Upload Button Icon Add office photos

Filter interviews by

Unitac Energy Solutions IME Manager Interview Questions and Answers

Updated 4 Dec 2022

Unitac Energy Solutions IME Manager Interview Experiences

1 interview found

IME Manager Interview Questions & Answers

user image Anonymous

posted on 4 Dec 2022

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2021. There were 5 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. About current working process
  • Q2. Asked related to man management
Round 3 - Aptitude Test 

Frequently called me and discussed about current working process

Round 4 - Case Study 

Discussed on conference call along with other state IME manager

Round 5 - Assignment 

Asked some doubts and part numbers related to service and purchase

Interview Preparation Tips

Topics to prepare for Unitac Energy Solutions IME Manager interview:
  • Related to electrical
Interview preparation tips for other job seekers - Unitac is a good platform to learn more to growing up. And kind of people are working here.

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. Why do you want to join Google?
  • Q2. Where do you see yourself in 5 years?
Round 2 - Technical 

(2 Questions)

  • Q1. Explain the differences between monolithic and microarchitectures
  • Ans. 

    Monolithic architecture is a single-tiered software application while microarchitecture is a multi-tiered software application.

    • Monolithic architecture is a single-tiered software application where all components are interconnected and interdependent.

    • Microarchitecture is a multi-tiered software application where components are divided into separate layers, each with its own responsibility.

    • Monolithic architecture is easi...

  • Answered by AI
  • Q2. Why is cloud better than on premise?
  • Ans. 

    Cloud offers scalability, cost-effectiveness, flexibility, and accessibility compared to on-premise solutions.

    • Scalability: Cloud allows for easily scaling resources up or down based on demand, while on-premise solutions require physical upgrades.

    • Cost-effectiveness: Cloud eliminates the need for expensive hardware and maintenance costs associated with on-premise solutions.

    • Flexibility: Cloud offers the ability to access ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Use pscad and make drif tied wind power plan
  • Ans. 

    Using PSCAD to create a grid-tied wind power plant

    • Create a new project in PSCAD

    • Design the wind turbine system with appropriate parameters

    • Connect the wind turbine system to the grid

    • Simulate the system to analyze its performance

    • Optimize the design for maximum efficiency

  • Answered by AI
  • Q2. How many years you will stay in this company?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - One-on-one 

(7 Questions)

  • Q1. Barring checking and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and belt clamping take-up up and blumber block top cover open and slue Ba...
  • Ans. 

    Belt clamping take-up pulley up and blumber block top cover open and slue Barring remove and new slue Barring checking and replace and bolts nut tightening sure and top cover fixed and bolts nut tightening sure and belt clamping and tackup pulley down and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q2. V-scraper replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and v-scraper remove and new v-scraper replace and bolts nut tigh...
  • Q3. Roller changed and replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and fream number mark and Roller shift and Roller cut change and walked awa...
  • Q4. Motor replace work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and motor remove and new motor replace and bolts nut tightening sure and ...
  • Ans. 

    Old motor bolts nut open and new motor replace and bolts nut tightening sure and Dayal gauge eliminate process ok and paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q5. Gear box replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolts nut open and gear box remove and new gear box replace and bolts nut tighten...
  • Ans. 

    Walked away clean and fresh and bolts nut open and old gear box remove and new gear box replace and bolts nut tightening sure and Dayal gauge eliminate process ok paper work cancelled and conveyer belt running ok

  • Answered Anonymously
  • Q6. Conveyer Barring checking and savings greasing work and safety first and all ppes sure and paper work and all pulley checking and savings Greasing sure and paper work cancelled and conveyer belt running o...
  • Q7. Fluid coupling oil replacement work and safety first and all ppes sure and paper work and try out and walked away clean and fresh and bolt nut open and old clean and fresh and new Oli Pur dropped and bolt...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the opportunity for growth and advancement
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. About experience and most of the about skills
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about yourself and skills
Round 3 - Technical 

(2 Questions)

  • Q1. Tell me about yourself and some technical questions
  • Q2. Why you want to join
Round 4 - HR 

(2 Questions)

  • Q1. Salary discussion
  • Q2. Can you early Joining dates?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why project management after all
  • Q2. Best stakeholder management practices
  • Ans. 

    Effective stakeholder management is crucial for project success.

    • Identify key stakeholders early on

    • Communicate regularly and clearly with stakeholders

    • Address stakeholder concerns and expectations

    • Involve stakeholders in decision-making processes

    • Manage conflicts and build positive relationships with stakeholders

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. How to managed manpower in critical condition.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. BBS safety ,legal requirements
  • Q2. Training plant safety
  • Q3. Precess safety management
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website

Round 1 - Technical 

(1 Question)

  • Q1. COLOUR CODE OF BOILER TUBES
  • Ans. 

    Boiler tubes are color coded for easy identification and maintenance purposes.

    • Boiler tubes are typically color coded based on their function or material composition.

    • Common color codes include blue for feedwater tubes, red for steam tubes, and green for superheater tubes.

    • Color coding helps maintenance personnel quickly identify and troubleshoot issues with specific tubes.

    • Color coding also aids in proper installation and...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. EXPECTATIONS FROM NTPC
  • Ans. 

    NTPC expects employees to demonstrate strong leadership, technical skills, commitment to safety, and dedication to achieving company goals.

    • Demonstrate strong leadership skills in managing teams and projects

    • Possess technical expertise relevant to the role

    • Prioritize safety in all operations and decision-making

    • Show dedication to achieving NTPC's goals and objectives

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Discussion on background and profile
Round 2 - Aptitude Test 

Psychometric test happened online

Unitac Energy Solutions Interview FAQs

How many rounds are there in Unitac Energy Solutions IME Manager interview?
Unitac Energy Solutions interview process usually has 5 rounds. The most common rounds in the Unitac Energy Solutions interview process are Assignment, Resume Shortlist and Technical.
What are the top questions asked in Unitac Energy Solutions IME Manager interview?

Some of the top questions asked at the Unitac Energy Solutions IME Manager interview -

  1. Asked related to man managem...read more
  2. About current working proc...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Unitac Energy Solutions interview
Referral
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
Havells Interview Questions
4.0
 • 202 Interviews
Adani Power Interview Questions
4.0
 • 201 Interviews
Adani Group Interview Questions
3.9
 • 175 Interviews
Exide Industries Interview Questions
3.5
 • 165 Interviews
Tata Power Interview Questions
3.9
 • 158 Interviews
NTPC Interview Questions
4.2
 • 158 Interviews
Suzlon Group Interview Questions
4.1
 • 123 Interviews
Torrent Power Interview Questions
3.8
 • 123 Interviews
View all
Unitac Energy Solutions IME Manager Salary
based on 4 salaries
₹4.9 L/yr - ₹5.3 L/yr
At par with the average IME Manager Salary in India
View more details
Project Engineer
5 salaries
unlock blur

₹2 L/yr - ₹3.2 L/yr

Operations Manager
5 salaries
unlock blur

₹3.5 L/yr - ₹10 L/yr

MIS Executive
5 salaries
unlock blur

₹1.5 L/yr - ₹8 L/yr

Technical Manager
5 salaries
unlock blur

₹4 L/yr - ₹5 L/yr

Surveillance Manager
5 salaries
unlock blur

₹3 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Unitac Energy Solutions with

Tata Power

3.9
Compare

Adani Green Energy

4.1
Compare

Suzlon Group

4.1
Compare

Thermax Limited

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview