i
Uttam Strips
Filter interviews by
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
Ø Experience and good Knowledge in SAP Material management concepts like purchasing, inventory management and Master data with SAP WM in SAP MM,SAP WMS
7 years strong experience in Dispatch Planning, Stores, Warehouse management, Logistics, Inventory handling, Stock taking, Receiving, Packing, Shorting, Billining, Dispatch & their documentation process
I applied via Naukri.com and was interviewed before May 2021. There was 1 interview round.
Proxy is an intermediary server that acts as a gateway between clients and servers. SMPS is a power supply unit that converts AC to DC. Encoder is a device that converts motion into digital signals. Star delta is a method of starting three-phase motors.
Proxy helps in hiding the identity of clients and servers.
SMPS is commonly used in computers and other electronic devices.
Encoders are used in robotics, automation, and ...
posted on 10 Feb 2022
I applied via Recruitment Consulltant and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 27 Dec 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
posted on 1 Jun 2022
I applied via Approached by Company and was interviewed before Jun 2021. There were 3 interview rounds.
The specific power consumption of a plant depends on various factors such as the type of plant, its size, and the equipment used.
Specific power consumption is the amount of energy consumed per unit of production.
It can be calculated by dividing the total energy consumption by the total production output.
Factors that affect specific power consumption include the type of plant, its size, the equipment used, and the produ...
I applied via Naukri.com and was interviewed in Mar 2022. There was 1 interview round.
posted on 28 Jun 2023
I appeared for an interview before Jun 2022.
Implementation of new technologies
posted on 22 Jan 2023
I applied via Company Website and was interviewed in Dec 2022. There were 4 interview rounds.
Preventive maintenance is scheduled maintenance to prevent breakdowns while predictive maintenance uses data to predict failures.
Preventive maintenance involves regularly scheduled maintenance to prevent equipment breakdowns and prolong the lifespan of equipment.
Predictive maintenance uses data analysis to predict when equipment failure is likely to occur, allowing for maintenance to be scheduled before a breakdown occ...
PLC stands for Programmable Logic Controller and HMI stands for Human Machine Interface.
PLC is a digital computer used for automation of electromechanical processes.
It is used to control machinery on factory assembly lines, amusement rides, or light fixtures.
HMI is a graphical interface that allows humans to interact with machines.
It provides a visual representation of the process being controlled by the PLC.
Examples o...
Power factor can be managed by using capacitors, improving equipment efficiency, and reducing reactive power.
Install capacitors to offset reactive power and improve power factor
Upgrade equipment to more efficient models
Reduce the amount of reactive power by optimizing operations
Implement power factor correction techniques
Regularly monitor and maintain power factor levels
I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.
based on 3 reviews
Rating in categories
Quality Engineer
34
salaries
| ₹2.6 L/yr - ₹5 L/yr |
Assistant Manager
30
salaries
| ₹4.8 L/yr - ₹8.4 L/yr |
Senior Engineer
25
salaries
| ₹3.2 L/yr - ₹5.5 L/yr |
Assistant Engineer
25
salaries
| ₹2.2 L/yr - ₹3.7 L/yr |
Deputy Manager
13
salaries
| ₹5.4 L/yr - ₹12.6 L/yr |
SHYAM METALICS AND ENERGY
Jai Balaji Group
Electrotherm
Welspun Corp