Round 1 - Assignment 

Tender Exicutive and billing

Round 2 - Technical 

(2 Questions)

  • Q1. Pilling work estimate
  • Ans. 

    Piling work estimate involves calculating the cost and quantity of materials needed for piling work on a construction site.

    • Calculate the total length and diameter of piles required for the project

    • Estimate the quantity of concrete, steel, and other materials needed for piling

    • Consider factors like soil conditions, depth of piling, and equipment costs

    • Use software tools like AutoCAD and Excel for accurate estimates

  • Answered by AI
  • Q2. Major bridge activities
  • Ans. 

    Major bridge activities include design, construction, maintenance, and inspection.

    • Designing the bridge structure and foundation

    • Constructing the bridge using materials like steel, concrete, and cables

    • Maintaining the bridge to ensure safety and longevity

    • Inspecting the bridge regularly for any signs of wear or damage

  • Answered by AI

Billing Engineer Interview Questions asked at other Companies

Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
View answer (9)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jan 2023. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Hr questions based on transmission line
  • Q2. Type of foundation and functions of each foundation
  • Ans. 

    Different types of foundations are used in civil engineering for various purposes.

    • Shallow foundations are used for light structures and transfer loads to the soil near the surface.

    • Deep foundations are used for heavy structures and transfer loads to deeper layers of soil or rock.

    • Spread footings are used to distribute the load of a structure over a larger area.

    • Pile foundations are used to transfer loads through vertical ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I give advice for freshers candidate that she/her the prepare to based on civil engineer

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Tell me about yourself.

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (65)

Interview questions from similar companies

I was interviewed before Nov 2016.

Interview Questionnaire 

3 Questions

  • Q1. What is leveling
  • Ans. 

    Leveling is the process of determining the height or elevation of a point or surface relative to a reference point.

    • Leveling is commonly used in civil engineering and construction to ensure accurate measurements and proper alignment.

    • It involves the use of leveling instruments such as a level, theodolite, or laser level.

    • The process typically includes setting up benchmarks or reference points, taking readings at different...

  • Answered by AI
  • Q2. What is dia of six mm
  • Ans. 

    The diameter of six mm refers to the size or measurement of a circular object that is six millimeters in width.

    • The diameter is the distance across the center of a circle, passing through the circumference.

    • A six mm diameter can be visualized as a circle with a width of six millimeters.

    • It is a common measurement used in various industries, including engineering and manufacturing.

    • For example, a six mm diameter steel rod w...

  • Answered by AI
  • Q3. What is formula of lep
  • Ans. 

    LEP stands for Load Equivalent Factor for Pavement design.

    • LEP is used in pavement design to determine the load-carrying capacity of the pavement.

    • The formula for LEP depends on the specific design method being used.

    • For example, in the AASHTO design method, LEP is calculated using the formula: LEP = (ESAL/1000) * (1 + 0.003 * (T - 3))

    • Here, ESAL is the Equivalent Single Axle Load and T is the pavement design period in yea...

  • Answered by AI
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all Resume tips
Round 2 - Assignment 

Related to auto level and total station one more thing buliding material

Round 3 - HR 

(1 Question)

  • Q1. About the site work

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • For leveling
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is lap length of bar in beam.
  • Ans. 

    The lap length of a bar in a beam is the length of overlap between two reinforcing bars.

    • Lap length is important for ensuring the transfer of load between bars.

    • It helps in maintaining the continuity of reinforcement.

    • The lap length depends on factors like bar diameter, concrete strength, and design requirements.

    • It is typically specified in building codes or structural design drawings.

    • For example, in a beam, the lap lengt...

  • Answered by AI
  • Q2. Ratio of M15 grade of concrete
  • Ans. 

    The ratio of M15 grade of concrete is 1:2:4.

    • The ratio of M15 grade of concrete refers to the proportion of cement, sand, and aggregate used in the mix.

    • For M15 grade concrete, the ratio is 1 part cement : 2 parts sand : 4 parts aggregate.

    • This means that for every 1 unit of cement, 2 units of sand, and 4 units of aggregate are used.

    • The ratio is usually represented as 1:2:4.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Any civil engineer have must attentioned in technical part of Structure and take proper position in Structure according to drawing.

I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Technical 

(5 Questions)

  • Q1. What is meaning wcr ?
  • Ans. 

    WCR stands for Working Capital Ratio.

    • Working Capital Ratio is a financial metric used to measure a company's liquidity and ability to pay off its short-term debts.

    • It is calculated by dividing a company's current assets by its current liabilities.

    • A WCR of 1 or higher indicates that a company has enough current assets to cover its current liabilities.

    • A WCR below 1 may indicate that a company may have difficulty paying of...

  • Answered by AI
  • Q2. What is civil engineers rool
  • Q3. What is the minimum thickness of grade slab
  • Ans. 

    The minimum thickness of grade slab depends on the load it will bear and the soil conditions.

    • The thickness of the grade slab should be determined by a structural engineer.

    • It should be thick enough to support the weight of the structure and any additional loads.

    • The soil conditions should also be taken into consideration when determining the thickness.

    • For example, if the soil is soft or unstable, a thicker slab may be re...

  • Answered by AI
  • Q4. Can u plss define planning
  • Ans. 

    Planning is the process of creating a roadmap to achieve a specific goal or objective.

    • It involves identifying the goal or objective

    • Determining the steps needed to achieve it

    • Allocating resources and setting timelines

    • Monitoring progress and making adjustments as necessary

    • Examples include project planning, financial planning, and strategic planning

  • Answered by AI
  • Q5. What main roles of Qc

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • Structural engineer course
Interview preparation tips for other job seekers - Civil engineers are in Royalti and any problem are coming solved is the one of the big attitude

I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Site engineer 

(2 Questions)

  • Q1. Building construction
  • Q2. High way roads and buildings
Round 3 - Assignment 

Surgery in field what ever you ask not issue

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Civil Site Engineer interview:
  • Civil Engineering
Interview preparation tips for other job seekers - Site works and two years experience worked in GV REDDY INFRA

Interview Questionnaire 

1 Question

  • Q1. Building and drain
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jan 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(2 Questions)

  • Q1. RCC work normel cement
  • Q2. M20 Gread of concrete strength
  • Ans. 

    M20 is a grade of concrete with a compressive strength of 20 MPa.

    • M20 is a commonly used grade of concrete in construction.

    • It has a compressive strength of 20 MPa or 2900 psi.

    • It is suitable for non-load bearing walls, footings, and other general construction purposes.

    • The mix ratio for M20 concrete is 1:1.5:3 (cement:sand:aggregate).

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Site maintenance work I know Maintenance For Labour And Materials
Contribute & help others!
anonymous
You can choose to be anonymous

VBB Infra Pvt. Ltd. Interview FAQs

How many rounds are there in VBB Infra Pvt. Ltd. interview?
VBB Infra Pvt. Ltd. interview process usually has 2 rounds. The most common rounds in the VBB Infra Pvt. Ltd. interview process are Resume Shortlist, HR and Assignment.
What are the top questions asked in VBB Infra Pvt. Ltd. interview?

Some of the top questions asked at the VBB Infra Pvt. Ltd. interview -

  1. Type of foundation and functions of each foundat...read more
  2. Pilling work estim...read more
  3. Major bridge activit...read more

Recently Viewed

INTERVIEWS

BNY

No Interviews

INTERVIEWS

Samsung Semiconductor

No Interviews

INTERVIEWS

Corona Remedies

No Interviews

INTERVIEWS

Sksl

No Interviews

INTERVIEWS

IBM Research

No Interviews

INTERVIEWS

Rakuten Symphony

No Interviews

INTERVIEWS

Trail Blazer

No Interviews

Tell us how to improve this page.

VBB Infra Pvt. Ltd. Interview Process

based on 3 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 741 Interviews
Tata Projects Interview Questions
4.2
 • 425 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

VBB Infra Pvt. Ltd. Reviews and Ratings

based on 7 reviews

4.4/5

Rating in categories

4.3

Skill development

4.4

Work-life balance

4.4

Salary

4.4

Job security

4.4

Company culture

4.2

Promotions

4.3

Work satisfaction

Explore 7 Reviews and Ratings
Civil Site Engineer
11 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Supervisor
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Accountant
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare VBB Infra Pvt. Ltd. with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent