UltraTech Cement
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Referral and was interviewed in May 2024. There were 3 interview rounds.
Online examination on General maths & English
Yield is the measure of the amount of usable product obtained from a process or reaction.
Yield is calculated as the ratio of the actual output to the theoretical maximum output.
It is an important metric in manufacturing and production to assess efficiency.
High yield indicates that a process is effective and efficient, while low yield may indicate issues or inefficiencies.
For example, in a chemical reaction, the yield i...
FM stands for Frequency Modulation. In the given context, 2.6 and 2.8 likely refer to specific frequencies.
FM is a method of encoding information on a carrier wave by varying the frequency of the wave.
In the context of 2.6 and 2.8, they could be referring to specific frequencies used in a communication system or equipment.
For example, 2.6 GHz and 2.8 GHz could be frequencies used for wireless communication.
Understandin...
I applied via Recruitment Consulltant and was interviewed in May 2024. There was 1 interview round.
P2O5 is a chemical compound known as diphosphorus pentoxide, commonly used as a dehydrating agent in organic synthesis.
P2O5 is a white, crystalline solid at room temperature.
It is highly hygroscopic, meaning it readily absorbs moisture from the air.
P2O5 is commonly used in organic synthesis as a dehydrating agent to remove water from reaction mixtures.
It reacts violently with water to form phosphoric acid (H3PO4).
Calibration of Blaine apparatus is essential for accurate measurement of fineness of cement.
Calibration ensures that the apparatus is providing accurate and consistent results.
Calibration involves checking the accuracy of the pressure gauge, air flow rate, and other components.
Regular calibration helps in maintaining the quality of cement production.
Example: Using a reference standard powder with known specific surface
UltraTech Cement interview questions for popular designations
Get interview-ready with Top UltraTech Cement Interview Questions
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
General Aptitude English math reasoning aptitude
I appeared for an interview in Jan 2025.
I applied via Approached by Company and was interviewed in Apr 2024. There was 1 interview round.
posted on 7 Apr 2024
I applied via Newspaper Ad and was interviewed in Mar 2024. There were 2 interview rounds.
I am a dedicated and detail-oriented professional with a strong background in quality control management.
Over 5 years of experience in quality control management
Strong attention to detail and ability to identify areas for improvement
Excellent communication and leadership skills
Proven track record of implementing successful quality control processes
Passionate about ensuring product quality and customer satisfaction
Troubleshooting process involves identifying and resolving issues to ensure smooth operations.
Identify the problem by gathering information and analyzing the situation
Develop a plan to address the issue, considering possible solutions
Implement the plan and monitor the results to see if the problem is resolved
Adjust the plan if necessary and document the process for future reference
PSD refers to the distribution of particle sizes in a sample, important for various industries like pharmaceuticals and mining.
PSD is a measurement of how particles are distributed in a given sample.
It is crucial in industries like pharmaceuticals to ensure proper dosage and effectiveness of drugs.
In mining, PSD helps in determining the efficiency of separation processes.
PSD can be analyzed using techniques like laser
Nc and Setting time of cement are important factors in determining the strength and durability of concrete.
Nc stands for normal consistency, which is the amount of water required to make the cement paste of standard consistency.
Setting time refers to the time taken by cement to harden and set.
The setting time of cement can be affected by factors like temperature, water-cement ratio, and type of cement used.
Proper Nc an...
The duration of UltraTech Cement interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 719 interviews
Interview experience
based on 7.4k reviews
Rating in categories
Assistant Manager
1.5k
salaries
| ₹4.5 L/yr - ₹17 L/yr |
Senior Engineer
562
salaries
| ₹4.5 L/yr - ₹13 L/yr |
Assistant Engineer
383
salaries
| ₹2.4 L/yr - ₹9 L/yr |
Engineer
362
salaries
| ₹3 L/yr - ₹11 L/yr |
Manager
357
salaries
| ₹8 L/yr - ₹27 L/yr |
JK Cement
Grasim Industries
ACC
Shree Cement