Filter interviews by
I applied via Referral and was interviewed before Dec 2021. There were 5 interview rounds.
Frequently called me and discussed about current working process
Discussed on conference call along with other state IME manager
Asked some doubts and part numbers related to service and purchase
Top trending discussions
I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.
Using PSCAD to create a grid-tied wind power plant
Create a new project in PSCAD
Design the wind turbine system with appropriate parameters
Connect the wind turbine system to the grid
Simulate the system to analyze its performance
Optimize the design for maximum efficiency
I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.
Gear box replacement work
Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok
Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok
Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
Effective stakeholder management is crucial for project success.
Identify key stakeholders early on
Communicate regularly and clearly with stakeholders
Address stakeholder concerns and expectations
Involve stakeholders in decision-making processes
Manage conflicts and build positive relationships with stakeholders
I applied via Company Website
Boiler tubes are color coded for easy identification and maintenance purposes.
Boiler tubes are typically color coded based on their function or material composition.
Common color codes include blue for feedwater tubes, red for steam tubes, and green for superheater tubes.
Color coding helps maintenance personnel quickly identify and troubleshoot issues with specific tubes.
Color coding also aids in proper installation and...
NTPC expects employees to demonstrate strong leadership, technical skills, commitment to safety, and dedication to achieving company goals.
Demonstrate strong leadership skills in managing teams and projects
Possess technical expertise relevant to the role
Prioritize safety in all operations and decision-making
Show dedication to achieving NTPC's goals and objectives
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Psychometric test happened online
posted on 24 Jul 2023
I applied via Approached by Company and was interviewed in Jun 2023. There were 3 interview rounds.
Testing of equipments involves ensuring they are functioning properly and meet safety standards.
Regularly inspect equipment for any signs of damage or wear
Conduct performance tests to ensure equipment is functioning as expected
Calibrate equipment regularly to maintain accuracy
Follow manufacturer's guidelines for testing and maintenance
Keep detailed records of testing and maintenance activities
Train staff on proper use ...
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Interview experience
Project Engineer
5
salaries
| ₹2 L/yr - ₹3.2 L/yr |
Operations Manager
5
salaries
| ₹3.5 L/yr - ₹10 L/yr |
MIS Executive
5
salaries
| ₹1.5 L/yr - ₹8 L/yr |
Technical Manager
5
salaries
| ₹4 L/yr - ₹5 L/yr |
Surveillance Manager
5
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Tata Power
Adani Green Energy
Suzlon Group
Thermax Limited