Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.
Define project objectives and scope
Identify available resources and constraints
Create a detailed project schedule
Monitor progress and make adjustments as necessary
The planning process involves identifying objectives, determining resources, and creating a timeline for completion.
Identify project objectives and goals
Determine available resources and constraints
Create a detailed project plan with timelines and milestones
Monitor progress and make adjustments as necessary
Communicate with stakeholders and team members throughout the process
posted on 12 Nov 2024
I appeared for an interview in Sep 2024, where I was asked the following questions.
I appeared for an interview in Jul 2023.
Steel estimation in a beam involves calculating the quantity of steel required for reinforcement.
Calculate the total length of steel bars required based on the dimensions of the beam and the spacing of the bars.
Determine the diameter of the steel bars to be used for reinforcement.
Consider the grade of steel and the design requirements to calculate the total weight of steel needed.
Account for wastage and additional rein...
I applied via Walk-in and was interviewed in Aug 2023. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Sep 2022. There were 4 interview rounds.
Aptitude questions easy not much difficult but have to write
I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.
Grades of concrete refer to the strength of the concrete mix design.
Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.
Higher grade concrete has higher compressive strength and is used for structural purposes.
Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.
Slump in concrete refers to the measure of consistency of freshly mixed concrete.
Slump is determined by the amount of water in the concrete mix.
It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.
Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.
Slump test is comm...
Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.
Water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a water cement ratio of 0.5 is commonly used ...
M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.
M20 grade concrete is commonly used in residential construction.
It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.
The compressive strength of M20 grade concrete is 20 MPa.
It is suitable for foundations, beams, columns, and slabs.
I have worked on various projects including commercial buildings, residential complexes, and industrial facilities.
Commercial building construction
Residential complex development
Industrial facility upgrades
Code for method of measurement is a standardized set of rules and guidelines used to quantify and evaluate the work done in a construction project.
Codes for method of measurement provide a uniform and consistent way to measure quantities in construction projects.
They help in accurately estimating costs, monitoring progress, and resolving disputes.
Examples include CESMM (Civil Engineering Standard Method of Measurement)...
based on 2 reviews
Rating in categories
Billing Engineer
31
salaries
| ₹2.2 L/yr - ₹7.1 L/yr |
Executive Engineer
26
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Civil Site Engineer
26
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
24
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Site Engineer
22
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Sobha
Godrej Properties
DLF
Surya Roshni