Filter interviews by
I applied via Referral and was interviewed in Jan 2024. There was 1 interview round.
Working software is software that is functional, reliable, and meets the requirements of the end users.
Working software should be able to perform the tasks it was designed for without errors or bugs.
It should be reliable and consistent in its performance.
The software should meet the needs and expectations of the end users.
Regular updates and maintenance should be done to ensure the software remains in working condition...
Top trending discussions
I appeared for an interview before Jul 2016.
I am looking for a competitive salary that reflects my skills, experience, and the industry standard.
I am open to discussing salary based on the responsibilities and expectations of the role.
I have researched the average salary range for Design Engineer Trainees in this industry.
I am looking for a salary that is commensurate with my qualifications and the cost of living in the area.
I am also interested in benefits and
I applied via Walk-in and was interviewed before Sep 2020. There were 5 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Company Website and was interviewed before Apr 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before May 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Software Engineer
411
salaries
| ₹3.5 L/yr - ₹13 L/yr |
Senior Software Engineer
281
salaries
| ₹8 L/yr - ₹24 L/yr |
Senior Engineer
233
salaries
| ₹6 L/yr - ₹22 L/yr |
Design Engineer
216
salaries
| ₹3.2 L/yr - ₹12.5 L/yr |
Senior Design Engineer
179
salaries
| ₹6.6 L/yr - ₹16.4 L/yr |
Bosch
MRF Tyres
UNO Minda
Apollo Tyres