Filter interviews by
I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.
Given to decode the numbers
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 4 interview rounds.
Top trending discussions
I applied via Approached by Company and was interviewed before Sep 2022. There were 3 interview rounds.
Tell them all KPIs for which I was responsible in my previous organisation
Yes, I am open to adjusting to new locations for career growth and opportunities.
I have previous experience relocating for work and have adapted well to new environments.
I am flexible and willing to explore new places and cultures.
I understand the importance of being adaptable in a dynamic work environment.
I am excited about the prospect of living in a new location and experiencing all it has to offer.
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before Jan 2021. There were 4 interview rounds.
TPM stands for Total Productive Maintenance. It is a systematic approach to equipment maintenance that aims to maximize productivity and minimize downtime.
TPM focuses on proactive and preventive maintenance to keep equipment in optimal condition.
It involves training employees to perform routine maintenance tasks and identify potential issues.
TPM aims to eliminate equipment failures and breakdowns, leading to increased ...
Kanban is a lean manufacturing system that helps manage and improve workflow.
Kanban originated in Japan and means 'visual signal' or 'card'.
It uses visual cues, such as cards or boards, to signal when work should be started or completed.
Kanban helps teams prioritize work, reduce waste, and improve efficiency.
It is commonly used in software development, but can be applied to any industry.
Kanban boards can be physical or...
Grinding is the process of removing material from a workpiece using an abrasive wheel or belt.
Grinding is a common machining process used in manufacturing.
It involves removing material from a workpiece using an abrasive wheel or belt.
The goal of grinding is to achieve a smooth surface finish or to remove excess material.
Grinding can be done manually or using a machine.
Examples of grinding include surface grinding, cyli
Grinding defects refer to the problems that occur during the grinding process.
Burns
Cracks
Chatter
Glazing
Loading
Mismatch
Tearing
Man power can be utilized by assigning tasks based on their skills and strengths.
Identify the strengths and skills of each employee
Assign tasks based on their strengths and skills
Provide training and development opportunities to enhance their skills
Encourage teamwork and collaboration
Monitor progress and provide feedback
Recognize and reward good performance
SMED stands for Single Minute Exchange of Die, a lean manufacturing technique to reduce setup time.
SMED is a process to reduce the time it takes to changeover a production line from one product to another.
It involves breaking down the setup process into smaller steps and finding ways to streamline them.
The goal is to reduce setup time to less than 10 minutes, hence the name Single Minute Exchange of Die.
Examples of SME...
Scrap reduction can be achieved by identifying the root cause of scrap, implementing process improvements, and training employees.
Conduct a thorough analysis of the production process to identify the root cause of scrap
Implement process improvements such as better quality control measures and equipment maintenance
Train employees on proper handling and use of equipment to reduce errors and scrap
Regularly monitor and tra...
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
based on 37 reviews
Rating in categories
Assistant Engineer
250
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Trainee
36
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineer Production
29
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Software Engineer
24
salaries
| ₹0 L/yr - ₹0 L/yr |
Continental
Freudenberg Group
Hutchinson
Eaton