verticality of the instrument and accuracy of measurements.

    • Plumbob is a weight attached to a string that hangs vertically from the center of the instrument.

    • It helps in ensuring that the plane table is perfectly vertical and the measurements are accurate.

    • Plumbob is used to mark the exact location of the survey point on the plane table.

    • It is also used to align the plane tab...

  • Answered by AI
  • Q15. Minimum carbon percantage of Mild steel?
  • Ans. 

    The minimum carbon percentage of mild steel is 0.05%.

    • Mild steel is a low carbon steel.

    • It is also known as plain carbon steel.

    • The carbon content in mild steel ranges from 0.05% to 0.25%.

    • Mild steel is used in construction, automotive, and manufacturing industries.

  • Answered by AI
  • Q16. Percantage of Silica in Portland pozzolana cement?
  • Ans. 

    The percentage of silica in Portland pozzolana cement is typically between 10-25%.

    • Silica is a key ingredient in cement and helps to improve its strength and durability.

    • Portland pozzolana cement is a type of cement that contains fly ash or volcanic ash.

    • The percentage of silica in cement can vary depending on the specific type and brand.

    • Excessive amounts of silica in cement can lead to health hazards for workers.

    • It is im...

  • Answered by AI
  • Q17. Under Water RCC. structures minimum Cover?
  • Ans. 

    Minimum cover for underwater RCC structures depends on various factors such as water depth, exposure conditions, and concrete quality.

    • Minimum cover for underwater RCC structures is generally higher than that for above-water structures.

    • The cover should be sufficient to protect the reinforcement from corrosion due to exposure to water and other environmental factors.

    • Factors such as water depth, exposure conditions, and c...

  • Answered by AI
  • Q18. Steel Structure in minimum thickness of steel plate?
  • Ans. 

    The minimum thickness of steel plate for a steel structure depends on various factors such as the load it needs to bear, the type of structure, and the design specifications.

    • The thickness of steel plate for a steel structure is determined by the load it needs to bear.

    • The type of structure also plays a role in determining the minimum thickness of steel plate.

    • Design specifications such as safety factors and material prop...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Allways mind setup of technical theory

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.

Round 1 - Aptitude Test 

If vinay is 6 months old, how much old is his younger brother, 6 years different

Round 2 - Assignment 

About civil engineering, structure engineering, construction, bill of materials

Round 3 - Group Discussion 

About concrete, pro and cons

Round 4 - Assignment 

About Design Concrete

Round 5 - Case Study 

Case study leaning tower of pissa

Round 6 - HR 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • My first name is John

    • My last name is Smith

    • I go by the name John Smith

  • Answered by AI
  • Q2. When did you complete BE
Round 7 - Technical 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • Full name is John Smith

    • Common name

    • No middle name or initial

  • Answered by AI
  • Q2. How old are you
  • Ans. 

    I am 28 years old.

    • I am currently 28 years old.

    • My age is 28.

    • I was born in 1993.

  • Answered by AI
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Trouble shooting
  • Q2. Monitoring log dob maven

Interview Preparation Tips

Interview preparation tips for other job seekers - prepare well
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Job Fair and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

In general, aptitude tests measure ones competence in logical reasoning, numerical skills, or verbal ability.

Round 2 - Technical 

(5 Questions)

  • Q1. What is the technical in my site ?
  • Q2. What about this company ?
  • Q3. What about my empolys ?
  • Q4. In many cases what will be approch in this technical issus ?
  • Ans. 

    The approach to technical issues in civil engineering often involves analyzing the problem, considering various solutions, and selecting the most feasible option.

    • Identify the technical issue and its impact on the project

    • Analyze the possible solutions and their pros and cons

    • Consider factors such as cost, time, and resources

    • Consult with team members or experts for input

    • Select the most feasible solution and implement it

    • Mo

  • Answered by AI
  • Q5. What is the technical ?

Interview Preparation Tips

Interview preparation tips for other job seekers - i want this job for i will raduse my skill development and i wiil done my job regulry not a skip my company
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Test of sand and water mineral

Round 3 - One-on-one 

(5 Questions)

  • Q1. Direct are located in one place and another place etc..,
  • Q2. Overall base of autocad desgin structure
  • Ans. 

    Autocad design structure serves as the foundation for creating detailed and accurate engineering drawings.

    • Autocad design structure includes layers, blocks, and dimensions to organize and display information.

    • It allows for precise measurements, annotations, and annotations to be added to drawings.

    • Autocad design structure enables easy editing and modification of drawings.

    • Examples of autocad design structures include creat...

  • Answered by AI
  • Q3. Graphic design and interior design
  • Q4. Design of road line
  • Ans. 

    Design of road line involves determining the alignment, width, and markings of a road to ensure safety and efficiency.

    • Consider the traffic volume and speed when determining the width of the road.

    • Ensure proper alignment to minimize sharp curves and slopes.

    • Include appropriate road markings such as lane dividers, pedestrian crossings, and stop lines.

    • Take into account factors like drainage, visibility, and road conditions

  • Answered by AI
  • Q5. Construction of road project
  • Ans. 

    Construction of road project involves planning, design, and execution of building roads for transportation.

    • Road project starts with surveying the land and designing the road layout.

    • Materials like asphalt, concrete, and gravel are used for construction.

    • Proper drainage systems are essential to prevent water damage to the road.

    • Quality control measures are implemented to ensure durability and safety.

    • Regular maintenance and...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Autocad design
Web design
Graphic design
Interior design
Pumps desgin

Skills evaluated in this interview

Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Oops concepts php
  • Q2. Aggregate function php
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. HDD related Fttx
Round 2 - HR 

(1 Question)

  • Q1. Expected CTC Why you want to join the company
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(5 Questions)

  • Q1. SURVEY, GRADE of concrete
  • Q2. Are U join my company
  • Q3. Yes, I'm interested in your company
  • Q4. I'm join your company
  • Q5. What are you doing now in Tech Mahindra company

Interview Preparation Tips

Topics to prepare for Tech Mahindra Site Engineer interview:
  • Diploma
  • Construction
  • Survey
Interview preparation tips for other job seekers - No share data other company, I'm interested to join your meeting 🤝

I applied via Naukri.com

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is cement grade?
  • Ans. 

    Cement grade refers to the strength and quality of cement used in construction.

    • Cement grade is determined by the compressive strength of cement mortar cubes after 28 days of curing.

    • The most commonly used cement grades are 33, 43, and 53, indicating their respective compressive strengths in megapascals (MPa).

    • Higher cement grades are used for structures that require higher strength, such as bridges and high-rise building...

  • Answered by AI
  • Q2. Opc 33, 43, 53 grads.
  • Q3. The standard size of a concrete cube is 15 cm × 15 cm × 15 cm
  • Ans. 

    Yes, the standard size of a concrete cube is 15 cm × 15 cm × 15 cm.

    • The standard size of a concrete cube is used for testing the compressive strength of concrete.

    • The cubes are casted and cured for 28 days before testing.

    • The cubes are tested using a compression testing machine.

    • The compressive strength of concrete is calculated by dividing the maximum load applied to the cube by the cross-sectional area of the cube.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I had done my Diploma in civil engineering. If you have any vacancy in your reputed organization. Please let me know.

I applied via Company Website and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the curing on site engineering
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete to promote its hydration and strength gain.

    • Curing is essential for the strength and durability of concrete.

    • It involves keeping the concrete moist and at a proper temperature for a specific period of time.

    • Curing can be done using various methods such as water curing, membrane curing, and steam curing.

    • The duration of curi...

  • Answered by AI
  • Q2. What is the strength of cement
  • Ans. 

    The strength of cement depends on its grade and type.

    • The strength of cement is measured in terms of compressive strength.

    • The grade of cement determines its strength. Higher the grade, higher the strength.

    • Type of cement also affects its strength. For example, Portland cement has higher strength than lime cement.

    • The strength of cement is also influenced by factors such as curing time, temperature, and humidity.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I intrest to do a job in your company ,I hope have
a capability to do a job

Veerteja Projects Interview FAQs

What are the top questions asked in Veerteja Projects Civil Site Supervisor interview?

Some of the top questions asked at the Veerteja Projects Civil Site Supervisor interview -

  1. Which survey in earths 🌍 measurement Survay careful...read more
  2. Which reasons is sudden failer situation of structu...read more
  3. What's Moduler Ratio of design mix concre...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Veerteja Projects interview
Company Website
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.2k Interviews
Accenture Interview Questions
3.9
 • 8k Interviews
Infosys Interview Questions
3.7
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.5k Interviews
Cognizant Interview Questions
3.8
 • 5.5k Interviews
Amazon Interview Questions
4.1
 • 4.9k Interviews
Capgemini Interview Questions
3.8
 • 4.7k Interviews
Tech Mahindra Interview Questions
3.6
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.7k Interviews
Genpact Interview Questions
3.9
 • 3k Interviews
View all
Veerteja Projects Civil Site Supervisor Salary
based on 4 salaries
₹1.8 L/yr - ₹2.2 L/yr
33% less than the average Civil Site Supervisor Salary in India
View more details

Veerteja Projects Civil Site Supervisor Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

4.0

Skill development

3.0

Work-Life balance

2.0

Salary & Benefits

3.0

Job Security

3.0

Company culture

2.0

Promotions/Appraisal

3.0

Work Satisfaction

Explore 1 Review and Rating
Civil Site Supervisor
4 salaries
unlock blur

₹1.8 L/yr - ₹2.2 L/yr

Explore more salaries
Compare Veerteja Projects with

TCS

3.7
Compare

Accenture

3.9
Compare

Infosys

3.7
Compare

Wipro

3.7
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview