Filter interviews by
I applied via Approached by Company and was interviewed before Oct 2022. There was 1 interview round.
Reco stands for Receiving and Checking Outward. It is a process of receiving goods into the store and checking them against the delivery note.
Ensure the goods received match the quantity and quality specified in the delivery note.
Check for any damages or discrepancies in the received goods.
Record the details of the received goods in the inventory system.
Label the goods with appropriate identification tags or labels.
Sto...
MRIV stands for Material Requisition Issue Voucher and MRV stands for Material Requisition Voucher.
MRIV is used to record the issuance of materials from the store to a department or individual.
MRV is used to request materials from the store for a specific purpose or project.
Both MRIV and MRV help in maintaining accurate records of material transactions in a store.
PVC, CPVC, and UPVC are types of plastic pipes with different properties and applications.
PVC (Polyvinyl Chloride) is a versatile plastic used for a variety of applications, including pipes, fittings, and siding.
CPVC (Chlorinated Polyvinyl Chloride) is a type of PVC that has been chlorinated to increase its temperature resistance, making it suitable for hot water applications.
UPVC (Unplasticized Polyvinyl Chloride) is ...
Current CTC is $40,000 and Expected CTC is $50,000.
Current CTC: $40,000
Expected CTC: $50,000
Currently located in New York City, but willing to relocate for the right opportunity.
Currently located in New York City
Willing to relocate for the right opportunity
Yes, I am able to handle store independently with my experience in inventory management and organization skills.
I have experience in inventory management and organization
I am familiar with store operations and procedures
I can handle store tasks efficiently without constant supervision
Top trending discussions
I applied via Approached by Company and was interviewed in Sep 2024. There were 4 interview rounds.
General SQL questions, Window Functions, Agg Functions, Case statement logic building
SQL assignment, easier than 1st round
I was interviewed in Aug 2024.
posted on 21 Jan 2025
My current CTC is $80,000 per year.
My current CTC is $80,000 per year.
I am currently earning $80,000 annually.
My current salary is $80,000 per year.
I was interviewed in Dec 2024.
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
Shakti hormann and its products.
posted on 25 Jan 2025
I was interviewed in Jul 2024.
posted on 26 Sep 2024
Measurement of job product is crucial for ensuring quality and accuracy in the bending shop.
Accurate measurement ensures precise bending of materials
Use of tools such as calipers, rulers, and protractors for measurement
Regular calibration of measurement tools to maintain accuracy
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There was 1 interview round.
Safety is the state of being protected from harm, danger, or injury.
Safety involves identifying and minimizing risks in the workplace or environment.
It includes following safety protocols and procedures to prevent accidents.
Safety also involves providing proper training and equipment to ensure protection.
Examples: wearing personal protective equipment, following fire safety protocols, conducting safety inspections.
Risk assessment is the process of identifying, analyzing, and evaluating potential risks in order to determine the best course of action to minimize or eliminate them.
Identifying potential hazards and risks in the workplace or environment
Analyzing the likelihood and severity of each risk
Evaluating the level of risk and determining appropriate control measures
Implementing control measures to reduce or eliminate the iden...
Supply Chain Management (SCM) involves the coordination and management of all activities involved in sourcing, procurement, production, and logistics.
Involves planning, implementing, and controlling the flow of goods and services from point of origin to point of consumption
Includes activities such as sourcing raw materials, manufacturing products, and distributing finished goods
Focuses on optimizing processes to minimi...
A mock drill is a simulated emergency exercise conducted to test the preparedness and response of individuals and organizations.
Mock drills are conducted to practice emergency procedures without the actual risk or consequences.
They help identify strengths and weaknesses in emergency response plans.
Mock drills can involve scenarios like fire drills, earthquake drills, active shooter drills, etc.
Participants are expected...
An emergency plan is a set of procedures and guidelines to follow in case of a crisis or disaster.
Emergency plans outline specific actions to take during emergencies
They include evacuation procedures, communication protocols, and emergency contacts
Emergency plans are tailored to specific types of emergencies, such as fires, natural disasters, or medical emergencies
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Project Manager
5
salaries
| ₹3.2 L/yr - ₹6.5 L/yr |
Executive Accountant
5
salaries
| ₹1.2 L/yr - ₹4.2 L/yr |
Electrical Engineer
3
salaries
| ₹3.8 L/yr - ₹5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company